Prioritizing object types for modelling existing industrial facilities
Open accessIntegrity signals
Registry
Cites
Statistics
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Although these processes are automated, they are still time-consuming when compared to employing digital models generated using BIM.
“It is observed that although these processes are automated, they are still time-consuming when compared to employing digital models generated using BIM.”
From A review of digital twin applications in construction (2022) · cites this paper as Agapaki et al., 2018
Cited by
Sorted by citations
A review of digital twin applications in construction
Madubuike, O. C., Anumba, C. J., & Khallaf, R. (2022) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2022.008 · Cited by 147 · see citing works
“This was determined by Agapaki et al. (2018) who identified that the man-hours spent in modeling 53,834 pipes were around 5,200 labor hours, which can be employed in other productive areas if the digital models of the facilities are available. However, efforts are being made to automate the modeling process of existin…”
BackgroundMethodInfluential
- Authors
- Agapaki, E., Miatt, G., & Brilakis, I.
- Affiliations
- University of Cambridge (GB)
- Corresponding author
- Agapaki, Eva
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2018-12
- Volume
- 96
- Pages
- 211-223
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2895459625
- Cited by
- 43
- References
- 0
- Citations by year
- 2026: 4 · 2025: 3 · 2024: 6 · 2023: 10 · 2022: 7 · 2021: 8 · 2020: 1 · 2019: 4
- FWCI
- 2.60
- Type
- journal article
- Language
- en
- Open access
- Licence
- Locations
- Automation in Construction (publishedVersion)
- Cambridge University Engineering Department Publications Database (submittedVersion)
- Apollo (University of Cambridge) (submittedVersion, cc-by-nc-nd)
- Apollo
- Funders
- Engineering and Physical Sciences Research Council
- AVEVA Group Plc. (RG83104)
- BP International Centre for Business and Technology (RG90532)
- Topics
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Physical Sciences › Earth and Planetary Sciences › Geology › 3D Surveying and Cultural Heritage
- Physical Sciences › Engineering › Building and Construction › 3D Modeling in Geospatial Applications
- Keywords
- cylinder detection, pipes, electrical conduits, circular hollow sections
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review