The DOI matches its Crossref record.
Interval scheduling: A survey
Open accessAbstract
In interval scheduling, not only the processing times of the jobs but also their starting times are given. This article surveys the area of interval scheduling and presents proofs of results that have been known within the community for some time. We first review the complexity and approximability of different variants of interval scheduling problems. Next, we motivate the relevance of interval scheduling problems by providing an overview of applications that have appeared in literature. Finally, we focus on algorithmic results for two important variants of interval scheduling problems. In one variant we deal with nonidentical machines: instead of each machine being continuously available, there is a given interval for each machine in which it is available. In another variant, the machines are continuously available but they are ordered, and each job has a given “maximal” machine on which it can be processed. We investigate the complexity of these problems and describe algorithms for their solution. © 2007 Wiley Periodicals, Inc. Naval Research Logistics, 2007
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
No references could be resolved yet.
Research works printed but not linked: 70
- Ahuja R. K., 1993, Network flows
- 10.1016/0377-2217(84)90095-X · doi:10.1016/0377-2217(84)90095-x
- 10.1016/0166-218X(87)90037-0 · DOI
- 10.1145/502102.502107 · doi:10.1145/502102.502107
- 10.1137/S0097539797321237 · doi:10.1137/s0097539797321237
- 10.1137/S0097539799354138 · DOI
- 10.1016/S0305-0548(98)00019-7 · doi:10.1016/s0305-0548(98)00019-7
- 10.1023/A:1009822211065 · doi:10.1023/a:1009822211065
- 10.1007/3-540-45061-0_59 · doi:10.1007/3-540-45061-0_59
- 10.1016/0012-365X(92)90646-W · doi:10.1016/0012-365x(92)90646-w
- Borodin A., 1988, On‐Line computation and competitive analysis
- K. I.Bouzina On interval scheduling problems: A contribution Ph.D. Thesis Case Western Reserve University Cleveland Ohio 1994.
- 10.1007/BF00121680 · doi:10.1007/bf00121680
- 10.1109/TC.2004.1255792 · doi:10.1109/tc.2004.1255792
- 10.1007/BF02238071 · doi:10.1007/bf02238071
- 10.1137/S0097539795283292 · doi:10.1137/s0097539795283292
- 10.1016/0166-218X(93)E0174-W · DOI
- 10.1287/opre.40.1.S28 · doi:10.1287/opre.40.1.s28
- 10.1089/cmb.2005.12.129 · doi:10.1089/cmb.2005.12.129
- J.Chuzhoy S.Guha S.Khanna J. S.Naor “Machine minimization for scheduling jobs with interval constraints” In: Proceedings of the 45th Annual Symposium on Foundations of Computer Science Rome Italy 2004 pp.81–90. · doi:10.1109/focs.2004.38
- J.Chuzhoy J. S.Naor “New hardness results for congestion minimization and machine scheduling” In: Proceedings of the 36th ACM Symposium on the Theory of Computing Chicago Illinois 2004 pp.28–34. · doi:10.1145/1007352.1007364
- 10.1287/moor.1060.0218 · DOI
- M.Cieliebak T.Erlebach F.Hennecke B.Weber P.Widmayer “Scheduling with release times and deadlines on a minimum number of machines” In: Proceedings of the 3rd IFIP International Conference on Theoretical Computer Science Toulouse France 2004 pp.217–230.
- 10.1002/nav.3800010309 · doi:10.1002/nav.3800010309
- 10.1287/opre.31.1.24 · doi:10.1287/opre.31.1.24
- 10.1287/opre.40.1.S76 · doi:10.1287/opre.40.1.s76
- 10.1016/0377-2217(93)90243-G · doi:10.1016/0377-2217(93)90243-g
- 10.1016/S0196-6774(02)00291-2 · doi:10.1016/s0196-6774(02)00291-2
- 10.1006/jagm.1998.1001 · doi:10.1006/jagm.1998.1001
- 10.1016/0166-218X(95)00112-5 · doi:10.1016/0166-218x(95)00112-5
- 10.1002/nav.10044 · doi:10.1002/nav.10044
- 10.1287/opre.35.6.849 · doi:10.1287/opre.35.6.849
- 10.1287/opre.37.3.395 · doi:10.1287/opre.37.3.395
- 10.1287/opre.40.1.S96 · DOI
- 10.1515/9781400875184 · DOI · Paper page
- 10.1016/0377-2217(95)00010-N · doi:10.1016/0377-2217(95)00010-n
- Garey M. R., 1979, Computers and intractability, a guide to the theory of NP‐completeness
- 10.1137/0601025 · doi:10.1137/0601025
- 10.1287/opre.26.1.68 · doi:10.1287/opre.26.1.68
- Golumbic M. C., 1980, Algorithmic graph theory and perfect graphs
- Graves S. C., 1993, Logistics of production and inventory
- 10.1109/TC.1979.1675260 · doi:10.1109/tc.1979.1675260
- 10.1006/jagm.1999.1060 · DOI
- 10.1287/opre.49.1.134.11192 · doi:10.1287/opre.49.1.134.11192
- A.Hashimoto J.Stevens Wire routing by optimizing channel assignment within large apertures Proceedings of the 8th Design Automation Workshop 1971 pp.155–169. · doi:10.1145/800158.805069
- Hochbaum D., 1997, Approximation algorithms for NP‐hard problems
- 10.1007/3-540-45032-7 · doi:10.1007/3-540-45032-7
- Ibaraki T., 1988, Resource allocation problems: Algorithmic approaches
- 10.1016/0377-2217(94)90150-3 · DOI
- 10.1006/jagm.1999.1022 · doi:10.1006/jagm.1999.1022
- 10.1016/0167-6377(92)90087-J · doi:10.1016/0167-6377(92)90087-j
- 10.1016/0377-2217(91)90320-U · doi:10.1016/0377-2217(91)90320-u
- 10.1016/0377-2217(93)90014-E · DOI
- 10.1016/0377-2217(94)90056-6 · doi:10.1016/0377-2217(94)90056-6
- Kolen A. W. J., 1995, Handbook of Combinatorics, 1875
- 10.1016/0377-2217(93)E0335-U · doi:10.1016/0377-2217(93)e0335-u
- 10.1287/opre.45.4.624 · doi:10.1287/opre.45.4.624
- Kroon L. G., 1996, Proceedings of the 22nd International Workshop on Graph‐Theoretic Concepts in Computer Science, 279
- 10.1007/BFb0053971 · doi:10.1007/bfb0053971
- R. J.Lipton A.Tomkins “Online interval scheduling” Proceedings of the fifth annual ACM‐SIAM Symposium on Discrete Algorithms Arlington Virginia 1994 pp.302–311.
- 10.1016/0377-2217(86)90016-0 · doi:10.1016/0377-2217(86)90016-0
- 10.1287/opre.47.6.873 · DOI
- 10.1023/B:JOSH.0000031423.39762.d3 · doi:10.1023/b:josh.0000031423.39762.d3
- 10.1016/0196-6774(82)90030-X · doi:10.1016/0196-6774(82)90030-x
- 10.1137/0211040 · doi:10.1137/0211040
- 10.1016/S0167-6377(98)00019-4 · DOI
- 10.1007/BFb0029570 · doi:10.1007/bfb0029570
- 10.1002/(SICI)1099-1425(199909/10)2:5<215::AID-JOS27>3.0.CO;2-Y · DOI
- Vazirani V. V., 2002, Approximation algorithms
- 10.1016/0304-3975(94)90150-3 · doi:10.1016/0304-3975(94)90150-3
Cited by
On the tractability of satellite range scheduling
Vazquez, A. J., & Erwin, R. S. (2015) · Optimization Letters · doi:10.1007/s11590-014-0744-8 · Cited by 61
Dalyac, C., Henriet, L., Jeandel, E., Lechner, W., Perdrix, S., Porcheron, M., & Veshchezerova, M. (2021) · EPJ Quantum Technology · doi:10.1140/epjqt/s40507-021-00100-3 · Cited by 46
Scheduling multiple agile Earth observation satellites with multiple observations
Wang, X., Han, C., & Leus, R. (2026) · Advances in Space Research · doi:10.1016/j.asr.2025.10.042 · Cited by 24
Metadata
- Authors
- Kolen, A. W. J., Lenstra, J. K., Papadimitriou, C. H., & Spieksma, F. C. R.
- Venue
- Naval Research Logistics (NRL)
- Publisher
- Wiley
- Published
- 2007-03-16
- Volume
- 54
- Issue
- 5
- Pages
- 530-543
- ISSN
- 0894-069X (ISSN-L)
- 1520-6750
- OpenAlex
- W2110171203
- Cited by
- 220
- References
- 0
- FWCI
- 18.11
- Type
- journal article
- Language
- en
- Open access
- bronze
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Interval scheduling: A survey. https://app.cochat.ai/papers/10.1002/nav.20231
- The paper
- Kolen, A. W. J., Lenstra, J. K., Papadimitriou, C. H., & Spieksma, F. C. R. (2007). Interval scheduling: A survey. Naval Research Logistics (NRL). https://doi.org/10.1002/nav.20231
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.