CoChat

Fixed interval scheduling: Models, applications, computational complexity and algorithms

Kovalyov, Mikhail Y., Ng, C.T., Cheng, T.C. Edwin · 2007 · European Journal of Operational Research
Cited by 159

The DOI matches its Crossref record; 37 of the 37 references it cites were found in a registry or an index.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.ejor.2006.01.049

Cites

37 of 37 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 37 references

Research works printed but not linked: 61

  1. Babel, 1994, A fast algorithm for the maximum weight clique problem, Computing, 52, 31, 10.1007/BF02243394 · doi:10.1007/bf02243394
  2. Bach, 2003, Tight bounds on the competitive ratio on accomodating sequences for the seat reservation problem, Journal of Scheduling, 6, 131, 10.1023/A:1022985808959 · doi:10.1023/a:1022985808959
  3. Balakrishnan, 1999, Early/tardy scheduling with sequence dependent setups on uniform parallel machines, Computers and Operations Research, 26, 127, 10.1016/S0305-0548(98)00051-3 · doi:10.1016/s0305-0548(98)00051-3
  4. Balas, 1987, On the maximum weight clique problem, Mathematics of Operations Research, 12, 522, 10.1287/moor.12.3.522 · doi:10.1287/moor.12.3.522
  5. Battiti, 2001, Reactive local search for the maximum clique problem, Algorithmica, 29, 610, 10.1007/s004530010074 · doi:10.1007/s004530010074
  6. Bar-Noy, 2001, A unified approach to approximating resource allocation and scheduling, Journal of the ACM, 48, 1069, 10.1145/502102.502107 · doi:10.1145/502102.502107
  7. Bhatia, 2003, Algorithmic aspects of bandwidth trading, Lecture Notes in Computer Science, 2719, 751, 10.1007/3-540-45061-0_59 · doi:10.1007/3-540-45061-0_59
  8. Bouzina, 1996, Interval scheduling on identical machines, Journal of Global Optimization, 9, 379, 10.1007/BF00121680 · doi:10.1007/bf00121680
  9. Brehob, 2004, Optimal replacement is NP-hard for nonstandard caches, IEEE Transactions on Computers, 53, 73, 10.1109/TC.2004.1255792 · doi:10.1109/tc.2004.1255792
  10. Brucker, 1994, The k-track assignment problem, Computing, 52, 97, 10.1007/BF02238071 · doi:10.1007/bf02238071
  11. Carter, 1992, When is the classroom assignment problem hard?, Operations Research, 40, 28, 10.1287/opre.40.1.S28 · doi:10.1287/opre.40.1.s28
  12. Chen, 2002, Allocation of bandwidth and storage, IIE Transactions, 34, 501, 10.1080/07408170208928886 · doi:10.1080/07408170208928886
  13. Chen, 2003, More reliable protein NMR peak assignment via improved 2-interval scheduling, Lecture Notes in Computer Science, 2832, 580, 10.1007/978-3-540-39658-1_53 · doi:10.1007/978-3-540-39658-1_53
  14. Chmeiss, 1997, A generalization of chordal graphs and the maximum clique problem, Information Processing Letters, 62, 61, 10.1016/S0020-0190(97)00044-6 · doi:10.1016/s0020-0190(97)00044-6
  15. Chudnovsky, 2005, Recognizing Berge graphs, Combinatorica, 25, 143, 10.1007/s00493-005-0012-8 · doi:10.1007/s00493-005-0012-8
  16. Chudnovsky, 2006, The strong perfect graph theorem, Annals of Mathematics, 164, 51, 10.4007/annals.2006.164.51 · doi:10.4007/annals.2006.164.51
  17. Chudnovsky, 2003, Progress on perfect graphs, Mathematical Programming Series B, 97, 405, 10.1007/s10107-003-0449-8 · doi:10.1007/s10107-003-0449-8
  18. Dantzig, 1954, Minimizing the number of tankers to meet a fixed schedule, Naval Research Logistics Quarterly, 1, 217, 10.1002/nav.3800010309 · doi:10.1002/nav.3800010309
  19. Dijkstra, 1991, A DSS for capacity planning of aircraft maintenance personnel, International Journal of Production Research, 23, 69, 10.1016/0925-5273(91)90049-Y · doi:10.1016/0925-5273(91)90049-y
  20. Dondeti, 1992, Fixed job scheduling with two types of processors, Operations Research, 40, S76, 10.1287/opre.40.1.S76 · doi:10.1287/opre.40.1.s76
  21. Erlebach, 2001, Simple algorithms for a weighted interval selection problem, Lecture Notes in Computer Science, 1969, 228, 10.1007/3-540-40996-3_20 · doi:10.1007/3-540-40996-3_20
  22. Erlebach, 2003, Interval selection: Applications, algorithms, and lower bounds, Journal of Algorithms, 46, 27, 10.1016/S0196-6774(02)00291-2 · doi:10.1016/s0196-6774(02)00291-2
  23. Faigle, 1999, A greedy on-line algorithm for the k-track assignment problem, Journal of Algorithms, 31, 196, 10.1006/jagm.1998.1001 · doi:10.1006/jagm.1998.1001
  24. Faigle, 1995, Note on scheduling intervals on-line, Discrete Applied Mathematics, 58, 13, 10.1016/0166-218X(95)00112-5 · doi:10.1016/0166-218x(95)00112-5
  25. Faneyte, 2002, A branch-and-price algorithm for a hierarchical crew scheduling problem, Naval Research Logistics, 49, 743, 10.1002/nav.10044 · doi:10.1002/nav.10044
  26. Frank, 1980, On chain and antichain families of a partially ordered set, Journal of Combinatorial Theory Series B, 29, 176, 10.1016/0095-8956(80)90079-9 · doi:10.1016/0095-8956(80)90079-9
  27. Fujisawa, 1997, Exploiting sparsity in primal-dual interior-point methods for semidefinite programming, Mathematical Programming, 79, 235, 10.1007/BF02614319 · doi:10.1007/bf02614319
  28. Gabrel, 1995, Scheduling jobs within time windows on identical parallel machines: New model and algorithms, European Journal of Operational Research, 83, 320, 10.1016/0377-2217(95)00010-N · doi:10.1016/0377-2217(95)00010-n
  29. Garey, 1980, Papadimitriou, The complexity of coloring circular arcs and hords, SIAM Journal on Algebraic Discrete Methods, 1, 216, 10.1137/0601025 · doi:10.1137/0601025
  30. Gavril, 2000, Maximum weight independent sets and cliques in intersection graphs of filaments, Information Processing Letters, 73, 181, 10.1016/S0020-0190(00)00025-9 · doi:10.1016/s0020-0190(00)00025-9
  31. Gertsbakh, 1978, Minimal resources for fixed and variable job schedules, Operations Research, 18, 68, 10.1287/opre.26.1.68 · doi:10.1287/opre.26.1.68
  32. Grötschel, 1984, Corrigendum to our paper, The ellipsoid method and its consequences in combinatorial optimization, Combinatorica, 4, 291, 10.1007/BF02579139 · doi:10.1007/bf02579139
  33. Gupta, 1979, An optimal solution for the channel-assignment problem, IEEE Transactions on Computers, 28, 807, 10.1109/TC.1979.1675260 · doi:10.1109/tc.1979.1675260
  34. Harms, 1998, A simple optimal algorithm for scheduling variable-sized requests, Information Processing Letters, 68, 291, 10.1016/S0020-0190(98)00177-X · doi:10.1016/s0020-0190(98)00177-x
  35. A. Hashimoto, J. Stevens, Wire routing by optimizing channel assignment with large apertures, in: Proceedings of the 8th Design Automation Conference, 1971, pp. 155–169. · doi:10.1145/800158.805069
  36. Heady, 1998, Minimizing the sum of job earliness and tardiness in a multi-machine system, International Journal of Production Research, 36, 1619, 10.1080/002075498193192 · doi:10.1080/002075498193192
  37. Hiraishi, 2002, Scheduling of parallel identical machines to maximize the weighted number of just-in-time jobs, Computers and Operations Research, 29, 841, 10.1016/S0305-0548(00)00086-1 · doi:10.1016/s0305-0548(00)00086-1
  38. Hsiao, 1992, An efficient algorithm for finding a maximum weight 2-independent set on interval graphs, Information Processing Letters, 43, 229, 10.1016/0020-0190(92)90216-I · doi:10.1016/0020-0190(92)90216-i
  39. W.L. Hsu, K.H. Tsai, A linear time algorithm for the two-track assignment problem, in: Proceedings of 27th Allerton Conference on Communication, Control and Computing, 1989, pp. 291–300.
  40. 1996, vol. 26
  41. Keil, 1992, On the complexity of scheduling tasks with discrete starting times, Operations Research Letters, 12, 293, 10.1016/0167-6377(92)90087-J · doi:10.1016/0167-6377(92)90087-j
  42. Kolen, 1991, On the computational complexity of (maximum) class scheduling, European Journal of Operational Research, 54, 23, 10.1016/0377-2217(91)90320-U · doi:10.1016/0377-2217(91)90320-u
  43. A.J.W. Kolen, J.K. Lenstra, Combinatorics in operations research, in: R. Graham et al. (Eds.), Handbooks of Combinatorics, vol. II. 1995, pp. 1901–1904.
  44. Kroon, 1997, Exact and approximation algorithms for the tactical fixed interval scheduling problem, Operations Research, 45, 624, 10.1287/opre.45.4.624 · doi:10.1287/opre.45.4.624
  45. Lann, 2003, A note on the maximum number of on-time jobs on parallel identical machines, Computers and Operations Research, 30, 1745, 10.1016/S0305-0548(02)00084-9 · doi:10.1016/s0305-0548(02)00084-9
  46. Lee, 1991, Maximum independent set of a permutation graph in K-tracks, Lecture Notes in Computer Science, 557, 2, 10.1007/3-540-54945-5_43 · doi:10.1007/3-540-54945-5_43
  47. Locatelli, 2004, The combinatorics of pivoting for the maximum weight clique, Operations Research Letters, 32, 523, 10.1016/j.orl.2004.02.005 · doi:10.1016/j.orl.2004.02.005
  48. Marchiori, 2002, Genetic, iterated and multistart local search for the maximum clique problem, Lecture Notes in Computer Science, 2279, 112, 10.1007/3-540-46004-7_12 · doi:10.1007/3-540-46004-7_12
  49. Martello, 1986, A heuristic approach to the bus driver scheduling problem, European Journal of Operational Research, 24, 106, 10.1016/0377-2217(86)90016-0 · doi:10.1016/0377-2217(86)90016-0
  50. Miyazawa, 2004, An improved randomized on-line algorithm for a weighted interval selection problem, Journal of Scheduling, 7, 293, 10.1023/B:JOSH.0000031423.39762.d3 · doi:10.1023/b:josh.0000031423.39762.d3
  51. Naor, 2003, Real-time scheduling with a budget, Lecture Notes in Computer Science, 2719, 1123, 10.1007/3-540-45061-0_86 · doi:10.1007/3-540-45061-0_86
  52. Nemhauser, 1974, Properties of vertex packings and independence system polyhedra, Mathematical Programming, 6, 48, 10.1007/BF01580222 · doi:10.1007/bf01580222
  53. Pal, 1996, A sequential algorithm for finding a maximum weight K-independent set on interval graphs, International Journal of Computer Mathematics, 60, 205, 10.1080/00207169608804486 · doi:10.1080/00207169608804486
  54. Pardalos, 1992, A branch and bound algorithm for the maximum clique problem, Computers and Operations Research, 19, 363, 10.1016/0305-0548(92)90067-F · doi:10.1016/0305-0548(92)90067-f
  55. Saha, 2003, Maximum weight k-independent set problem on permutation graphs, International Journal of Computer Mathematics, 80, 1477, 10.1080/00207160310001614972 · doi:10.1080/00207160310001614972
  56. Sarrafzadeh, 1993, Maximum k-covering of weighted transitive graphs with applications, Algorithmica, 9, 84, 10.1007/BF01185340 · doi:10.1007/bf01185340
  57. Shor, 1970, Convergence rate of the gradient descent method with dilatation of the space, Kibernetika, 2, 80
  58. N.Z. Shor, Dual quadratic estimates in polynomial and Boolean programming, in: P.M. Pardalos, J.B. Rosen (Eds.), Computational Methods of Global Optimization, Annals of Operations Research, vol. 25, 1990, pp. 163–168. · doi:10.1007/bf02283692
  59. Sivrikaya-Serifoglu, 1999, Parallel machine scheduling with earliness and tardiness penalties, Computers and Operations Research, 26, 773, 10.1016/S0305-0548(98)00090-2 · doi:10.1016/s0305-0548(98)00090-2
  60. Waterer, 2002, The relation of time indexed formulations of single machine scheduling problems to the node packing problem, Mathematical Programming Series A, 93, 477, 10.1007/s10107-002-0335-9 · doi:10.1007/s10107-002-0335-9
  61. Woeginger, 1994, On-line scheduling of jobs with fixed start and end times, Theoretical Computer Science, 130, 5, 10.1016/0304-3975(94)90150-3 · doi:10.1016/0304-3975(94)90150-3

Cited by

Metadata

Authors
Kovalyov, M. Y., Ng, C. T., & Cheng, T. C. E.
Venue
European Journal of Operational Research
Publisher
Elsevier BV
Published
2007-04
Volume
178
Issue
2
Pages
331-342
ISSN
0377-2217 (ISSN-L)
OpenAlex
W2051158805
Cited by
159
References
37
FWCI
18.17
Type
journal article
Language
en
Open access
closed
Licence
www.elsevier.com/tdm/userlicense/1.0/ (tdm)

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.