The DOI matches its Crossref record.
A digital construction framework integrating building information modeling and reverse engineering technologies for renovation projects
Abstract
This study proposes a digital construction framework that integrates building information modeling (BIM) and reverse engineering (RE) to improve information utilization in different phases and thus reduce mistakes and reworks in renovation projects during urban renewal. Three-dimensional (3D) laser scanning is used to enable the RE process. This framework also incorporates supporting technologies (virtual reality, 3D printing, and prefabrication) for a better understanding of design and construction as well as tools (work breakdown structure and model breakdown structure) for enhanced organization and management quality. Implementing this proposed framework in a renovated shopping center in Hainan, China optimized efficiency of the renovation process by 15%, eliminated design changes by 30% and reworks by 25%, and finally saved two months and 7.41% of cost regarding the steel structure canopy. Thus, this framework can proactively reduce occurrences of mistakes and reworks during the renovation process, greatly improving the effectiveness of urban renewal.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Construction 4.0: A Literature Review
Forcael, E., Ferrari, I., Opazo-Vega, A., & Pulido-Arcas, J. A. (2020) · Sustainability · doi:10.3390/su12229755 · Cited by 319
Taheri, A., & Sobanjo, J. (2024) · Infrastructures · doi:10.3390/infrastructures9060090 · Cited by 17
Metadata
- Authors
- Ding, Z., Liu, S., Liao, L., & Zhang, L.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2019-06
- Volume
- 102
- Pages
- 45-58
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2917210376
- Cited by
- 163
- References
- 0
- FWCI
- 12.65
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.