CoChat

BIM-based Last Planner System tool for improving construction project management

Heigermoser, Daniel, García de Soto, Borja, Abbott, Ernest Leslie Sidney, Chua, David Kim Huat · 2019 · Automation in Construction
Cited by 201

The DOI matches its Crossref record.

Abstract

The Architecture, Engineering & Construction (AEC) industry strongly affects the economy, the environment, and society as a whole. However, when compared to other industries, its productivity, over recent decades, has been very low. Currently, the AEC industry is undergoing major changes, mostly driven by the implementation of Building Information Modeling (BIM), and the integration of new technologies. When coupling these with Lean principles, there is the potential to improve the productivity and efficiency of construction projects. Although Lean Construction and BIM are approaches with quite different initiatives, both have a profound impact on the industry. Many studies have shown the advantages of the Last Planner System (LPS), yet its integration with BIM technology has not been fully exploited. The Last Planner System of Production Control – a production planning system designed to produce a more reliable project plan – and the principle of promoting continuous improvement are introduced. By capitalizing on the synergies between Lean Construction and BIM, this study proposes a construction management tool that combines the LPS with the 3D visualization of construction projects to improve productivity and reduce construction waste. The prototype tool is mainly aimed to be used as a construction management tool during the construction phase. The tool allows dividing construction projects into work zones, obtaining a fully automated quantity take-off, and offers a color-coded 4D construction simulation for the short-term planning process of the LPS. It allows for a systematic evaluation and analysis of the construction planning in terms of productivity, manpower allocation, and quantification of waste considering the short-term planning process, which promotes continuous improvement of future construction planning.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.autcon.2019.03.019

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 201

Metadata

Authors
Heigermoser, D., García de Soto, B., Abbott, E. L. S., & Chua, D. K. H.
Venue
Automation in Construction
Publisher
Elsevier BV
Published
2019-08
Volume
104
Pages
246-254
ISSN
0926-5805 (ISSN-L)
OpenAlex
W2942879347
Cited by
201
References
0
FWCI
13.31
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: BIM-based Last Planner System tool for improving construction project management. https://app.cochat.ai/papers/10.1016/j.autcon.2019.03.019
The paper
Heigermoser, D., García de Soto, B., Abbott, E. L. S., & Chua, D. K. H. (2019). BIM-based Last Planner System tool for improving construction project management. Automation in Construction. https://doi.org/10.1016/j.autcon.2019.03.019

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.