The DOI matches its Crossref record; 32 of the 32 references it cites were found in a registry or an index.
Improving forecasting accuracy of time series data using a new ARIMA-ANN hybrid method and empirical mode decomposition
Open accessAbstract
Many applications in different domains produce large amount of time series data. Making accurate forecasting is critical for many decision makers. Various time series forecasting methods exist that use linear and nonlinear models separately or combination of both. Studies show that combining of linear and nonlinear models can be effective to improve forecasting performance. However, some assumptions that those existing methods make, might restrict their performance in certain situations. We provide a new Autoregressive Integrated Moving Average (ARIMA)-Artificial Neural Network (ANN) hybrid method that work in a more general framework. Experimental results show that strategies for decomposing the original data and for combining linear and nonlinear models throughout the hybridization process are key factors in the forecasting performance of the methods. By using these findings, the proposed hybrid method is combined with Empirical Mode Decomposition (EMD) technique which generates more predictable components. We show that our hybrid method with EMD can be an effective way to improve forecasting accuracy obtained by traditional hybrid methods and also any of the individual methods that we used separately.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Huang, N. E., Shen, Z., Long, S. R., Wu, M. C., Shih, H. H., Zheng, Q., Yen, N.-C., Tung, C. C., & Liu, H. H. (1998) · Proceedings of the Royal Society of London. Series A: Mathematical, Physical and Engineering Sciences · doi:10.1098/rspa.1998.0193 · Cited by 23,564
Multilayer feedforward networks are universal approximators
Hornik, K., Stinchcombe, M., & White, H. (1989) · Neural Networks · doi:10.1016/0893-6080(89)90020-8 · Cited by 21,728
Approximation by superpositions of a sigmoidal function
Cybenko, G. (1989) · Mathematics of Control, Signals, and Systems · doi:10.1007/bf02551274 · Cited by 13,883
Multilayer feedforward networks are universal approximators
HornikK., StinchcombeM., & WhiteH. (1989) · Neural Networks · doi:10.5555/70405.70408 · Cited by 9,081
Time series forecasting using a hybrid ARIMA and neural network model
Zhang, G. P. (2003) · Neurocomputing · doi:10.1016/s0925-2312(01)00702-0 · Cited by 4,428
Baldi, P., & Long, A. D. (2001) · Bioinformatics · doi:10.1093/bioinformatics/17.6.509 · Cited by 1,618
ARIMA Models to Predict Next-Day Electricity Prices
Contreras, J., Espinola, R., Nogales, F. J., & Conejo, A. J. (2002) · IEEE Power Engineering Review · doi:10.1109/mper.2002.4312577 · Cited by 928
A novel hybridization of artificial neural networks and ARIMA models for time series forecasting
Khashei, M., & Bijari, M. (2011) · Applied Soft Computing · doi:10.1016/j.asoc.2010.10.015 · Cited by 821
A hybrid neural network and ARIMA model for water quality time series prediction
Ömer Faruk, D. (2010) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2009.09.015 · Cited by 707
Approximation by superpositions of a sigmoidal function
Cybenko, G. (1992) · Mathematics of Control, Signals, and Systems · doi:10.1007/bf02134016 · Cited by 703
ARIMA forecasting of primary energy demand by fuel in Turkey
Ediger, V. Ş., & Akar, S. (2007) · Energy Policy · doi:10.1016/j.enpol.2006.05.009 · Cited by 622
Improving Forecasting Accuracy of Annual Runoff Time Series Using ARIMA Based on EEMD Decomposition
Wang, W.-C., Chau, K.-W., Xu, D.-M., & Chen, X.-Y. (2015) · Water Resources Management · doi:10.1007/s11269-015-0962-6 · Cited by 563
Applications of Hilbert–Huang transform to non‐stationary financial time series analysis
Huang, N. E., Wu, M. C., Qu, W., Long, S. R., & Shen, S. S. P. (2003) · Applied Stochastic Models in Business and Industry · doi:10.1002/asmb.501 · Cited by 509
A moving-average filter based hybrid ARIMA–ANN model for forecasting time series data
Babu, C. N., & Reddy, B. E. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.05.028 · Cited by 503
Nonlinear signal processing using neural networks: Prediction and system modelling
Lapedes, A. S., & Farber, R. M. (1987) · University of North Texas Digital Library (University of North Texas) · Cited by 373
To combine or not to combine: selecting among forecasts and their combinations
Hibon, M., & Evgeniou, T. (2005) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2004.05.002 · Cited by 325
Using neural networks and data mining techniques for the financial distress prediction model
Chen, W.-S., & Du, Y.-K. (2009) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.03.020 · Cited by 283
Forecasting wind speed using empirical mode decomposition and Elman neural network
Wang, J., Zhang, W., Li, Y., Wang, J., & Dang, Z. (2014) · Applied Soft Computing · doi:10.1016/j.asoc.2014.06.027 · Cited by 282
Monthly Electric Energy Demand Forecasting Based on Trend Extraction
Gonzalez-Romera, E., Jaramillo-Moran, M. A., & Carmona-Fernandez, D. (2006) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2006.883666 · Cited by 254
Electricity price forecasting using artificial neural networks
Singhal, D., & Swarup, K. S. (2011) · International Journal of Electrical Power & Energy Systems · doi:10.1016/j.ijepes.2010.12.009 · Cited by 246
Computational intelligence approach for modeling hydrogen production: a review
Faizollahzadeh Ardabili, S., Najafi, B., Shamshirband, S., Minaei Bidgoli, B., Deo, R. C., & Chau, K.-W. (2018) · Engineering Applications of Computational Fluid Mechanics · doi:10.1080/19942060.2018.1452296 · Cited by 224
A comparative study of autoregressive neural network hybrids
Taskaya-Temizel, T., & Casey, M. C. (2005) · Neural Networks · doi:10.1016/j.neunet.2005.06.003 · Cited by 219
Adhikari, R., & Agrawal, R. K. (2014) · Neural Computing and Applications · doi:10.1007/s00521-013-1386-y · Cited by 193
Hann, T. H., & Steurer, E. (1996) · Neurocomputing · doi:10.1016/0925-2312(95)00137-9 · Cited by 137
SAS for Forecasting Time Series
Brocklebank, J. C., & Dickey, D. A. (2003) · Cited by 135
Neural network forecasting of short, noisy time series
Foster, W. R., Collopy, F., & Ungar, L. (1992) · Computers & Chemical Engineering · doi:10.1016/0098-1354(92)80049-f · Cited by 129
Neural network forecasting of quarterly accounting earnings
Callen, J. L., Kwan, C. C. Y., Yip, P. C. Y., et al. (1996) · International Journal of Forecasting · doi:10.1016/s0169-2070(96)00706-6 · Cited by 109
A new model selection strategy in time series forecasting with artificial neural networks: IHTS
Aras, S., & Kocakoç, İ. D. (2015) · Neurocomputing · doi:10.1016/j.neucom.2015.10.036 · Cited by 75
The unbeatable random walk in exchange rate forecasting: Reality or myth?
Moosa, I. A., & Burns, K. (2014) · Journal of Macroeconomics · doi:10.1016/j.jmacro.2014.03.003 · Cited by 72
How Good Are Neural Networks for Causal Forecasting
Denton, J. W. (1995) · The Journal of Business Forecasting Methods & Systems · Cited by 69
Comparison of the forecasting accuracy of neural networks with other established techniques
Brace, M. C., Schmidt, J., & Hadlin, M. (2002) · International Forum on Applications of Neural Networks to Power Systems · doi:10.1109/ann.1991.213493 · Cited by 53
Novel hybrid approach to data-packet-flow prediction for improving network traffic analysis
Chang, B. R., & Tsai, H. F. (2009) · Applied Soft Computing · doi:10.1016/j.asoc.2009.03.003 · Cited by 25
Cited by
An optimized model using LSTM network for demand forecasting
Abbasimehr, H., Shabani, M., & Yousefi, M. (2020) · Computers & Industrial Engineering · doi:10.1016/j.cie.2020.106435 · Cited by 538
Improving time series forecasting using LSTM and attention models
Abbasimehr, H., & Paki, R. (2022) · Journal of Ambient Intelligence and Humanized Computing · doi:10.1007/s12652-020-02761-x · Cited by 312
Metadata
- Authors
- Büyükşahin, Ü. Ç., & Ertekin, Ş.
- Venue
- Neurocomputing
- Publisher
- Elsevier BV
- Published
- 2019-10
- Volume
- 361
- Pages
- 151-163
- ISSN
- 0925-2312 (ISSN-L)
- OpenAlex
- W2907345037
- Cited by
- 307
- References
- 32
- FWCI
- 26.11
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.