Ant colony optimization for the real-time train routing selection problem
The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(2007) · Handbook of Approximation Algorithms and Metaheuristics · doi:10.1201/9781420010749-33 · Cited by 6,607
Hoos (2000) · doi:10.1016/s0167-739x(00)00043-1 · Cited by 2,737 · cited 1×
“The ACOrtTRSP algorithm is based on the MAX-MIN Ant System (Stützle and Hoos, 2000), in which upper and lower bounds are imposed on the pheromone trails.”
MethodThe irace package: Iterated racing for automatic algorithm configuration
López-Ibáñez, M., Dubois-Lacoste, J., Pérez Cáceres, L., Birattari, M., & Stützle, T. (2016) · Operations Research Perspectives · doi:10.1016/j.orp.2016.09.002 · Cited by 1,761
Nominal and robust train timetabling problems
Cacchiani, V., & Toth, P. (2011) · European Journal of Operational Research · doi:10.1016/j.ejor.2011.11.003 · Cited by 436 · cited 1×
“…the problems deal with the creation of plans for the utilization of infrastructure and human resources, including timetable generation and platform planning in station areas (Cacchiani and Toth, 2012; Carey and Carville, 2003; Carey and Crawford, 2007; Sels et al., 2014; Zwaneveld et al., 2001).”
BackgroundA tabu search algorithm for rerouting trains during rail operations
Corman, F., D’Ariano, A., Pacciarelli, D., & Pranzo, M. (2009) · Transportation Research Part B Methodological · doi:10.1016/j.trb.2009.05.004 · Cited by 354 · cited 3×
“…Lamorgese and Mannino, 2015; Mu and Dessouky, 2011; Törnquist and Persson, 2007), while microscopic approaches model each resource as a single block-section (Corman et al., 2010; D’Ariano et al., 2007- 2008) or a single track-circuit (Caimi et al., 2012; Pellegrini et al., 2014; Rodriguez, 2007).”
BackgroundSelf-citationReordering and Local Rerouting Strategies to Manage Train Traffic in Real Time
D'Ariano, A., Corman, F., Pacciarelli, D., & Pranzo, M. (2008) · Transportation Science · doi:10.1287/trsc.1080.0247 · Cited by 258 · cited 1×
“In Corman et al. (2010) and D’Ariano et al. (2008), this solution is bettered through an iterative procedure that, at each step, changes the routing for a certain number of trains and then finds new timings and orderings for the trains affected.”
BackgroundSelf-citationMeng, L., & Zhou, X. S. (2011) · Transportation Research Part B Methodological · doi:10.1016/j.trb.2011.05.001 · Cited by 247 · cited 2×
“…(Rodriguez, 2007), mixed-integer programming (D’Ariano et al., 2014; Dessouky et al., 2006; Lamorgese and Mannino, 2015; Liu and Kozan, 2009; Meng and Zhou, 2011; Pellegrini et al., 2014; Törnquist and Persson, 2007), multicommodity flow models (Caimi et al., 2011-2012), set-packing…”
BackgroundA Review of Online Dynamic Models and Algorithms for Railway Traffic Management
Corman, F., & Meng, L. (2015) · IEEE Transactions on Intelligent Transportation Systems · doi:10.1109/tits.2014.2358392 · Cited by 246 · cited 3×
“Further modeling approaches are discussed in the survey papers of Cacchiani et al. (2014), Corman and Meng (2015), Fang et al. (2015) and the recent book of Hansen and Pachl (2014).”
BackgroundMethodA Survey on Problem Models and Solution Approaches to Rescheduling in Railway Networks
Fang, W., Yang, S., & Yao, X. (2015) · IEEE Transactions on Intelligent Transportation Systems · doi:10.1109/tits.2015.2446985 · Cited by 222 · cited 3×
“Further modeling approaches are discussed in the survey papers of Cacchiani et al. (2014), Corman and Meng (2015), Fang et al. (2015) and the recent book of Hansen and Pachl (2014).”
BackgroundMethodScheduling and platforming trains at busy complex stations
Carey, M., & Carville, S. (2003) · Transportation Research Part A Policy and Practice · doi:10.1016/s0965-8564(02)00012-5 · Cited by 187 · cited 2×
“The cost definitions sharing the best minimum value (6) of the pseudo-median are: All Train, Min Train and Max Train.”
BackgroundOptimal Lines in Public Rail Transport
Bussieck, M. R. (1998) · Digitale Bibliothek Braunschweig (Verbundzentrale Göttingen (VZG)) · doi:10.24355/dbbs.084-200511080100-231 · Cited by 170 · cited 2×
“On a strategic level, the problems deal with line planning and infrastructure construction and/or modification (Bussieck, 1998; Goossens et al., 2005; Scholl, 2005).”
BackgroundScheduling freight trains traveling on complex networks
Mu, S., & Dessouky, M. M. (2011) · Transportation Research Part B Methodological · doi:10.1016/j.trb.2011.05.021 · Cited by 117 · cited 3×
“Another advantage compared to Mu and Dessouky (2011) is the capability to deal with any kind of network structure.”
BackgroundInfluentialA study of ACO capabilities for solving the maximum clique problem
Solnon, C., & Fenet, S. (2006) · Journal of Heuristics · doi:10.1007/s10732-006-4295-8 · Cited by 102 · cited 4×
“During the update of the pheromone trails, some pheromone evaporates from all links of G and some additional pheromone is deposited on the links belonging to BestS, following the clique pheromone strategy (Solnon and Bridge, 2006a).”
MethodInfluentialA New Resource-Constrained Multicommodity Flow Model for Conflict-Free Train Routing and Scheduling
Caimi, G., Chudak, F. A., Fuchsberger, M., Laumanns, M., & Zenklusen, R. (2010) · Transportation Science · doi:10.1287/trsc.1100.0349 · Cited by 98 · cited 3×
“In Caimi et al. (2011) and Rodriguez (2007), the rtRTMP is solved in two steps: first the routing to assign to each train is investigated and then the ordering decisions are taken.”
BackgroundRECIFE-MILP: An Effective MILP-Based Heuristic for the Real-Time Railway Traffic Management Problem
Pellegrini, P., Marlière, G., Pesenti, R., & Rodríguez, J. (2015) · IEEE Transactions on Intelligent Transportation Systems · doi:10.1109/tits.2015.2414294 · Cited by 97 · cited 9×
“…al., 2010; D’Ariano et al., 2007); ii) what function of the delay is minimized, e.g., maximum (Corman et al., 2014; D’Ariano et al., 2014) or total (Pellegrini et al., 2015; Rodriguez, 2007); iii) the consideration of weights for the different types of trains, (Lamorgese and Mannino, 2015;…”
BackgroundMethodSelf-citationAnt Colony Optimization approach for solving rolling stock planning for passenger trains
TSUJI, Y., Kuroda, M., Kitagawa, Y., & Imoto, Y. (2012) · IEEE/SICE International Symposium on System Integration (SII) · doi:10.1109/sii.2012.6427319 · Cited by 13 · cited 1×
“The ACO meta-heuristic has already been applied to a number of complex problems in the railway domain, including rolling stock circulation (Tsuji et al., 2012), timetabling (Huang, 2006) and re-scheduling (Fan et al., 2012) problems.”
Method
Cited by
The irace package: Iterated racing for automatic algorithm configuration
López-Ibáñez, M., Dubois-Lacoste, J., Pérez Cáceres, L., Birattari, M., & Stützle, T. (2016) · Operations Research Perspectives · doi:10.1016/j.orp.2016.09.002 · Cited by 1,761
“…, graph coloring [23] , image binarization [69] , network pricing [90] , combined routing and packing problems [25] , real-time routing selection [84] , capacitated arc routing [26] , bike sharing rebalancing [30] , energy planning [47] , university course timetabling [72] , time series…”
Background
Metadata
- Authors
- Samà, M., Pellegrini, P., D’Ariano, A., Rodriguez, J., & Pacciarelli, D.
- Venue
- Transportation Research Part B: Methodological
- Publisher
- Elsevier BV
- Published
- 2016-03
- Volume
- 85
- Pages
- 89-108
- ISSN
- 0191-2615 (ISSN-L)
- OpenAlex
- W2293789805
- Cited by
- 166
- References
- 16
- FWCI
- 32.19
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.