The DOI matches its Crossref record; 56 of the 56 references it cites were found in a registry or an index.
Analytic hierarchy process: An overview of applications
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The Analytic Hierarchy Process
SAATY, T. L., & KEARNS, K. P. (1985) · Analytical Planning · doi:10.1016/b978-0-08-032599-6.50008-8 · Cited by 15,357
Ghodsypour, S. H., & O'Brien, C. (1998) · International Journal of Production Economics · doi:10.1016/s0925-5273(97)00009-1 · Cited by 1,356
The Analytic Hierarchy Process—A Survey of the Method and its Applications
Zahedi, F. (1986) · Interfaces · doi:10.1287/inte.16.4.96 · Cited by 1,329
The Analytic Hierarchy Process: Structuring, Measurement, and Synthesis
Wang, J., Chakraborty, C., & Ouyang, H. (2011) · Encyclopedia of Decision Making and Decision Support Technologies · doi:10.4018/9781599048437.ch003 · Cited by 1,328
An overview of the analytic hierarchy process and its applications
Vargas, L. G. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90056-h · Cited by 1,290
Aggregating individual judgments and priorities with the analytic hierarchy process
Forman, E., & Peniwati, K. (1998) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00244-0 · Cited by 1,146
Application of the AHP in project management
Al-Harbi, K. M. A.-S. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,125
Handfield, R., Walton, S. V., Sroufe, R., & Melnyk, S. A. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(01)00261-2 · Cited by 1,057
An application of the AHP in vendor selection of a telecommunications system
Tam, M. C. Y., & Tummala, V. M. R. (2001) · Omega · doi:10.1016/s0305-0483(00)00039-6 · Cited by 852
Cheng, C.-H. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(96)00026-4 · Cited by 482
Multiple criteria decision making combined with finance: A categorized bibliographic study
Steuer, R. E., & Na, P. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00774-9 · Cited by 392
Group decision making in a multiple criteria environment: A case using the AHP in software selection
Lai, V. S., Wong, B. K., & Cheung, W. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(01)00084-4 · Cited by 388
Badri, M. A. (1999) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00249-7 · Cited by 348
Determining key capabilities of a firm using analytic hierarchy process
Hafeez, K., Zhang, Y., & Malak, N. (2002) · International Journal of Production Economics · doi:10.1016/s0925-5273(01)00141-4 · Cited by 340
A GP-AHP method for solving group decision-making fuzzy AHP problems
Yu, C.-S. (2002) · Computers & Operations Research · doi:10.1016/s0305-0548(01)00068-5 · Cited by 317
A hierarchical AHP/DEA methodology for the facilities layout design problem
Yang, T., & Kuo, C. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00251-5 · Cited by 314
Quantitative models for performance measurement system
Suwignjo, P., Bititci, U. S., & Carrie, A. S. (2000) · International Journal of Production Economics · doi:10.1016/s0925-5273(99)00061-4 · Cited by 256
MAFMA: multi‐attribute failure mode analysis
Braglia, M. (2000) · International Journal of Quality & Reliability Management · doi:10.1108/02656710010353885 · Cited by 244
Liberatore, M. J. (1987) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1987.6498854 · Cited by 242
A combined AHP–GP model for quality control systems
Badri, M. A. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00077-3 · Cited by 240
An application of quality function deployment to improve the quality of teaching
Lam, K., & Zhao, X. (1998) · International Journal of Quality & Reliability Management · doi:10.1108/02656719810196351 · Cited by 238
Preference programming through approximate ratio comparisons
Salo, A. A., & Hämäläinen, R. P. (1995) · European Journal of Operational Research · doi:10.1016/0377-2217(93)e0224-l · Cited by 230
DS/AHP method: A mathematical analysis, including an understanding of uncertainty
Beynon, M. (2002) · European Journal of Operational Research · doi:10.1016/s0377-2217(01)00230-2 · Cited by 212
Selection of web sites for online advertising using the AHP
Ngai, E. W. T. (2003) · Information & Management · doi:10.1016/s0378-7206(02)00004-6 · Cited by 207
Abdi, M. R., & Labib, A. (2003) · International Journal of Production Research · doi:10.1080/0020754031000077266 · Cited by 202
Ryan Cook, D., Staschak, S., & Green, W. T. (1990) · European Journal of Operational Research · doi:10.1016/0377-2217(90)90060-o · Cited by 197
Lai, V. S., Trueblood, R. P., & Wong, B. K. (1999) · Information & Management · doi:10.1016/s0378-7206(99)00021-x · Cited by 184
A methodological framework for evaluating environmentally conscious manufacturing programs
Sarkis, J. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00166-7 · Cited by 170
A comparative site evaluation study for relocating Japanese government agencies out of Tokyo
Takamura, Y., & Tone, K. (2003) · Socio-Economic Planning Sciences · doi:10.1016/s0038-0121(02)00049-6 · Cited by 164
Preference simulation and preference programming: robustness issues in priority derivation
Arbel, A., & Vargas, L. G. (1993) · European Journal of Operational Research · doi:10.1016/0377-2217(93)90164-i · Cited by 156
Ranking of enterprises based on multicriterial analysis
Babić, Z., & Tomić-Plazibat, N. (1998) · International Journal of Production Economics · doi:10.1016/s0925-5273(97)00133-3 · Cited by 152
Using the analytic hierarchy process for information system project selection
Muralidhar, K., Santhanam, R., & Wilson, R. L. (1990) · Information & Management · doi:10.1016/0378-7206(90)90055-m · Cited by 123
The Analytic Hierarchy Process in an uncertain environment: A simulation approach
Hauser, D. N., & Tadikamalla, P. R. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00002-x · Cited by 118
Planning and design of industrial engineering education quality
Köksal, G., & Eğitman, A. (1998) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(98)00178-8 · Cited by 118
An evaluation of success factors using the AHP to implement ISO 14001‐based EMS
Chin, K., Chiu, S., & Tummala, V. M. R. (1999) · International Journal of Quality & Reliability Management · doi:10.1108/02656719910248226 · Cited by 113
Bolloju, N. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(99)00369-0 · Cited by 109
Optimization models for quality and cost of modular software systems
Jung, H. W., & Choi, B. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00169-6 · Cited by 99
Multi-criteria assessment of the probability of winning in the competitive bidding process
Cagno, E., Caron, F., & Perego, A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00020-x · Cited by 99
Information Resource Planning for a Health-Care System Using an AHP-Based Goal Programming Method
Lee, C. W., & Kwak, N. K. (1999) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600821 · Cited by 98
Multi‐attribute analysis of ISO 9000 registration using AHP
Crowe, T. J., Noble, J. S., & Machimada, J. S. (1998) · International Journal of Quality & Reliability Management · doi:10.1108/02656719810368495 · Cited by 95
Sloane, E. B., Liberatore, M. J., Nydick, R. L., Luo, W., & Chung, Q. B. (2003) · Computers & Operations Research · doi:10.1016/s0305-0548(02)00187-9 · Cited by 93
A methodology for priority setting with application to software development process
Lee, M., Pham, H., & Zhang, X. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00320-8 · Cited by 82
Forecasting the resurgence of the US economy in 2001: an expert judgment approach
Blair, A. R., Nachtmann, R., Saaty, T. L., & Whitaker, R. (2002) · Socio-Economic Planning Sciences · doi:10.1016/s0038-0121(01)00025-8 · Cited by 67
The decision by the US congress on China's trade status: a multicriteria analysis
Saaty, T. L., & Cho, Y. (2001) · Socio-Economic Planning Sciences · doi:10.1016/s0038-0121(01)00016-7 · Cited by 66
Use of the analytic hierarchy process to measure the initial viability of industrial projects
Alidi, A. S. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00076-3 · Cited by 65
Multi-objective analysis of hospital delivery systems
Rossetti, M. D., & Selandari, F. (2001) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(01)00058-4 · Cited by 52
Determining optimum edible films for kiwifruits using an analytical hierarchy process
Shi-ying, X., Xu, L. D., & Chen, X. (2002) · Computers & Operations Research · doi:10.1016/s0305-0548(02)00040-0 · Cited by 50
Promoting shared health care decision making using the analytic hierarchy process
Singpurwalla, N., Forman, E. H., & Zalkind, D. L. (1999) · Socio-Economic Planning Sciences · doi:10.1016/s0038-0121(99)00009-9 · Cited by 38
Decision counseling for men considering prostate cancer screening
Liberatore, M. J., Myers, R. E., Nydick, R. L., Steinberg, M. B., Brown, E. R., Gay, R., Powell, T., & Powell, R. L. (2003) · Computers & Operations Research · doi:10.1016/s0305-0548(02)00186-7 · Cited by 30
Using knowledge-based systems for strategic market assessment
Liberatore, M. J., & Stylianou, A. C. (1994) · Information & Management · doi:10.1016/0378-7206(94)90050-7 · Cited by 29
Integration of technical, cost, and schedule risks in project management
Riggs, J. L., Brown, S. B., & Trueblood, R. P. (1994) · Computers & Operations Research · doi:10.1016/0305-0548(94)90101-5 · Cited by 28
A decision-support model for investment decisions in new ventures
Jain, B. A., & Nag, B. N. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00154-9 · Cited by 27
Reliability metric for information systems based on customer requirements
Zahedi, F. M. (1997) · International Journal of Quality & Reliability Management · doi:10.1108/02656719710181312 · Cited by 24
Li, Q., & Sherali, H. D. (2003) · Computers & Operations Research · doi:10.1016/s0305-0548(02)00189-2 · Cited by 21
Forecasting the capabilities of the Korean civil aircraft industry
Kim, S.-B., & Whang, K.-S. (1993) · Omega · doi:10.1016/0305-0483(93)90041-i · Cited by 20
Dependency and its predictions for systems and its components
Vaidya, O. S., & Kumar, S. (2003) · International Journal of Quality & Reliability Management · doi:10.1108/02656710310500860 · Cited by 11
Self-citation
Cited by
A state-of the-art survey of TOPSIS applications
Behzadian, M., Khanmohammadi Otaghsara, S., Yazdani, M., & Ignatius, J. (2012) · Expert Systems with Applications · doi:10.1016/j.eswa.2012.05.056 · Cited by 2,690
Wang, G., Gunasekaran, A., Ngai, E. W. T., & Papadopoulos, T. (2016) · International Journal of Production Economics · doi:10.1016/j.ijpe.2016.03.014 · Cited by 1,545
Review of the main developments in the analytic hierarchy process
Ishizaka, A., & Labib, A. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.04.143 · Cited by 1,230
Mardani, A., Jusoh, A., MD Nor, K., Khalifah, Z., Zakwan, N., & Valipour, A. (2015) · Economic Research-Ekonomska Istraživanja · doi:10.1080/1331677x.2015.1075139 · Cited by 1,164
Integrated analytic hierarchy process and its applications – A literature review
Ho, W. (2008) · European Journal of Operational Research · doi:10.1016/j.ejor.2007.01.004 · Cited by 1,159
Metadata
- Authors
- Vaidya, O. S., & Kumar, S.
- Venue
- European Journal of Operational Research
- Publisher
- Elsevier BV
- Published
- 2006-02
- Volume
- 169
- Issue
- 1
- Pages
- 1-29
- ISSN
- 0377-2217 (ISSN-L)
- OpenAlex
- W2092553756
- Cited by
- 3,800
- References
- 56
- FWCI
- 37.73
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.