Factors of Conflict in Construction Industry: A Literature Review
Open accessThe DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
Conflict seems to be very synonym with construction projects and giving the impressions of problems includes in increasing project cost, project delays, reduce productivity, lost of profit or damage in business relationships. The main goal of this paper is to overview the factors of conflict in construction industry. The study highlighted three (3) types of conflict factors which are conflict factors due to behavioral problems, contractual problems and technical problems. Factors of conflict due to behavioral factors includes reluctant to check for constructability, clarity and completeness and poor communication among project team. Meanwhile the factors of conflict which is due to contractual problems are such as late giving of possession, delay interim payment from client and unclear of contractual terms. Whereas, contractor fails to proceed in a competent manner and late instructions from architect or engineer are the factors of conflict which arise due to technical problems. This paper was hoped to be guidance for conflict management in future construction projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Transaction-Cost Economics: The Governance of Contractual Relations
Williamson, O. E. (1979) · The Journal of Law and Economics · doi:10.1086/466942 · Cited by 10,190
Exploring the Black Box: An Analysis of Work Group Diversity, Conflict and Performance
Pelled, L. H., Eisenhardt, K. M., & Xin, K. R. (1999) · Administrative Science Quarterly · doi:10.2307/2667029 · Cited by 2,971
Metadata
- Authors
- Jaffar, N., Tharim, A. H. A., & Shuib, M. N.
- Venue
- Procedia Engineering
- Publisher
- Elsevier BV
- Published
- 2011
- Volume
- 20
- Pages
- 193-202
- ISSN
- 1877-7058 (ISSN-L)
- OpenAlex
- W2058539900
- Cited by
- 182
- References
- 2
- FWCI
- 1.42
- Type
- conference paper
- Language
- en
- Open access
- diamond
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.