An ant algorithm for balanced job scheduling in grids
The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Ant system: optimization by a colony of cooperating agents
Dorigo, M., Maniezzo, V., & Colorni, A. (1996) · IEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics) · doi:10.1109/3477.484436 · Cited by 12,067
Ant colony system: a cooperative learning approach to the traveling salesman problem
Dorigo, M., & Gambardella, L. M. (1997) · IEEE Transactions on Evolutionary Computation · doi:10.1109/4235.585892 · Cited by 8,081 · cited 4×
“There are many different kinds of ACO algorithm, i.e., Ant Colony System (ACS) [10], Max-Min Ant System (MMAS) [16], Rank-based Ant System (RAS) [17], Fast Ant System (FANT) [18] and Elitist Ant System (EAS) [19].”
BackgroundMethodInfluential(2007) · Handbook of Approximation Algorithms and Metaheuristics · doi:10.1201/9781420010749-33 · Cited by 6,607
Ant colony optimization theory: A survey
Dorigo, M., & Blum, C. (2005) · Theoretical Computer Science · doi:10.1016/j.tcs.2005.05.020 · Cited by 2,295 · cited 1×
“Therefore, a dynamic algorithm in job scheduling such as Ant Colony Optimization (ACO) [8] [9] is appropriate for grids.”
MethodSilberschatz, A., Galvin, P., & Gagne, G. (1983) · Cited by 1,578
A new rank based version of the Ant System. A computational study.
Bullnheimer, B., Hartl, R. F., & Strauß, C. (1997) · ePubWU Institutional Repository (Wirtschaftsuniversität Wien) · doi:10.57938/2eb99227-a596-4eb4-bb7d-367b53dee89d · Cited by 1,016
Dynamic Mapping of a Class of Independent Tasks onto Heterogeneous Computing Systems
Maheswaran, M., Ali, S., Siegel, H. J., Hensgen, D., & Freund, R. F. (1999) · Journal of Parallel and Distributed Computing · doi:10.1006/jpdc.1999.1581 · Cited by 819
Silberschatz, A. (2003) · Andalas University Repository (Andalas University) · Cited by 520
Feature Article—The Ellipsoid Method: A Survey
Bland, R. G., Goldfarb, D., & Todd, M. J. (1981) · Operations Research · doi:10.1287/opre.29.6.1039 · Cited by 507
Predicting program execution times by analyzing static and dynamic program paths
Park, C. Y. (1993) · Real-Time Systems · doi:10.1007/bf01088696 · Cited by 250
Paranhos, D., Cirne, W., & Brasileiro, F. (2003) · Lecture notes in computer science · doi:10.1007/978-3-540-45209-6_26 · Cited by 239
Determining average program execution times and their variance
Sarkar, V. (1989) · ACM SIGPLAN Conference on Programming Language Design and Implementation (PLDI) · doi:10.1145/73141.74845 · Cited by 161 · cited 1×
“Depending on the type of programs, many methods [30] [31] [32] [33] [34] can be used to estimate the program execution time.”
MethodChaubal, S. (2006) · Cited by 148
Static and Dynamic Processor Scheduling Disciplines in Heterogeneous Parallel Architectures
Menascé, D. A., Saha, D., PORTO, S. C. D. S., Almeida, V. A. F., & Tripathi, S. K. (1995) · Journal of Parallel and Distributed Computing · doi:10.1006/jpdc.1995.1085 · Cited by 133
Job scheduling and data replication on data grids
Chang, R.-S., Chang, J., & Lin, S.-Y. (2007) · Future Generation Computer Systems · doi:10.1016/j.future.2007.02.008 · Cited by 124
Self-citationHybrid ant colony optimization and visibility studies applied to a job-shop scheduling problem
Heinonen, J., & Pettersson, F. (2006) · Applied Mathematics and Computation · doi:10.1016/j.amc.2006.09.023 · Cited by 121 · cited 1×
“In [21], J. Heinonen et al. apply the hybrid ACO algorithm with different visibility to job-shop scheduling problem.”
BackgroundComplete worst-case execution time analysis of straight-line hard real-time programs
Stappert, F., & Altenbernd, P. (2000) · Journal of Systems Architecture · doi:10.1016/s1383-7621(99)00010-7 · Cited by 121 · cited 1×
“Depending on the type of programs, many methods [30] [31] [32] [33] [34] can be used to estimate the program execution time.”
MethodMultiple ant-colony optimization for network routing
Sim, K. M., & Sun, W. H. (2003) · International Conference on Cyberworlds (CW) · doi:10.1109/cw.2002.1180890 · Cited by 101
Adaptive memories for the Quadratic Assignment Problems
Taillard, É. D., & Gambardella, L. M. (1997) · SUPSI ARIS · doi:10.71910/supsi.7451 · Cited by 85
An Ant Algorithm Hyperheuristic for the Project Presentation Scheduling Problem
Burke, E., Kendall, G., Landa-Silva, D., O'Brien, R. F. J., & Soubeiga, E. (2005) · IEEE Congress on Evolutionary Computation (CEC) · doi:10.1109/cec.2005.1554976 · Cited by 66
An ACO Algorithm for Graph Coloring Problem
Salari, E., & Eshghi, K. (2006) · ICSC Congress on Computational Intelligence Methods and Applications (CIMA) · doi:10.1109/cima.2005.1662331 · Cited by 53 · cited 2×
“Many researches use ACO to solve NP-hard problems such as traveling salesman problem [10], graph coloring problem [11], vehicle routing problem [12], and so on.”
BackgroundMethodPerformance Evaluation of Scheduling Policies for Volunteer Computing
Kondo, D., Anderson, D. P., & Vii, J. M. (2007) · International Conference on e-Science · doi:10.1109/e-science.2007.57 · Cited by 50 · cited 1×
“For example, in BOINC [2], an open-source software for volunteer computing and grid computing, job scheduling is one of the most important key factors for achieving Teraflops performance [3].”
MethodMJSA: Markov job scheduler based on availability in desktop grid computing environment
Byun, E., Choi, S., Baik, M., Gil, J., Park, C.-Y., & Hwang, C. (2006) · Future Generation Computer Systems · doi:10.1016/j.future.2006.09.004 · Cited by 34
Determining average program execution times and their variance
Sarkar, V. (1989) · ACM SIGPLAN Notices · doi:10.1145/74818.74845 · Cited by 34
Zhang, X., & Tang, L. (2005) · ICSC Congress on Computational Intelligence Methods and Applications (CIMA) · doi:10.1109/cima.2005.1662313 · Cited by 15
Cited by
Computational models and heuristic methods for Grid scheduling problems
Xhafa, F., & Abraham, A. (2010) · Future Generation Computer Systems · doi:10.1016/j.future.2009.11.005 · Cited by 351
Software Architecture Optimization Methods: A Systematic Literature Review
Aleti, A., Buhnova, B., Grunske, L., Koziolek, A., & Meedeniya, I. (2013) · IEEE Transactions on Software Engineering · doi:10.1109/tse.2012.64 · Cited by 293
“[46], [73], [83], [87], [88], [93], [122], [175], [189], [220], [239], NOT PRESENTED(1) [141], SAF(44)”
InfluentialA market-oriented hierarchical scheduling strategy in cloud workflow systems
Wu, Z., Liu, X., Ni, Z., Yuan, D., & Yang, Y. (2013) · The Journal of Supercomputing · doi:10.1007/s11227-011-0578-4 · Cited by 259
Metadata
- Authors
- Chang, R.-S., Chang, J.-S., & Lin, P.-S.
- Venue
- Future Generation Computer Systems
- Publisher
- Elsevier BV
- Published
- 2009-01
- Volume
- 25
- Issue
- 1
- Pages
- 20-27
- ISSN
- 0167-739X (ISSN-L)
- OpenAlex
- W2054498531
- Cited by
- 195
- References
- 25
- FWCI
- 25.79
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.