The DOI matches its Crossref record.
Project Scheduling
Abstract
Scope and Relevance of Project Scheduling.- The Project Scheduling Process.- Classification of Project Scheduling Problems.- Temporal Analysis: The Basic Deterministic Case.- Temporal Analysis: Advanced Topics.- The Resource-Constrained Project Scheduling Problem.- Resource-Constrained Scheduling: Advanced Topics.- Project Scheduling with Multiple Activity Execution Modes.- Stochastic Project Scheduling.- Robust and Reactive Scheduling.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Operating room planning and scheduling: A literature review
Cardoen, B., Demeulemeester, E., & Beliën, J. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.04.011 · Cited by 1,182
Chemical-Reaction-Inspired Metaheuristic for Optimization
Lam, A. Y. S., & Li, V. O. K. (2010) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2009.2033580 · Cited by 587
A Simulation-Based Process Model for Managing Complex Design Projects
Cho, S.-H., & Eppinger, S. D. (2005) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2005.850722 · Cited by 293
Chemical Reaction Optimization: a tutorial: (Invited paper)
Lam, A. Y. S., & Li, V. O. K. (2012) · Memetic Computing · doi:10.1007/s12293-012-0075-1 · Cited by 285
Satellite downlink scheduling problem: A case study
Karapetyan, D., Mitrovic Minic, S., Malladi, K. T., & Punnen, A. P. (2015) · Omega · doi:10.1016/j.omega.2015.01.001 · Cited by 75
Metadata
- Venue
- International Series in Operations Research & Management Science
- Publisher
- Kluwer Academic Publishers
- Published
- 2002
- OpenAlex
- W2016007273
- Cited by
- 709
- References
- 0
- FWCI
- 30.32
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Project Scheduling. https://app.cochat.ai/papers/10.1007/b101924
- The paper
- Project Scheduling. (2002). International Series in Operations Research & Management Science. https://doi.org/10.1007/b101924
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.