Key project management practices affecting Singaporean firms’ project performance in China
The DOI matches its Crossref record; 29 of the 29 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society. Series A (General) · doi:10.2307/2344428 · Cited by 35,697
Qu, X. (2007) · Technometrics · doi:10.1198/tech.2007.s455 · Cited by 14,705
Multivariate Data Analysis, 6th ed
Tatham, R. L., Anderson, R. E., Babin, B. J., Black, W. C., & Hair, J. F. (2006) · Cited by 9,807
An Introduction to Statistical Methods and Data Analysis
(1994) · Technometrics · doi:10.1080/00401706.1994.10485832 · Cited by 5,346
A guide to the project management body of knowledge (PMBOK guide)
Pmbok (2004) · Cited by 4,316
An Introduction to Statistical Methods and Data Analysis
Prybutok, V. R. (1989) · Technometrics · doi:10.1080/00401706.1989.10488572 · Cited by 1,499
Validation in Information Systems Research: A State-of-the-Art Assessment1
Boudreau, M.-C., Gefen, D., & Straub, D. W. (2001) · MIS Quarterly · doi:10.2307/3250956 · Cited by 959
Factors Affecting the Success of a Construction Project
Chan, A. P. C., Scott, D. R., & Chan, A. P. L. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2004)130:1(153 · Cited by 821 · cited 1×
“The many factors that contribute to project success may be grouped into five main categories: PM actions, projectrelated factors, project procedures, human-related factors and external environment [ 6 ].”
BackgroundFraming of project critical success factors by a systems model
Fortune, J., & White, D. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.07.004 · Cited by 616
Risk management for overseas construction projects
Zhi, H. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00015-i · Cited by 407 · cited 2×
“Other risks associated with international construction include: host government-related risks, shortage of financial resources, and inflation, currency and interest rate fluctuations [ 1 ,5].”
Background
Cited by
Olawale, Y. A., & Sun, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003674519 · Cited by 478
“Ling et al (2009) in the study of key project management practices affecting project performance found that the most significant practices that are significantly correlated with project performance relate to scope management and recommended that emphasis must be given to scope management in order…”
BackgroundDo project managers practice what they preach, and does it matter to project success?
Papke-Shields, K. E., Beise, C., & Quan, J. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.11.002 · Cited by 393
Investment evaluation within project management: an information systemsperspective
Irani, Z. (2010) · Journal of the Operational Research Society · doi:10.1057/jors.2010.10 · Cited by 72
“See, Zimmerer and Yasin (1998). • Ensure that the project plan is detailed and robust, and where needed, regularly updated.”
Background
Metadata
- Authors
- Ling, F. Y. Y., Low, S. P., Wang, S. Q., & Lim, H. H.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2009-01
- Volume
- 27
- Issue
- 1
- Pages
- 59-71
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2077800555
- Cited by
- 224
- References
- 29
- FWCI
- 6.68
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Key project management practices affecting Singaporean firms’ project performance in China. https://app.cochat.ai/papers/10.1016/j.ijproman.2007.10.004
- The paper
- Ling, F. Y. Y., Low, S. P., Wang, S. Q., & Lim, H. H. (2009). Key project management practices affecting Singaporean firms’ project performance in China. International Journal of Project Management. https://doi.org/10.1016/j.ijproman.2007.10.004
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.