The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Optimising value from the soft re-use of brownfield sites
Open accessAbstract
Soft re-use of brownfields describes intended temporary or final re-uses of brownfield sites which are not based on built constructions or infrastructure ('hard' re-use). Examples of soft re-uses include the creation of public green space. These are essentially uses where the soil is not sealed. Often the case for soft re-use of brownfields has not been easy to demonstrate in strictly financial terms. The purpose of this paper is to describe a value based approach to identify and optimise services provided by the restoration of brownfields to soft re-uses, on a permanent or interim basis. A 'Brownfield Opportunity Matrix' is suggested as means of identifying and discussing soft restoration opportunities. The use of 'sustainability linkages' is suggested as a means of understanding the sustainability of the services under consideration and providing a structure for the overall valuation of restoration work, for example as part of design or option appraisal processes, or to support the solicitation of interest in a project.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Life cycle assessment (LCA) and cost-benefit analysis (CBA) are two widely used methods for evaluating the environmental and economic performance of conventional remediation systems [9] as well as NbS systems [10].”
From Life cycle assessment and cost-benefit analysis of nature-based solutions for contaminated land remediation: A mini-review (2023) · cites this paper as [10]
Citations
Cites
Biochar as a sorbent for contaminant management in soil and water: A review
Ahmad, M., Rajapaksha, A. U., Lim, J. E., Zhang, M., Bolan, N., Mohan, D., Vithanage, M., Lee, S. S., & Ok, Y. S. (2014) · Chemosphere · doi:10.1016/j.chemosphere.2013.10.071 · Cited by 4,662
Longitudinal effects on mental health of moving to greener and less green urban areas
Alcock, I., White, M. P., Wheeler, B. W., Fleming, L. E., & Depledge, M. H. (2014) · Environmental Science & Technology · doi:10.1021/es403688w · Cited by 665
Research works printed but not linked: 46
- Adelaja, 2010, Renewable energy potential on brownfield sites: a case study of Michigan, Energ Policy, 38, 7021, 10.1016/j.enpol.2010.07.021 · DOI
- Atkinson, 2008, Environmental cost–benefit analysis, Annu. Rev. Environ. Resour., 33, 317, 10.1146/annurev.environ.33.020107.112927 · DOI
- Atkinson, 2014, Brownfield regeneration to green space: delivery of project objectives for social and environmental gain, Urban For. Urban Green., 13, 586, 10.1016/j.ufug.2013.04.002 · DOI
- Bambra, 2014, Healthy land? An examination of the area-level association between brownfield land and morbidity and mortality in England, Environ. Plan. A, 46, 433, 10.1068/a46105 · DOI
- Bardos, 2008, Report of the NICOLE/SAGTA workshop: sustainable remediation 3rd March 2008, London, UK, Land Contamination and Reclamation, 16, 381, 10.2462/09670513.921 · DOI
- Bardos, 2014, Progress in sustainable remediation, Remediation Journal Winter, 2014, 23, 10.1002/rem.21412 · DOI
- Bardos, 2011, Applying sustainable development principles to contaminated land management using the SuRF-UK framework, Remediat. J., 21, 77, 10.1002/rem.20283 · DOI
- Bartke, 2011, Valuation of market uncertainties for contaminated land, Int. J. Strateg. Prop. Manag., 15, 356, 10.3846/1648715X.2011.633771 · DOI
- Bartke, 2015, No perfect tools: trade-offs of sustainability principles and user requirements in designing support tools for land-use decisions between greenfields and brownfields, J. Environ. Manag., 153, 11, 10.1016/j.jenvman.2015.01.040 · DOI
- BenDor, 2011, The dynamics of brownfield redevelopment, Sustainability, 3, 914, 10.3390/su3060914 · DOI
- Benedict, 2006, Green infrastructure, Renewable Resources Journal, 20, 12
- Bleicher, 2010, Sustainability assessment and the revitalization of contaminated sites: operationalizing sustainable development for local problems, International Journal of Sustainable Development & World Ecology, 17, 57, 10.1080/13504500903488263 · DOI
- Bolund, 1999, Ecosystem services in urban areas, Ecol. Econ., 29, 293, 10.1016/S0921-8009(99)00013-0 · DOI · Paper page
- Brouwer, 2004, Integrated ecological, economic and social impact assessment of alternative flood control policies in the Netherlands, Ecol. Econ., 50, 1, 10.1016/j.ecolecon.2004.01.020 · DOI
- Cappuyns, 2012, Evaluation of the environmental impact of brownfield remediation options: comparison of two life cycle assessment-based evaluation tools, Environ. Technol., 33, 2447, 10.1080/09593330.2012.671854 · DOI
- Cellini, S.R. and Kee, J.E. (2010). Cost-effectiveness and cost–benefit analysis, in (Eds. Wholey, J. S., Hatry, H. P. and Newcomer, K. E.) Handbook of Practical Program Evaluation, 3rd edition, Wiley, pp 493–530. ISBN: 978-0-470-52247-9.
- Chiesura, 2004, The role of urban parks for the sustainable city, Landsc. Urban Plan., 68, 129, 10.1016/j.landurbplan.2003.08.003 · DOI · Paper page
- CL:AIRE. (2006). The role of the UK development industry in brownfield regeneration. subr:im Bulletin SUB 1. Contaminated Land: Applications in Real Environments (CL:AIRE), London, UK. www.claire.co.uk. Accessed July 2015.
- CL:AIRE. (2007a). Uncovering the true impacts of remediation. subr:im Bulletin SUB 2.CL:AIRE, London, UK. www.claire.co.uk. Accessed July 2015.
- CL:AIRE. (2007b). Measuring sustainability: what's in a number? subr:im Bulletin SUB 4.CL:AIRE, London, UK. www.claire.co.uk. Accessed July 2015.
- Cundy, 2013, Developing principles of sustainability and stakeholder engagement for ‘gentle’ remediation approaches: the European context, J. Environ. Manag., 129, 283, 10.1016/j.jenvman.2013.07.032 · DOI · Paper page
- Döberl, 2013, Introducing a goal-oriented sustainability assessment method to support decision making in contaminated site management. Env, Sci, Policy, 25, 207
- Doick, 2009, Understanding success in the context of brownfield greening projects: the requirement for outcome evaluation in urban green space success assessment, Urban For. Urban Green., 8, 163, 10.1016/j.ufug.2009.05.002 · DOI
- Haase, 2008, Urban ecology of shrinking cities: an unrecognized opportunity?, Nature and Culture, 3, 1, 10.3167/nc.2008.030101 · DOI
- Haase, 2012, Synergies, trade-offs and losses of ecosystem services in urban regions: an integral multiscale framework applied to the Leipzig–Halle region, Germany, Ecol. Soc., 17, 22, 10.5751/ES-04853-170322 · DOI
- Harbottle, 2008, Sustainability of land remediation, part 1: overall analysis, Proceedings of the Institution of Civil Engineers Geotechnical Engineering, 161, 75, 10.1680/geng.2008.161.2.75 · DOI
- Harbottle, 2008, Sustainability of land remediation, part 2: impact assessment, Proceedings of the Institution of Civil Engineers Geotechnical Engineering, 161, 117, 10.1680/geng.2008.161.3.117 · DOI
- Holland, 2013, Integrating remediation and reuse to achieve whole-system sustainability benefits, Remediat. J., 23, 5, 10.1002/rem.21345 · DOI
- Lee, 2005, Modeling the relationship among brownfields, property values, and community revitalization, Housing Policy Debate, 16
- Ling, C., Handley, J. and Rodwell, J. (2003) Multifunctionality and scale in post-industrial land regeneration. Pp27-34 in Land Reclamation Proceedings of the 7th International Conference, Runcorn, UK, 13–16 May 2003. (Eds Moore, H.M., Fox, H.R. and Elliott, S.) A A Balkema Publishers ISBN 9058095622. · DOI
- Lord, 2008, Biomass, remediation, restoration (BioReGen Life Project): reusing brownfield sites for renewable energy crops, GeoCongress, 177, 52
- Luederitz, 2015, A review of urban ecosystem services: six key challenges for future research, Ecosystem Services, 14, 98, 10.1016/j.ecoser.2015.05.001 · DOI
- Mathey, J., Rößle, S., Banse, J., Lehmann, I. and Bräuer, A. (2015) Brownfields as an element of green infrastructure for implementing ecosystem services into urban areas. Journal of Urban Planning and Development 141, 3 http://dx.doi.org/10.1061/(ASCE)UP.1943-5444.0000275. · DOI
- Morrison, 2014, An initial assessment of spatial relationships between respiratory cases, soil metal content, air quality and deprivation indicators in Glasgow, Scotland, UK: relevance to the environmental justice agenda, Environ. Geochem. Health, 36, 319, 10.1007/s10653-013-9565-4 · DOI
- Nathanail, C. P. and Bardos, R.P. (2004). Reclamation of Contaminated Land. Wiley and Sons. ISBN 0471985600. (http://www.wileyeurope.com/WileyCDA/WileyTitle/productCd-0471985619.html). · DOI
- Nowak, 2006, Air pollution removal by urban trees and shrubs in the United States, Urban For. Urban Green., 4, 115, 10.1016/j.ufug.2006.01.007 · DOI
- Pediaditi, 2005, Monitoring the sustainability of brownfield redevelopment projects. The Redevelopment Assessment Framework (RAF), Contaminated Land and Reclamation, 13, 173, 10.2462/09670513.665 · DOI
- Pizzol, 2016, Timbre Brownfield Prioritization Tool to support effective brownfield regeneration, J. Environ. Manag., 166, 178, 10.1016/j.jenvman.2015.09.030 · DOI
- RESCUE Consortium (2005) Best Practice Guidance for Sustainable Brownfield Regeneration. May 2005. Land Quality Press, a Division of Land Quality Management Ltd. ISBN 0-9547474-0-2.
- Rizzo, 2016, Comparison of international approaches to sustainable remediation, J. Environ. Manag., 10.1016/j.jenvman.2016.07.062 · DOI
- Rodríguez, 2006, Trade-offs across space, time, and ecosystem services, Ecol. Soc., 11, 28, 10.5751/ES-01667-110128 · DOI
- Skelhorn, 2014, The impact of vegetation types on air and surface temperatures in a temperate city: a fine scale assessment in Manchester, UK, Landsc. Urban Plan., 121, 129, 10.1016/j.landurbplan.2013.09.012 · DOI
- Tang, 2012, Sticks and stones: the impact of the definitions of brownfield in policies on socio-economic sustainability, Sustainability, 4, 840, 10.3390/su4050840 · DOI
- Taylor, 2012, Mapping public and private spaces of urban agriculture in Chicago through the analysis of high-resolution aerial images in Google Earth, Landsc. Urban Plan., 108, 57, 10.1016/j.landurbplan.2012.08.001 · DOI
- Thornton, 2007, The challenge of sustainability: incentives for brownfield restoration in Europe, Environ. Sci. Pol., 10, 116, 10.1016/j.envsci.2006.08.008 · DOI
- Van der Meulen, 2011, The use of economic valuation to create public support for green infrastructure investments in urban areas, Landsc. Urban Plan., 103, 198, 10.1016/j.landurbplan.2011.07.010 · DOI
Cited by
Sorted by citations
Sustainable remediation and redevelopment of brownfield sites
Hou, D., Al-Tabbaa, A., O’Connor, D., Hu, Q., Zhu, Y.-G., Wang, L., Kirkwood, N., Ok, Y. S., Tsang, D. C. W., Bolan, N. S., et al. (2023) · Nature Reviews Earth & Environment · doi:10.1038/s43017-023-00404-1 · Cited by 338
Cundy, A. B., Bardos, R. P., Puschenreiter, M., Mench, M., Bert, V., Friesl-Hanl, W., Müller, I., Li, X. N., Weyens, N., Witters, N., et al. (2016) · Journal of Environmental Management · doi:10.1016/j.jenvman.2016.03.028 · Cited by 172
Alshehri, K., Gao, Z., Harbottle, M., Sapsford, D., & Cleall, P. (2023) · Heliyon · doi:10.1016/j.heliyon.2023.e20632 · Cited by 32
“Life cycle assessment (LCA) and cost-benefit analysis (CBA) are two widely used methods for evaluating the environmental and economic performance of conventional remediation systems [9] as well as NbS systems [10].”
BackgroundMethod
Metadata
- Authors
- Bardos, R. P., Jones, S., Stephenson, I., Menger, P., Beumer, V., Neonato, F., Maring, L., Ferber, U., Track, T., & Wendler, K.
- Affiliations
- University of Reading (GB)
- Euskadiko Parke Teknologikoa (ES)
- Deltares (NL)
- Society for Chemical Engineering and Biotechnology (DE)
- Venue
- Science of The Total Environment
- Publisher
- Elsevier BV
- Published
- 2016-09
- Volume
- 563-564
- Pages
- 769-782
- ISSN
- 0048-9697 (ISSN-L)
- OpenAlex
- W2202784791
- Cited by
- 84
- References
- 3
- Citations by year
- 2026: 7 · 2025: 6 · 2024: 10 · 2023: 9 · 2022: 9 · 2021: 7 · 2020: 11 · 2019: 5 · 2018: 11 · 2017: 4 · 2016: 5
- FWCI
- 18.82
- Type
- journal article
- Language
- en
- Open access
- Licence
- cc-by-nc-nd
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
- Locations
- The Science of The Total Environment (publishedVersion)
- PubMed (publishedVersion)
- University of Brighton Repository (University of Brighton) (publishedVersion, cc-by-nc-nd)
- TECNALIA Publications (Fundación TECNALIA Research & Innovation) (submittedVersion, public-domain)
- Funders
- European Community (265097)
- Topics
- Social Sciences › Geography, Planning and Development › Urban Planning and Valuation
- Social Sciences › Sociology and Political Science › Environmental Justice and Health Disparities
- Social Sciences › Economics, Econometrics and Finance › Economics and Econometrics › Economic and Environmental Valuation
- Keywords
- brownfields, brownfield restoration, ecosystem services valuation, public green spaces, land reuse
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review