The DOI matches its Crossref record; 74 of the 74 references it cites were found in a registry or an index.
Simulation for manufacturing system design and operation: Literature review and analysis
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Simulation Modeling and Analysis.
Schervish, M. J., Law, A. M., & Kelton, W. D. (1983) · Journal of the American Statistical Association · doi:10.2307/2288169 · Cited by 8,697
Simulation modeling and analysis
(1999) · Journal of Manufacturing Systems · doi:10.1016/s0278-6125(99)90119-x · Cited by 3,833
Discrete-Event System Simulation
Morgan, C. B. (1984) · Technometrics · doi:10.1080/00401706.1984.10487955 · Cited by 3,593
Kelton, D. W., Sadowski, R. P., & Sadowski, D. A. (1998) · Cited by 1,542
A survey of scheduling problems with setup times or costs
Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.06.060 · Cited by 1,527
Kriging Metamodeling in Simulation: A Review
Kleijnen, J. P. C. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2007.10.013 · Cited by 1,456
Staff scheduling and rostering: A review of applications, methods and models
Ernst, A. T., Jiang, H., Krishnamoorthy, M., & Sier, D. (2004) · European Journal of Operational Research · doi:10.1016/s0377-2217(03)00095-x · Cited by 1,260
Discrete Event System Simulation
Vijayarangam, J., Kamalakannan, S., & Sebasthi Priya, R. (2024) · Intelligent Technologies for Automated Electronic Systems · doi:10.2174/9789815179514124010007 · Cited by 1,029
Proceedings of the 2004 Winter Simulation Conference
(2004) · Proceedings of the 2004 Winter Simulation Conference, 2004. · doi:10.1109/wsc.2004.1371428 · Cited by 998
The hybrid flow shop scheduling problem
Ruiz, R., & Vázquez-Rodríguez, J. A. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.09.024 · Cited by 854
Survey of research in the design and control of automated guided vehicle systems
Vis, I. F. A. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.09.020 · Cited by 757
Feature Article: Optimization for simulation: Theory vs. Practice
Fu, M. C. (2002) · INFORMS Journal on Computing · doi:10.1287/ijoc.14.3.192.113 · Cited by 742
Simulation in manufacturing and business: A review
Jahangirian, M., Eldabi, T., Naseer, A., Stergioulas, L. K., & Young, T. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.06.004 · Cited by 598
Proceedings of the 2002 Winter Simulation Conference
(2002) · Proceedings of the Winter Simulation Conference · doi:10.1109/wsc.2002.1166355 · Cited by 456
Simulation in the supply chain context: a survey
Terzi, S., & Cavalieri, S. (2004) · Computers in Industry · doi:10.1016/s0166-3615(03)00104-0 · Cited by 431
Proceedings of the Winter Simulation Conference
Rose, O., & Uhrmacher, A. M. (2012) · Winter Simulation Conference · Cited by 401
Proceedings of the 2006 Winter Simulation Conference
(2006) · Proceedings of the 2006 Winter Simulation Conference · doi:10.1109/wsc.2006.323029 · Cited by 399
Proceedings of the 2010 Winter Simulation Conference
Zee, V. D. D., Lahr, M. M. H., Luijckx, G. J., & Buskens, E. (2010) · Winter Simulation Conference · Cited by 367
Discrete Optimization via Simulation Using COMPASS
Hong, L. J., & Nelson, B. L. (2006) · Operations Research · doi:10.1287/opre.1050.0237 · Cited by 298
Simulation optimization: A comprehensive review on theory and applications
TEKIN, E., & SABUNCUOGLU, I. (2004) · IIE Transactions · doi:10.1080/07408170490500654 · Cited by 265
How to Build Valid and Credible Simulation Models
Law, A. M. (2019) · 2019 Winter Simulation Conference (WSC) · doi:10.1109/wsc40007.2019.9004789 · Cited by 254
CD++: a toolkit to develop DEVS models
Wainer, G. (2002) · Software: Practice and Experience · doi:10.1002/spe.482 · Cited by 249
Simulation metamodeling through artificial neural networks
Fonseca, D. J., Navaresse, D. O., & Moynihan, G. P. (2003) · Engineering Applications of Artificial Intelligence · doi:10.1016/s0952-1976(03)00043-5 · Cited by 167
Yang, T., & Chou, P. (2005) · Mathematics and Computers in Simulation · doi:10.1016/j.matcom.2004.09.004 · Cited by 158
Vinod, V., & Sridharan, R. (2010) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.08.017 · Cited by 157
Xu, J., Nelson, B. L., & Hong, L. J. (2010) · ACM Transactions on Modeling and Computer Simulation · doi:10.1145/1667072.1667075 · Cited by 157
Humans: the missing link in manufacturing simulation?
Baines, T. S., Mason, S. R., Siebers, P., & Ladbrook, J. (2003) · Simulation Modelling Practice and Theory · doi:10.1016/s1569-190x(03)00094-7 · Cited by 150
Application of computer simulation modeling in the health care sector: a survey
Mielczarek, B., & Uziałko, J. (2010) · SIMULATION · doi:10.1177/0037549710387802 · Cited by 149
Proceedings of the 2010 Spring Simulation Multiconference
McGraw, R. M., Florida, S. '. 2. S. S. C. 2. O., Association for Computing Machinery-Digital Library, ACM Special Interest Group on Simulation, & SIGs, A. (2010) · Cited by 143
A comparison of machine-learning algorithms for dynamic scheduling of flexible manufacturing systems
Priore, P., de la Fuente, D., Puente, J., & Fernández, J. P. (2005) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2005.09.009 · Cited by 121
System and simulation modeling using SYSML
Huang, E., Ramamurthy, R., & McGinnis, L. F. (2007) · Winter Simulation Conference · doi:10.1109/wsc.2007.4419675 · Cited by 119
Object-oriented modeling and simulation of flexible manufacturing systems: a rule-based procedure
Anglani, A., Grieco, A., Pacella, M., & Tolio, T. A. M. (2002) · Simulation Modelling Practice and Theory · doi:10.1016/s1569-190x(02)00100-4 · Cited by 112
Multi-objective flexible job shop schedule: Design and evaluation by simulation modeling
Xing, L., Chen, Y., & Yang, K. (2008) · Applied Soft Computing · doi:10.1016/j.asoc.2008.04.013 · Cited by 111
van Beers, W. C. M., & Kleijnen, J. P. C. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2007.02.035 · Cited by 110
Can, B., & Heavey, C. (2011) · Computers & Operations Research · doi:10.1016/j.cor.2011.05.004 · Cited by 109
Decision support systems for effective maintenance operations
Ni, J., & Jin, X. (2012) · CIRP Annals · doi:10.1016/j.cirp.2012.03.065 · Cited by 109
Kleijnen, J. P. C., & van Beers, W. C. M. (2004) · European Journal of Operational Research · doi:10.1016/j.ejor.2003.09.037 · Cited by 109
Agent-based simulation applications in marketing research: an integrated review
Negahban, A., & Yılmaz, L. (2013) · Journal of Simulation · doi:10.1057/jos.2013.21 · Cited by 108
Self-citationAn MILP for scheduling problems in an FMS with one vehicle
Caumond, A., Lacomme, P., Moukrim, A., & Tchernev, N. (2008) · European Journal of Operational Research · doi:10.1016/j.ejor.2008.03.051 · Cited by 108
Fuzzy multi-criteria selection of object-oriented simulation software for production system analysis
Cochran, J. K., & Chen, H.-N. (2003) · Computers & Operations Research · doi:10.1016/s0305-0548(03)00209-0 · Cited by 100
Toward Real-Time Distributed Intelligent Control: A Survey of Research Themes and Applications
Brennan, R. W. (2007) · IEEE Transactions on Systems Man and Cybernetics Part C (Applications and Reviews) · doi:10.1109/tsmcc.2007.900670 · Cited by 93
Conceptual modeling for simulation: Issues and research requirements
Robinson, S. (2007) · Newcastle University ePrints (Newcastle Univesity) · doi:10.25405/ncl.34455309 · Cited by 88
Mahdavi, I., Shirazi, B., & Solimanpur, M. (2010) · Simulation Modelling Practice and Theory · doi:10.1016/j.simpat.2010.01.015 · Cited by 86
RFID-enabled track and traceability in job-shop scheduling environment
Chongwatpol, J., & Sharda, R. (2013) · European Journal of Operational Research · doi:10.1016/j.ejor.2013.01.009 · Cited by 83
An intelligent search algorithm-based method to derive assembly line design alternatives
Michalos, G., Makris, S., & Mourtzis, D. (2011) · International Journal of Computer Integrated Manufacturing · doi:10.1080/0951192x.2011.627949 · Cited by 81
Artificial neural networks for job shop simulation
Fonseca, D. J., & Navaresse, D. O. (2002) · Advanced Engineering Informatics · doi:10.1016/s1474-0346(03)00005-3 · Cited by 78
Metan, G., Sabuncuoğlu, İ., & Pierreval, H. (2010) · International Journal of Production Research · doi:10.1080/00207540903307581 · Cited by 76
Kuo, Y., Yang, T., Peters, B. A., & Chang, I. (2007) · Simulation Modelling Practice and Theory · doi:10.1016/j.simpat.2007.05.006 · Cited by 72
Flexibility-enabled lead-time reduction in flexible systems
Wadhwa, S., Rao, K. S., & Chan, F. T. S. (2005) · International Journal of Production Research · doi:10.1080/00207540500076530 · Cited by 68
Comparison of experimental designs for simulation-based symbolic regression of manufacturing systems
Can, B., & Heavey, C. (2011) · Computers & Industrial Engineering · doi:10.1016/j.cie.2011.03.012 · Cited by 67
Optimization of preventive maintenance through a combined maintenance-production simulation model
Roux, O., Duvivier, D., Quesnel, G., & Ramat, É. (2010) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.11.004 · Cited by 61
An expert system for manufacturing systems machine selection
Chtourou, H., Masmoudi, W., & Maalej, A. Y. (2005) · Expert Systems with Applications · doi:10.1016/j.eswa.2004.12.007 · Cited by 57
Neural network prediction in a system for optimizing simulations
Laguna, M., & Martí, R. (2002) · IIE Transactions · doi:10.1080/07408170208928869 · Cited by 55
Reducing simulation models for scheduling manufacturing facilities
André Thomas, B., & Charpentier, P. (2003) · European Journal of Operational Research · doi:10.1016/j.ejor.2003.08.042 · Cited by 52
Optimization of due-date objectives in scheduling semiconductor batch manufacturing
Gupta, A. K., & Sivakumar, A. (2005) · International Journal of Machine Tools and Manufacture · doi:10.1016/j.ijmachtools.2005.08.017 · Cited by 51
Comparison of Routing Strategies for AGV Systems using Simulation
Duinkerken, M. B., Ottjes, J. A., & Lodewijks, G. (2006) · Winter Simulation Conference · doi:10.1109/wsc.2006.322922 · Cited by 50
Altuntaş, S., & Selim, H. (2011) · Expert Systems with Applications · doi:10.1016/j.eswa.2011.06.045 · Cited by 43
Neural network metamodeling for cycle time-throughput profiles in manufacturing
Yang, F. (2010) · European Journal of Operational Research · doi:10.1016/j.ejor.2009.12.026 · Cited by 38
Group shops scheduling with makespan criterion subject to random release dates and processing times
Ahmadizar, F., Ghazanfari, M., & Ghomi, S. M. T. F. (2009) · Computers & Operations Research · doi:10.1016/j.cor.2009.04.002 · Cited by 36
A cooperative dispatching approach for minimizing mean tardiness in a dynamic flowshop
El-Bouri, A. (2011) · Computers & Operations Research · doi:10.1016/j.cor.2011.07.004 · Cited by 35
Simulation framework for the verification of PLC programs in automobile industries
Koo, L.-J., Park, C. M., Lee, C. H., Park, S.-C., & Wang, G.-N. (2010) · International Journal of Production Research · doi:10.1080/00207543.2010.492404 · Cited by 33
Joseph, O. A., & Sridharan, R. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.575091 · Cited by 30
The study of real time scheduling by an intelligent multi-controller approach
Guh, R., Shiue, Y.-R., & Tseng, T.-Y. (2010) · International Journal of Production Research · doi:10.1080/00207541003794884 · Cited by 29
Influence of maintenance policies on multi-stage manufacturing systems in dynamic conditions
Renna, P. (2011) · International Journal of Production Research · doi:10.1080/00207543.2010.537703 · Cited by 28
Azadeh, A., Jeihoonian, M., Shoja, B. M., & Seyedmahmoudi, S. H. (2012) · International Journal of Production Research · doi:10.1080/00207543.2011.645511 · Cited by 26
Azzi, A., Battini, D., Faccio, M., & Persona, A. (2012) · International Journal of Production Research · doi:10.1080/00207543.2011.653590 · Cited by 25
Iassinovski, S., Artiba, A., & Fagnart, C. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.08.028 · Cited by 23
A construction algorithm for designing guide paths of automated guided vehicle systems
Lim, J. K., Lim, J. M., Yoshimoto, K., Kim, K. H., & Takahashi, T. (2002) · International Journal of Production Research · doi:10.1080/00207540210137558 · Cited by 23
Real-time rescheduling metaheuristic algorithms applied to FMS with routing flexibility
Souier, M., Sari, Z., & Hassam, A. (2012) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-012-4001-y · Cited by 22
Mahdavi, I., & Shirazi, B. (2010) · Journal of Artificial Intelligence · doi:10.3923/jai.2010.201.219 · Cited by 17
Minimising schedule cost via simulation optimisation: an application in pipe manufacturing
Dong, S., & Medeiros, D. J. (2011) · International Journal of Production Research · doi:10.1080/00207543.2010.545447 · Cited by 12
Shirazi, B., Mahdavi, I., & Solimanpur, M. (2011) · International Journal of Production Research · doi:10.1080/00207543.2011.574504 · Cited by 11
Evaluating Design Alternatives of an Extruded Food Production Line Using Simulation
Owens, S. F., & Levary, R. R. (2002) · SIMULATION · doi:10.1177/0037549702078010004 · Cited by 10
Cited by
Scanning the Industry 4.0: A Literature Review on Technologies for Manufacturing Systems
Alcácer, V., & Cruz-Machado, V. (2019) · Engineering Science and Technology, an International Journal · doi:10.1016/j.jestch.2019.01.006 · Cited by 1,063
Simulation in the design and operation of manufacturing systems: state of the art and new trends
Mourtzis, D. (2020) · International Journal of Production Research · doi:10.1080/00207543.2019.1636321 · Cited by 727
The evolution and future of manufacturing: A review
Esmaeilian, B., Behdad, S., & Wang, B. (2016) · Journal of Manufacturing Systems · doi:10.1016/j.jmsy.2016.03.001 · Cited by 686
Artificial Intelligence in Advanced Manufacturing: Current Status and Future Outlook
Arinez, J. F., Chang, Q., Gao, R. X., Xu, C., & Zhang, J. (2020) · Journal of Manufacturing Science and Engineering · doi:10.1115/1.4047855 · Cited by 584
Human–Cyber–Physical Systems (HCPSs) in the Context of New-Generation Intelligent Manufacturing
Zhou, J., Zhou, Y., Wang, B., & Zang, J. (2019) · Engineering · doi:10.1016/j.eng.2019.07.015 · Cited by 492
Metadata
- Authors
- Negahban, A., & Smith, J. S.
- Venue
- Journal of Manufacturing Systems
- Publisher
- Elsevier BV
- Published
- 2014-04
- Volume
- 33
- Issue
- 2
- Pages
- 241-261
- ISSN
- 0278-6125 (ISSN-L)
- OpenAlex
- W2076922282
- Cited by
- 562
- References
- 74
- FWCI
- 46.41
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.