CoChat

Time/sequence-dependent scheduling: the design and evaluation of a general purpose tabu-based adaptive large neighbourhood search algorithm

Open access
He, Lei, de Weerdt, Mathijs, Yorke-Smith, Neil · 2020 · Journal of Intelligent Manufacturing
Cited by 77

The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.

Abstract

In intelligent manufacturing, it is important to schedule orders from customers efficiently. Make-to-order companies may have to reject or postpone orders when the production capacity does not meet the demand. Many such real-world scheduling problems are characterised by processing times being dependent on the start time (time dependency) or on the preceding orders (sequence dependency), and typically have an earliest and latest possible start time. We introduce and analyze four algorithmic ideas for this class of time/sequence-dependent over-subscribed scheduling problems with time windows: a novel hybridization of adaptive large neighbourhood search (ALNS) and tabu search (TS), a new randomization strategy for neighbourhood operators, a partial sequence dominance heuristic, and a fast insertion strategy. Through factor analysis, we demonstrate the performance of these new algorithmic features on problem domains with varying properties. Evaluation of the resulting general purpose algorithm on three domains—an order acceptance and scheduling problem, a real-world multi-orbit agile Earth observation satellite scheduling problem, and a time-dependent orienteering problem with time windows—shows that our hybrid algorithm robustly outperforms general algorithms including a mixed integer programming method, a constraint programming method, recent state-of-the-art problem-dependent meta-heuristic methods, and a two-stage hybridization of ALNS and TS.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1007/s10845-019-01518-4

Cites

3 of 3 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 3 references

Cited by

See all 77

Metadata

Authors
He, L., de Weerdt, M., & Yorke-Smith, N.
Venue
Journal of Intelligent Manufacturing
Published
2019-12-20
Volume
31
Issue
4
Pages
1051-1078
ISSN
  • 0956-5515 (ISSN-L)
  • 1572-8145
OpenAlex
W2994842245
Cited by
77
References
3
FWCI
5.20
Type
journal article
Language
en
Open access
hybrid

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Time/sequence-dependent scheduling: the design and evaluation of a general purpose tabu-based adaptive large neighbourhood search algorithm. https://app.cochat.ai/papers/10.1007/s10845-019-01518-4
The paper
He, L., de Weerdt, M., & Yorke-Smith, N. (2020). Time/sequence-dependent scheduling: the design and evaluation of a general purpose tabu-based adaptive large neighbourhood search algorithm. Journal of Intelligent Manufacturing. https://doi.org/10.1007/s10845-019-01518-4

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.