Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia
Open accessThe DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
Slow economic growth, high competition, and construction industry restructuring have put a strong pressure on construction companies to continually improve their productivity and performance. Many studies on performance measurement have been carried out at the project level. However, recently, the demand for performance evaluation and management at the company level has increased. This paper aims to identify a set of KPIs that can be implemented by construction executives in measuring the performance at the company level in Saudi Arabia. List of 47 potential performance indicators have been identified through the literature review. A survey questionnaire was conducted on a randomly selected sample of large construction firms in Saudi Arabia. The statistical analysis of the collected responses was provided in 10 significant KPIs. Findings indicate that the traditional financial measures can no more be the sole determinant of firm success. Other performance indicators such as external customer satisfaction, safety, business efficiency, and effectiveness of planning are increasingly becoming important. The results of the study is a set of KPIs that are useful as a first step in developing a national benchmarking system for enhancing the performance of construction firms in the Kingdom of Saudi Arabia.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Performance measurement system design: A literature review and research agenda
Neely, A., Gregory, M., & Platts, K. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510083622 · Cited by 3,259 · cited 1×
“Additional general perspectives have been identi-fied, such as competition (Neely et al., 1995) and employee (Neely et al., 2000), as well as application-specific perspectives, such as project and supplier for construction (Kagioglou et al., 2001; Wang et al., 2010).”
Cited by
Impact of integration management on construction project management performance
Demirkesen, S., & Ozorhon, B. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.09.008 · Cited by 259
Metadata
- Authors
- Ali, H. A. E. M., Al-Sulaihi, I. A., & Al-Gahtani, K. S.
- Venue
- Journal of King Saud University - Engineering Sciences
- Published
- 2013-07
- Volume
- 25
- Issue
- 2
- Pages
- 125-134
- ISSN
- 1018-3639 (ISSN-L)
- OpenAlex
- W2062240986
- Cited by
- 164
- References
- 1
- FWCI
- 2.79
- Type
- journal article
- Language
- en
- Open access
- hybrid
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia. https://app.cochat.ai/papers/10.1016/j.jksues.2012.03.002
- The paper
- Ali, H. A. E. M., Al-Sulaihi, I. A., & Al-Gahtani, K. S. (2013). Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia. Journal of King Saud University - Engineering Sciences. https://doi.org/10.1016/j.jksues.2012.03.002
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.