Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system with deteriorating items
The DOI matches its Crossref record; 28 of the 28 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
EOQ models for perishable items under stock dependent selling rate
Padmanabhan, G., & Vrat, P. (1995) · European Journal of Operational Research · doi:10.1016/0377-2217(94)00103-j · Cited by 287
Maihami, R., & Nakhai Kamalabadi, I. (2012) · International Journal of Production Economics · doi:10.1016/j.ijpe.2011.09.020 · Cited by 250
Joint pricing and ordering policy for a deteriorating inventory with partial backlogging
Dye, C.-Y. (2007) · Omega · doi:10.1016/j.omega.2005.05.002 · Cited by 205 · cited 1×
“Taleizadeh and Noori-Daryan (in press) studied pricing, manufacturing and inventory policies for raw material in a threelevel supply chain.”
BackgroundAbad, P. L. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00159-5 · Cited by 183 · cited 8×
“In the same year, Abad (2003) derived the optimal pricing and lot-sizing strategies for a perishable product.”
BackgroundInfluentialAn EOQ model with partial backordering and advance payments for an evaporating item
Taleizadeh, A. A. (2014) · International Journal of Production Economics · doi:10.1016/j.ijpe.2014.01.023 · Cited by 179 · cited 1×
“Also Taleizadeh (2014) extended EOQ model with partial backordering and advance payments for an evaporating item.”
BackgroundSelf-citationPapachristos, S., & Skouri, K. (2003) · International Journal of Production Economics · doi:10.1016/s0925-5273(02)00332-8 · Cited by 168 · cited 1×
“Then Papachristos and Skouri (2003) revisit and extend the Wee's (1999) research.”
BackgroundGoyal, S. K., & Giri, B. C. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00296-5 · Cited by 163 · cited 1×
“Simultaneously, Goyal and Giri (2003) have proposed a single-product production-inventory model in which demand, production and deteriorating rates vary with time and partial backordering.”
BackgroundJoint pricing and ordering policy for a deteriorating inventory
Mukhopadhyay, S., Mukherjee, R. N., & Chaudhuri, K. (2004) · Computers & Industrial Engineering · doi:10.1016/j.cie.2004.06.007 · Cited by 149 · cited 2×
“They have shown that the freshness clause has a significant impact on the decisions of both vendor and retailer.”
BackgroundAn inventory control problem for deteriorating items with back-ordering and financial considerations
Taleizadeh, A. A., & Nematollahi, M. (2013) · Applied Mathematical Modelling · doi:10.1016/j.apm.2013.05.065 · Cited by 136
Self-citationAn EOQ model for perishable product with special sale and shortage
Taleizadeh, A. A., Mohammadi, B., Barron, L. E. C., & Samimi, H. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.05.001 · Cited by 133 · cited 2×
“Taleizadeh et al. (2013) have addressed an inventory problem with shortage and special sale.”
BackgroundSelf-citationA production–inventory model for a deteriorating item with trended demand and shortages
Sana, S. S., Goyal, S. K., & Chaudhuri, K. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(03)00222-4 · Cited by 123 · cited 2×
“In the development of the inventory model the Stackelberg approach is considered between the chain partners where the vendor is leader and the retailers are the followers.”
BackgroundMethodTaleizadeh, A. A. (2014) · Applied Mathematical Modelling · doi:10.1016/j.apm.2014.02.014 · Cited by 122 · cited 1×
“Also Taleizadeh (2014) extended EOQ model with partial backordering and advance payments for an evaporating item.”
BackgroundSelf-citationMaihami, R., & Abadi, I. N. K. (2011) · Mathematical and Computer Modelling · doi:10.1016/j.mcm.2011.11.017 · Cited by 115 · cited 5×
“For instance, Padmanabhan and Vrat (1995) have proposed with three economic order quantity (EOQ) models with stock dependent selling rate where the selling rate is a function of inventory level, and the deterioration rate is deterministic and known. On the other hand, Chang and Dye (2000) have modeled an inventory con…”
BackgroundInfluentialA vendor managed inventory supply chain with deteriorating raw materials and products
Yu, Y., Wang, Z., & Liang, L. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2011.11.029 · Cited by 113 · cited 2×
“On the other hand, Chang and Dye (2000) have modeled an inventory control problem with a temporary sale price and they have derived the optimal total cost of saving for the deteriorating products during the special replenishment period.”
BackgroundXiao, T., & Xu, T. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.06.004 · Cited by 112 · cited 1×
“In the same direction, Xiao and Xu (2013) have presented a Stackelberg game model for a two levels supply chain including a supplier and a retailer.”
BackgroundOptimal replenishment policy for a deteriorating green product: Life cycle costing analysis
Wee, H., Lee, M., Yu, J. C. P., & Wang, C. E. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2011.05.001 · Cited by 112 · cited 2×
“Then, Wee et al. (2011) have developed a VMI strategy for green electronic products.”
BackgroundMethodProduction planning for a deteriorating item with stochastic demand and consumer choice
Lodree, E. J., & Uzochukwu, B. M. (2008) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.09.010 · Cited by 88
Dye, C.-Y., Ouyang, L., & Hsieh, T.-P. (2007) · Computers & Industrial Engineering · doi:10.1016/j.cie.2006.10.009 · Cited by 78 · cited 8×
“Recently, Wu and Sarker (2013) have revisited and extended the research work of Lin and Lin (2007). They have used an integrated inventory strategy in a two-stage supply chain comprised of one producer and multiple buyers in which the production and replenishment cycles are equal and deteriorating of items are occurri…”
BackgroundMethodInfluentialLee, S.-H., & Kim, D. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.09.011 · Cited by 72 · cited 1×
“In a very recent paper, Lee and Kim (2014) have derived the optimal policy considering both deteriorating and defective items in an integrated production–distribution model for a single-vendor single-buyer supply chain.”
BackgroundTeng, J., Ouyang, L., & Chen, L. (2006) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.03.003 · Cited by 70 · cited 2×
“Next, Teng et al. (2007) extend the work of Abad (2003) considering backlogging and lost good will costs.”
BackgroundDye, C.-Y. (2012) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2012.03.002 · Cited by 70
A cooperative inventory policy with deteriorating items for a two-echelon model
Lin, C., & Lin, Y. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.01.012 · Cited by 62
An optimal replenishment model for inventory items with normally distributed deterioration
Chen, J.-M., & Lin, C.-S. (2002) · Production Planning & Control · doi:10.1080/09537280210144446 · Cited by 51
Optimal control of a production inventory system with deteriorating items
Tadj, L., Bounkhel, M., & Benhadid, Y. (2006) · International Journal of Systems Science · doi:10.1080/00207720601014123 · Cited by 39 · cited 2×
“Thereafter, Tadj et al. (2006) have examined the problem of controlling the production rate of deteriorating items for a production–inventory system.”
BackgroundMethodYu, J. C. P., Lin, Y.-S., & Wang, K. (2012) · International Journal of Systems Science · doi:10.1080/00207721.2012.659701 · Cited by 33 · cited 1×
“Yu et al. (2013) have studied the inventory management approach for a supply chain with the deteriorating items and profit sharing where the deterioration rate follows a Weibull distribution.”
BackgroundSoni, H. N., & Joshi, M. (2013) · Computers & Industrial Engineering · doi:10.1016/j.cie.2013.09.008 · Cited by 31 · cited 1×
“Later, Soni and Joshi (2013) have further extended the economic order quantity inventory model in a fuzzy sense considering a trade credit strategy.”
BackgroundOn conflict and cooperation in a two-echelon inventory model for deteriorating items
Lin, Y., Lin, C., & Lin, B. (2010) · Computers & Industrial Engineering · doi:10.1016/j.cie.2010.07.024 · Cited by 29 · cited 2×
“So, the partners of the chains attempt to manage effectively and efficiently the deteriorating of raw materials and finished products inventories such that the items are keeping fresher till these are placed on final customer's hands.”
BackgroundOptimal manufacturing and delivery schedules in a supply chain system of deteriorating items
Wu, B., & Sarker, B. R. (2012) · International Journal of Production Research · doi:10.1080/00207543.2012.674650 · Cited by 23 · cited 1×
“Recently, Wu and Sarker (2013) have revisited and extended the research work of Lin and Lin (2007).”
Background
Cited by
Impact of business analytics and enterprise systems on managerial accounting
Appelbaum, D., Kogan, A., Vasarhelyi, M., & Yan, Z. (2017) · International Journal of Accounting Information Systems · doi:10.1016/j.accinf.2017.03.003 · Cited by 554
Literature review of deteriorating inventory models by key topics from 2012 to 2015
Janssen, L., Claus, T., & Sauer, J. (2016) · International Journal of Production Economics · doi:10.1016/j.ijpe.2016.08.019 · Cited by 299
Zhang, J., Liu, G., Zhang, Q., & Bai, Z. (2015) · Omega · doi:10.1016/j.omega.2015.03.004 · Cited by 193
Metadata
- Authors
- Taleizadeh, A. A., Noori-daryan, M., & Cárdenas-Barrón, L. E.
- Venue
- International Journal of Production Economics
- Publisher
- Elsevier BV
- Published
- 2015-01
- Volume
- 159
- Pages
- 285-295
- ISSN
- 0925-5273 (ISSN-L)
- OpenAlex
- W1986205290
- Cited by
- 169
- References
- 28
- FWCI
- 51.29
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.