BIM-Based Progress Monitoring
Open accessIntegrity signals
Registry
Cites
Statistics
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
There have been attempts to implement DT in construction, such as monitoring construction work progress and generating a digital model of a bridge using a geometrical model.
“There have been some attempts to implement DT in construction such as in monitoring construction work progress (Braun et al., 2018) and generating the digital model of a bridge using a geometrical model for DT application (Brilakis et al, 2019).”
From A review of digital twin applications in construction (2022) · cites this paper as Braun et al., 2018
Cited by
Sorted by citations
A review of digital twin applications in construction
Madubuike, O. C., Anumba, C. J., & Khallaf, R. (2022) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2022.008 · Cited by 147 · see citing works
“150 In a summarized context, Castaldini (2019) identified the four key components of a DT to include data (such as building systems, external data, and blueprint data), reasoning (such as AI/ML models or non-linear rules), key performance indicators (such as efficiency, emissions, net operating income and safety indic…”
BackgroundMethodInfluential
- Authors
- Braun, A., Tuttas, S., Stilla, U., & Borrmann, A.
- Affiliations
- Technical University of Munich (DE)
- Corresponding author
- Braun, Alexander
- Venue
- Building Information Modeling
- Publisher
- Springer International Publishing
- Published
- 2018
- Pages
- 463-476
- OpenAlex
- W2890415366
- Cited by
- 12
- References
- 0
- Citations by year
- 2026: 1 · 2025: 1 · 2023: 2 · 2022: 4 · 2021: 1 · 2020: 1 · 2018: 1 · 2015: 1
- FWCI
- 2.57
- Type
- book chapter
- Language
- en
- Open access
- green
- mediatum.ub.tum.de
- Licence
- other-oa
- www.springer.com/tdm (tdm)
- Locations
- Springer eBooks (publishedVersion)
- mediaTUM (Technical University of Munich) (submittedVersion, other-oa)
- Topics
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Physical Sciences › Earth and Planetary Sciences › Geology › 3D Surveying and Cultural Heritage
- Physical Sciences › Engineering › Building and Construction › 3D Modeling in Geospatial Applications
- Keywords
- construction progress monitoring, photogrammetry, dense point clouds, disparity map, semi-global matching, deviation detection, construction site monitoring, component detection, dependency relations
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review