Student or educator? Sign up with your school email and get 6 months of Pro free.
CoChat
Cited by 234

The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.

Application of several optimization techniques for estimating TBM advance rate in granitic rocks

Open access
Armaghani, Danial Jahed, Koopialipoor, Mohammadreza, Marto, Aminaton, Yagiz, Saffet · 2019 · Journal of Rock Mechanics and Geotechnical Engineering

Abstract

This study aims to develop several optimization techniques for predicting advance rate of tunnel boring machine (TBM) in different weathered zones of granite. For this purpose, extensive field and laboratory studies have been conducted along the 12,649 m of the Pahang – Selangor raw water transfer tunnel in Malaysia. Rock properties consisting of uniaxial compressive strength (UCS), Brazilian tensile strength (BTS), rock mass rating (RMR), rock quality designation (RQD), quartz content (q) and weathered zone as well as machine specifications including thrust force and revolution per minute (RPM) were measured to establish comprehensive datasets for optimization. Accordingly, to estimate the advance rate of TBM, two new hybrid optimization techniques, i.e. an artificial neural network (ANN) combined with both imperialist competitive algorithm (ICA) and particle swarm optimization (PSO), were developed for mechanical tunneling in granitic rocks. Further, the new hybrid optimization techniques were compared and the best one was chosen among them to be used for practice. To evaluate the accuracy of the proposed models for both testing and training datasets, various statistical indices including coefficient of determination (R2), root mean square error (RMSE) and variance account for (VAF) were utilized herein. The values of R2, RMSE, and VAF ranged in 0.939–0.961, 0.022–0.036, and 93.899–96.145, respectively, with the PSO-ANN hybrid technique demonstrating the best performance. It is concluded that both the optimization techniques, i.e. PSO-ANN and ICA-ANN, could be utilized for predicting the advance rate of TBMs; however, the PSO-ANN technique is superior.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.jrmge.2019.01.002

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 1 references

Cited by

See all 234

Metadata

Authors
Armaghani, D. J., Koopialipoor, M., Marto, A., & Yagiz, S.
Venue
Journal of Rock Mechanics and Geotechnical Engineering
Publisher
Elsevier BV
Published
2019-08
Volume
11
Issue
4
Pages
779-789
ISSN
1674-7755 (ISSN-L)
OpenAlex
W2942549247
Cited by
234
References
1
FWCI
24.11
Type
journal article
Language
en
Open access
diamond

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Application of several optimization techniques for estimating TBM advance rate in granitic rocks. https://app.cochat.ai/papers/10.1016/j.jrmge.2019.01.002
The paper
Armaghani, D. J., Koopialipoor, M., Marto, A., & Yagiz, S. (2019). Application of several optimization techniques for estimating TBM advance rate in granitic rocks. Journal of Rock Mechanics and Geotechnical Engineering. https://doi.org/10.1016/j.jrmge.2019.01.002

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.