The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
BIM & the 5D Project Cost Manager
Open accessAbstract
This paper examines the global issues related to the role of project cost management professionals in the implementation and evolution of Building Information Modeling (BIM) in the construction industry. The paper is based on a review of current industry trends and issues with BIM implementation and detailed interviews with quantity surveying firms in Australia. BIM involves more than just 3D modelling and is also commonly defined in further dimensions such as 4D (time), 5D (cost) and even 6D (as-built operation). 4D links information and data in the 3D object model with project programming and scheduling data and facilitates the simulation analysis of construction activities. 5D integrates all of this information with cost data such as quantities, schedules and prices. 6D represents the as-built model that can then be used during the operational stages of the facility. This paper explores the importance for project cost management professionals to be integrally involved across all project phases and to embrace the 5th dimension to become key players in the BIM environment – the ‘5D Project Cost Manager’. The literature review and industry interviews will examine the issues associated with this and will identify leading edge best practices in the field by professional project cost management firms. The paper concludes with the findings that the greatest value with the modern day project cost manager lies in their ability to be 5D literate and to be able to utilise electronic models to provide detailed 5D estimates and living cost plans in real time.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The project benefits of Building Information Modelling (BIM)
Bryde, D., Broquetas, M., & Volm, J. M. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.12.001 · Cited by 1,268
Cited by
Oesterreich, T. D., & Teuteberg, F. (2016) · Computers in Industry · doi:10.1016/j.compind.2016.09.006 · Cited by 1,526
Towards a semantic Construction Digital Twin: Directions for future research
Boje, C., Guerriero, A., Kubicki, S., & Rezgui, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103179 · Cited by 1,324
A mixed review of the adoption of Building Information Modelling (BIM) for sustainability
Chong, H.-Y., Lee, C.-Y., & Wang, X. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.09.222 · Cited by 371
Building information modelling based building energy modelling: A review
Gao, H., Koch, C., & Wu, Y. (2019) · Applied Energy · doi:10.1016/j.apenergy.2019.01.032 · Cited by 349
Charef, R., Alaka, H., & Emmitt, S. (2018) · Journal of Building Engineering · doi:10.1016/j.jobe.2018.04.028 · Cited by 255
Metadata
- Authors
- Smith, P.
- Venue
- Procedia - Social and Behavioral Sciences
- Publisher
- Elsevier BV
- Published
- 2014-03
- Volume
- 119
- Pages
- 475-484
- ISSN
- 1877-0428 (ISSN-L)
- OpenAlex
- W2100168723
- Cited by
- 179
- References
- 1
- FWCI
- 19.66
- Type
- conference paper
- Language
- en
- Open access
- diamond
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: BIM & the 5D Project Cost Manager. https://app.cochat.ai/papers/10.1016/j.sbspro.2014.03.053
- The paper
- Smith, P. (2014). BIM & the 5D Project Cost Manager. Procedia - Social and Behavioral Sciences. https://doi.org/10.1016/j.sbspro.2014.03.053
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.