Environmental life cycle assessment of underground metro rail: A case study in Mumbai Metropolitan Region, India
Abstract
The metro rail systems have been vigorously promoted to reduce the emissions from the urban transport sector in India. However, their construction and operation are associated with high energy consumption and corresponding emissions. This study evaluated the life cycle environmental impact of the first underground metro rail transit in the Mumbai Metropolitan Region, India. The system boundary comprises the construction and maintenance of the tunnel, underground stations, slab track, power supply system, and trains. The operation phase accounts for the traction power demand for running trains and auxiliary power demand for operating the station services. GaBi 6.5 has been used to normalize the results per track-km (TKM) of the metro line and per passenger-km travelled (PKT). It has been found that the construction of underground stations is the major contributor (70% of 17300 t CO2-eq/TKM, 52 t SO2-eq/TKM) to the life cycle impact of the infrastructure, whereas the auxiliary power demand dominates the life cycle impact (63% of 25 g CO2-eq/PKT) of the metro rail. Further results show that the door-to-door trip with a local bus service will have a 58% lower impact than a competing sedan trip. On the basis of these results, possible recommendations were proposed, such as deploying the energy-efficient trains and metro stations, utilizing electricity that has met renewable goals, and endorsing high ridership. This study provides a background data to quantify the environmental imp…
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The operational energy demand includes 437 MWh/day for traction and 770 MWh/day for auxiliary functions.
“This includes 437 MWh/day for traction (train movement) and 770 MWh/day for auxiliary functions”
From Evaluating the emission reduction potential of first underground metro rail in Mumbai, India through a modal shift and energy use perspective (2025) · cites this paper as [13]
The total operational energy demand of the metro system is 1207 MWh/day.
“The total operational energy demand of the metro system was estimated to be 1207 MWh/day [13].”
From Evaluating the emission reduction potential of first underground metro rail in Mumbai, India through a modal shift and energy use perspective (2025) · cites this paper as [13]
Cited by
Sorted by citations
Aryan, Y., Shinde, A. M., & Dikshit, A. K. (2025) · Discover Sustainability · doi:10.1007/s43621-025-01994-0 · Cited by 3 · see citing works
Self-citationEnvironmental life cycle assessment of single-use and reusable food takeaway containers
Kadabinakatti, S., & Shinde, A. (2025) · Acta Periodica Technologica · doi:10.2298/apt250512018k
Self-citation
- Authors
- Shinde, A. M., Dikshit, A. K., & Soni, A.
- Venue
- Environmental Impact Assessment Review
- Publisher
- Elsevier BV
- Published
- 2024-05
- Volume
- 106
- Pages
- 107501
- ISSN
- 0195-9255
- Cited by
- 33
- References
- 0
- Language
- en
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review