The DOI matches its Crossref record; 27 of the 27 references it cites were found in a registry or an index.
Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A fast and elitist multiobjective genetic algorithm: NSGA-II
Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. (2002) · IEEE Transactions on Evolutionary Computation · doi:10.1109/4235.996017 · Cited by 50,053
Multiobjective evolutionary algorithms: a comparative case study and the strength Pareto approach
Zitzler, E., & Thiele, L. (1999) · IEEE Transactions on Evolutionary Computation · doi:10.1109/4235.797969 · Cited by 8,798
Multiobjective Optimization Problems With Complicated Pareto Sets, MOEA/D and NSGA-II
Li, H., & Zhang, Q. (2009) · IEEE Transactions on Evolutionary Computation · doi:10.1109/tevc.2008.925798 · Cited by 2,543
The Traveling Salesman Problem
(2019) · Fundamentals of Supply Chain Theory · doi:10.1002/9781119584445.ch10 · Cited by 1,614
A survey of scheduling problems with setup times or costs
Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.06.060 · Cited by 1,357
Backtracking Search Optimization Algorithm for numerical optimization problems
Civicioglu, P. (2013) · Applied Mathematics and Computation · doi:10.1016/j.amc.2013.02.017 · Cited by 1,018
Operational methods for minimization of energy consumption of manufacturing equipment
Mouzon, G., Yildirim, M. B., & Twomey, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701450013 · Cited by 597
A new approach to scheduling in manufacturing for power consumption and carbon footprint reduction
Fang, K., Uhan, N., Zhao, F., & Sutherland, J. W. (2011) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2011.08.004 · Cited by 552
Optimizing the production scheduling of a single machine to minimize total energy consumption costs
Shrouf, F., Ordieres-Meré, J. B., Sánchez, Á. G., & Ortega-Mier, M. (2013) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2013.12.024 · Cited by 479
Energy-efficient scheduling in manufacturing companies: A review and research framework
Gahm, C., Denz, F., Dirr, M., & Tuma, A. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.07.017 · Cited by 474
Metadata
- Authors
- Lu, C., Gao, L., Li, X., Pan, Q., & Wang, Q.
- Venue
- Journal of Cleaner Production
- Publisher
- Elsevier BV
- Published
- 2017-02
- Volume
- 144
- Pages
- 228-238
- ISSN
- 0959-6526 (ISSN-L)
- OpenAlex
- W2568704089
- Cited by
- 292
- References
- 27
- FWCI
- 39.89
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm. https://app.cochat.ai/papers/10.1016/j.jclepro.2017.01.011
- The paper
- Lu, C., Gao, L., Li, X., Pan, Q., & Wang, Q. (2017). Energy-efficient permutation flow shop scheduling problem using a hybrid multi-objective backtracking search algorithm. Journal of Cleaner Production. https://doi.org/10.1016/j.jclepro.2017.01.011
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.