A novel construction cost prediction model using hybrid natural and light gradient boosting
The DOI matches its Crossref record; 35 of the 35 references it cites were found in a registry or an index.
Abstract
In this paper, we compared the predictive capabilities of six different machine learning algorithms – linear regression, artificial neural network, random forest, extreme gradient boosting, light gradient boosting, and natural gradient boosting – and demonstrated that a hybrid light gradient boosting and natural gradient boosting model provides the most desirable construction cost estimates in terms of the accuracy metrics, uncertainty estimates, and training speed. We also present a game theory-based model interpretation technique to evaluate the average marginal contribution of each feature value, across all possible combinations of features, on the model predictions. The comparison between the predicted cost and the actual cost confirms good alignment with R 2 ∼ 0.99, R M S E ∼ 0.5, and M B E ∼ -0.009. Besides, the proposed hybrid model can provide uncertainty estimates through probabilistic predictions for real-valued outputs. This probabilistic prediction approach produces a holistic probability distribution over the entire outcome space to quantify the uncertainties related to construction cost predictions.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Breiman, L. (2001) · Machine Learning · doi:10.1023/a:1010933404324 · Cited by 133,538
Scikit-learn: Machine Learning in Python
Pedregosa, F., Varoquaux, G., Gramfort, A., Michel, V., Thirion, B., Grisel, O., Blondel, M., Müller, A., Nothman, J., Louppe, G., et al. (2012) · arXiv · doi:10.48550/arxiv.1201.0490 · Cited by 71,016
XGBoost: A Scalable Tree Boosting System
Chen, T., & Guestrin, C. (2016) · Proceedings of the 22nd ACM SIGKDD International Conference on Knowledge Discovery and Data Mining · doi:10.1145/2939672.2939785 · Cited by 54,569
Advances in Neural Information Processing Systems 29
Teymur, O., Zygalakis, K., & Calderhead, B. (2016) · Cited by 13,887
From local explanations to global understanding with explainable AI for trees
Lundberg, S. M., Erion, G., Chen, H., DeGrave, A., Prutkin, J. M., Nair, B., Katz, R., Himmelfarb, J., Bansal, N., & Lee, S.-I. (2020) · Nature Machine Intelligence · doi:10.1038/s42256-019-0138-9 · Cited by 10,551
LightGBM: A Highly Efficient Gradient Boosting Decision Tree
(2017) · HAL · Cited by 10,512
Learning Deep Architectures for AI
Bengio, Y. (2009) · Foundations and Trends® in Machine Learning · doi:10.1561/2200000006 · Cited by 9,239
Learning Deep Architectures for AI
Bengio, Y. (2009) · now publishers, Inc. eBooks · doi:10.1561/9781601982957 · Cited by 4,941
xgboost: Extreme Gradient Boosting
Chen, T., He, T., Benesty, M., Khotilovich, V., Tang, Y., Cho, H., Chen, K., Mitchell, R., Cano, I., Zhou, T., et al. (2014) · CRAN: Contributed Packages · doi:10.32614/cran.package.xgboost · Cited by 2,025
Big Data in the construction industry: A review of present status, opportunities, and future trends
Bilal, M., Oyedele, L. O., Qadir, J., Munir, K., Ajayi, S. O., Akinade, O. O., Owolabi, H. A., Alaka, H. A., & Pasha, M. (2016) · Advanced Engineering Informatics · doi:10.1016/j.aei.2016.07.001 · Cited by 929
NGBoost: Natural Gradient Boosting for Probabilistic Prediction
Duan, T., Avati, A., Ding, D. Y., Thai, K. K., Basu, S., Ng, A. Y., & Schuler, A. (2020) · International Conference on Machine Learning · Cited by 555
NGBoost: Natural Gradient Boosting for Probabilistic PredictionPreprint
Duan, T., Avati, A., Ding, D. Y., Thai, K. K., Basu, S., Ng, A. Y., & Schuler, A. (2019) · arXiv (Cornell University) · doi:10.48550/arxiv.1910.03225 · Cited by 348
A neural network approach for early cost estimation of structural systems of buildings
Murat Günaydın, H., & Zeynep Doğan, S. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.04.002 · Cited by 285
Artificial Intelligence and Parametric Construction Cost Estimate Modeling: State-of-the-Art Review
Elmousalami, H. H. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001678 · Cited by 229
Cheng, M.-Y., Tsai, H.-C., & Sudjono, E. (2010) · Expert Systems with Applications · doi:10.1016/j.eswa.2009.11.080 · Cited by 163
Cheng, M., Tsai, H., & Hsieh, W.-S. (2008) · Automation in Construction · doi:10.1016/j.autcon.2008.07.001 · Cited by 154
A framework for data-driven informatization of the construction company
You, Z., & Wu, C. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.02.002 · Cited by 153
Support Vector Machine Regression for project control forecasting
Wauters, M., & Vanhoucke, M. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.07.014 · Cited by 147
Elfahham, Y. (2019) · Alexandria Engineering Journal · doi:10.1016/j.aej.2019.05.002 · Cited by 130
Optimized artificial intelligence models for predicting project award price
Chou, J., Lin, C.-W., Pham, A., & Shao, J.-Y. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.006 · Cited by 112
Manufacturing cost estimation based on a deep-learning method
Ning, F., Shi, Y., Cai, M., Xu, W., & Zhang, X. (2019) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2019.12.005 · Cited by 107
Cost estimation in road construction using artificial neural network
Tijanić, K., Car-Pušić, D., & Šperac, M. (2019) · Neural Computing and Applications · doi:10.1007/s00521-019-04443-y · Cited by 105
van Rijswijk, L. (1999) · PubMed · Cited by 92
Cheng, M., Hoang, N., & Wu, Y.-W. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.05.018 · Cited by 91
Guidelines for applied machine learning in construction industry—A case of profit margins estimation
Bilal, M., & Oyedele, L. O. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.101013 · Cited by 87
Son, H., Kim, C., & Kim, C. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.05.013 · Cited by 78
Zhou, C., Ding, L., Skibniewski, M. J., Luo, H., & Zhang, H. T. (2018) · Advanced Engineering Informatics · doi:10.1016/j.aei.2018.06.011 · Cited by 77
Performance evaluation of normalization-based CBR models for improving construction cost estimation
Ahn, J., Ji, S., Ahn, S. J., Park, M., Lee, H., Kwon, N., Lee, E., & Kim, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103329 · Cited by 74
Improving the Accuracy of Early Cost Estimates on Transportation Infrastructure Projects
Karaca, I., Gransberg, D. D., & Jeong, H. D. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000819 · Cited by 71
Range estimation of construction costs using neural networks with bootstrap prediction intervals
Sönmez, R. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.02.042 · Cited by 59
Conceptual Estimation of Construction Costs Using the Multistep Ahead Approach
Dursun, O., & Stoy, C. (2016) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001150 · Cited by 49
Cost Estimation Methods for Transport Infrastructure: A Systematic Literature Review
Barakchi, M., Torp, O., & Belay, A. M. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.07.199 · Cited by 45
CBR Revision Model for Improving Cost Prediction Accuracy in Multifamily Housing Projects
Ji, C., Hong, T., & Hyun, C.-T. (2010) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000018 · Cited by 39
El-Kholy, A. M., Tahwia, A. M., & Elsayed, M. M. (2020) · International Journal of Construction Management · doi:10.1080/15623599.2020.1741492 · Cited by 39
Gardner, B. J., Gransberg, D. D., & Rueda, J. A. (2016) · ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems Part A Civil Engineering · doi:10.1061/ajrua6.0000895 · Cited by 31
Cited by
Kavzoglu, T., & Teke, A. (2022) · Arabian Journal for Science and Engineering · doi:10.1007/s13369-022-06560-8 · Cited by 371
Metadata
- Authors
- Chakraborty, D., Elhegazy, H., Elzarka, H., & Gutierrez, L.
- Venue
- Advanced Engineering Informatics
- Publisher
- Elsevier BV
- Published
- 2020-10
- Volume
- 46
- Pages
- 101201
- ISSN
- 1474-0346 (ISSN-L)
- OpenAlex
- W3096140803
- Cited by
- 222
- References
- 35
- FWCI
- 13.39
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.