The DOI matches its Crossref record.
Enhancing construction quality inspection and management using RFID technology
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Park, C.-S., Lee, D.-Y., Kwon, O.-S., & Wang, X. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.09.010 · Cited by 367
Digital construction: From point solutions to IoT ecosystem
Woodhead, R., Stephenson, P., & Morrey, D. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.05.004 · Cited by 310
Construction worker detection in video frames for initializing vision trackers
Park, M.-W., & Brilakis, I. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.06.001 · Cited by 265
Scenarios for applying RFID technology in construction project management
Lu, W., Huang, G. Q., & Li, H. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.007 · Cited by 261
Nnaji, C., & Karakhan, A. A. (2020) · Journal of Building Engineering · doi:10.1016/j.jobe.2020.101212 · Cited by 254
Recent advancements of robotics in construction
Xiao, B., Chen, C., & Yin, X. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104591 · Cited by 204
Cyber-physical systems integration of building information models and the physical construction
Akanmu, A., & Anumba, C. J. (2015) · Engineering, Construction and Architectural Management · doi:10.1108/ecam-07-2014-0097 · Cited by 122
Metadata
- Authors
- Wang, L.-C.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2008-05
- Volume
- 17
- Issue
- 4
- Pages
- 467-479
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W1967013371
- Cited by
- 237
- References
- 0
- FWCI
- 29.61
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.