The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Completing the missing link in building design process: Enhancing post-occupancy evaluation method for effective feedback for building performance
Abstract
Abstract This paper provides a review of the improvements in the evaluation of building performance and introduces a new method for post-occupancy evaluation (POE) to complete the missing link in the building design process. Existing studies were reviewed to understand the possible reasons for the missing link of “building performance feedback”. The intention of this paper is to set out a new vision for how future post-occupancy evaluation can close the building performance feedback loop to better inform building design. The spatial mapping method adopted extends the use of building information modeling (BIM), which has shown great potential for the future of the Architecture, Engineering and Construction (AEC) industry, and uses geographical information systems (GIS), which is a powerful tool for analyzing and visualizing relationships between geographical units and their data. This study explores how to establish a communication platform for different stakeholders in order to engage them in the collaborative effort of continuous building performance improvement by using the results of POE embedded into BIM. In this paper, the experiences of a POE study of a LEED® Platinum building and a historical building on a university campus are reported as examples to illustrate the proposed new method.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The project benefits of Building Information Modelling (BIM)
Bryde, D., Broquetas, M., & Volm, J. M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.12.001 · Cited by 1,268
Mapping the Political Landscape: Toward a GIS Analysis of Environmental and Social Difference
Kosiba, S., & Bauer, A. M. (2013) · Journal of Archaeological Method and Theory · doi:10.1007/s10816-011-9126-z · Cited by 80
Cited by
Occupant productivity and office indoor environment quality: A review of the literature
Al Horr, Y., Arif, M., Kaushik, A., Mazroei, A., Katafygiotou, M., & Elsarrag, E. (2016) · Building and Environment · doi:10.1016/j.buildenv.2016.06.001 · Cited by 843
Integration of BIM and GIS in sustainable built environment: A review and bibliometric analysis
Wang, H., Pan, Y., & Luo, X. (2019) · Automation in Construction · doi:10.1016/j.autcon.2019.03.005 · Cited by 384
Post-occupancy evaluation: State-of-the-art analysis and state-of-the-practice review
Li, P., Froese, T. M., & Brager, G. (2018) · Building and Environment · doi:10.1016/j.buildenv.2018.02.024 · Cited by 343
Xia, H., Liu, Z., Efremochkina, M., Liu, X., & Lin, C. (2022) · Sustainable Cities and Society · doi:10.1016/j.scs.2022.104009 · Cited by 341
Post-occupancy evaluation in architecture: experiences and perspectives from UK practice
Hay, R., Samuel, F., Watson, K. J., & Bradbury, S. (2018) · Building Research & Information · doi:10.1080/09613218.2017.1314692 · Cited by 124
Metadata
- Authors
- Göçer, Ö., Hua, Y., & Göçer, K.
- Venue
- Building and Environment
- Publisher
- Elsevier BV
- Published
- 2015-07
- Volume
- 89
- Pages
- 14-27
- ISSN
- 0360-1323 (ISSN-L)
- OpenAlex
- W2061077813
- Cited by
- 166
- References
- 2
- FWCI
- 16.68
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Completing the missing link in building design process: Enhancing post-occupancy evaluation method for effective feedback for building performance. https://app.cochat.ai/papers/10.1016/j.buildenv.2015.02.011
- The paper
- Göçer, Ö., Hua, Y., & Göçer, K. (2015). Completing the missing link in building design process: Enhancing post-occupancy evaluation method for effective feedback for building performance. Building and Environment. https://doi.org/10.1016/j.buildenv.2015.02.011
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.