The DOI matches its Crossref record.
Point cloud quality requirements for Scan-vs-BIM based automated construction progress monitoring
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Wang, Q., & Kim, M.-K. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.02.007 · Cited by 461
Computer vision techniques in construction: A critical review
Xu, S., Wang, J., Shou, W., Ngo, T., Sadick, A.-M., & Wang, X. (2021) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-020-09504-3 · Cited by 409
A universal 3D imaging sensor on a silicon photonics platform
Rogers, C., Piggott, A. Y., Thomson, D. J., Wiser, R. F., Opris, I. E., Fortune, S. A., Compston, A. J., Gondarenko, A., Meng, F., Chen, X., et al. (2021) · Nature · doi:10.1038/s41586-021-03259-y · Cited by 405
Wang, Q., Tan, Y., & Mei, Z. (2020) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-019-09320-4 · Cited by 272
Metadata
- Authors
- Rebolj, D., Pučko, Z., Babič, N. Č., Bizjak, M., & Mongus, D.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2017-12
- Volume
- 84
- Pages
- 323-334
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2763504448
- Cited by
- 202
- References
- 0
- FWCI
- 11.05
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Point cloud quality requirements for Scan-vs-BIM based automated construction progress monitoring. https://app.cochat.ai/papers/10.1016/j.autcon.2017.09.021
- The paper
- Rebolj, D., Pučko, Z., Babič, N. Č., Bizjak, M., & Mongus, D. (2017). Point cloud quality requirements for Scan-vs-BIM based automated construction progress monitoring. Automation in Construction. https://doi.org/10.1016/j.autcon.2017.09.021
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.