Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 200

The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.

Artificial intelligence and machine learning applications in the project lifecycle of the construction industry: A comprehensive review

Open access
Datta, Shuvo Dip, Islam, Mobasshira, Rahman Sobuz, Md. Habibur, Ahmed, Shakil, Kar, Moumita · 2024 · Heliyon

Abstract

The construction industry faces many challenges, including schedule and cost overruns, productivity constraints, and workforce shortages. Compared to other sectors, it lags in digitalization in every project phase. Artificial Intelligence (AI) and Machine Learning (ML) have emerged as transformative technologies revolutionizing the construction sector. However, a discernible gap persists in systematically categorizing the applications of these technologies throughout the various phases of the construction project life cycle. In response to this gap, this research aims to present a thorough assessment of the deployment of AI and ML across diverse phases in construction projects, with the ultimate goal of furnishing valuable insights for the effective integration of these intelligent systems within the construction sector. A thorough literature review was performed to identify AI and ML applications in the building sector. After scrutinizing the literature, the applications of AI and ML were presented based on a construction project life cycle. A critical review of existing literature on AI and ML applications in the building industry showed that AI and ML applications are more frequent in the planning and construction stages. Moreover, the opportunities for AI and ML applications in other stages were discussed based on the life cycle categorization and presented in this study. The practical contribution of the study lies in providing valuable insights for the effective integration of intelligent systems within the construction sector. Academically, the research contributes by conducting a thorough literature review, categorizing AI and ML applications based on the construction project life cycle, and identifying opportunities for their deployment in different stages.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.heliyon.2024.e26888

Cites

13 of 13 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 13 references

Metadata

Authors
Datta, S. D., Islam, M., Rahman Sobuz, M. H., Ahmed, S., & Kar, M.
Venue
Heliyon
Publisher
Elsevier BV
Published
2024-03
Volume
10
Issue
5
Pages
e26888
ISSN
2405-8440 (ISSN-L)
OpenAlex
W4392130427
Cited by
200
References
13
FWCI
37.24
Type
journal article
Language
en
Open access
gold

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Artificial intelligence and machine learning applications in the project lifecycle of the construction industry: A comprehensive review. https://app.cochat.ai/papers/10.1016/j.heliyon.2024.e26888
The paper
Datta, S. D., Islam, M., Rahman Sobuz, M. H., Ahmed, S., & Kar, M. (2024). Artificial intelligence and machine learning applications in the project lifecycle of the construction industry: A comprehensive review. Heliyon. https://doi.org/10.1016/j.heliyon.2024.e26888

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.