A novel multi criteria decision making model for optimizing time–cost–quality trade-off problems in construction projects

Open access
Monghasemi, Shahryar, Nikoo, Mohammad Reza, Khaksar Fasaee, Mohammad Ali, Adamowski, Jan · 2015 · Expert Systems with Applications

Abstract

Using evidential reasoning as the multi-criterion decision making (MCDM) approach.A comprehensive framework to integrate MCDM methods with optimization techniques.Using MOGA with NSGA-II to solve discrete time-cost-quality trade-off problem.Determining the weights of the objectives with Shannon's Entropy technique.Obtaining all the Pareto solutions for the 18-activity network benchmark example. The planning phase of every construction project is entangled with multiple and occasionally conflicting criteria which need to be optimized simultaneously. Multi-criterion decision-making (MCDM) approaches can aid decision-makers in selecting the most appropriate solution among numerous potential Pareto optimal solutions. An evidential reasoning (ER) approach was applied for the first time in the context of project scheduling to identify the best Pareto solution for discrete time-cost-quality trade-off problems (DTCQTPs). An exhaustive framework to synthesize the MCDM approaches with multi-objective optimization techniques was also proposed. To identify all global Pareto optimal solutions, a multi-objective genetic algorithm (MOGA) incorporating the NSGA-II procedure was developed and tested in a highway construction project case study. The Shannon's entropy technique served to determine the relative weights of the objectives according to their contributions to the uncertainty of the results obtained. A benchmark case study of DTCQTP was solved using the proposed methodology, and the Pareto optimal solutions obtained were subsequently ranked using the ER approach. By investigating the performance of each scheduling alternative based on multiple criteria (e.g., time, cost, and quality), the proposed approach proved effective in raising the efficiently of construction project scheduling.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.eswa.2014.11.032

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Cited by

See all 221

Metadata

Authors
Monghasemi, S., Nikoo, M. R., Khaksar Fasaee, M. A., & Adamowski, J.
Venue
Expert Systems with Applications
Publisher
Elsevier BV
Published
2015-04
Volume
42
Issue
6
Pages
3089-3104
ISSN
0957-4174 (ISSN-L)
OpenAlex
W1975936454
Cited by
221
References
1
FWCI
15.61
Type
journal article
Language
en
Open access
green

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.