The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
A system dynamics-based environmental performance simulation of construction waste reduction management in China
Abstract
A huge amount of construction waste has been generated from increasingly higher number of construction activities than in the past, which has significant negative impacts on the environment if they are not properly managed. Therefore, effective construction waste management is of primary importance for future sustainable development. Based on the theory of planned behaviors, this paper develops a system dynamic model of construction waste reduction management at the construction phase to simulate the environmental benefits of construction waste reduction management. The application of the proposed model is shown using a case study in Shenzhen, China. Vensim is applied to simulate and analyze the model. The simulation results indicate that source reduction is an effective waste reduction measure which can reduce 27.05% of the total waste generation. Sorting behaviors are a premise for improving the construction waste recycling and reuse rates which account for 15.49% of the total waste generated. The environmental benefits of source reduction outweigh those of sorting behaviors. Therefore, to achieve better environmental performance of the construction waste reduction management, attention should be paid to source reduction such as low waste technologies and on-site management performance. In the meantime, sorting behaviors encouragement such as improving stakeholders' waste awareness, refining regulations, strengthening government supervision and controlling illegal dumping s…
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Proper separation of reusable components after deconstruction is a factor driving reuse.
“Training operators for effective deconstruction (Dantata et al., 2005; Elias Özkan, 2012; Shaurette, 2006), availability of space for the storage of the reusable components after deconstruction (Rogers, 2011) and knowledge and experience in using reused components (Tingley et al., 2017), as well as proper separation of the reusable components after deconstruction (Ajayi et al., 2017; Ding et al.,”
From Components reuse in the building sector – A systematic review (2020) · cites this paper as Ding et al., 2016
Citations
Cites
The theory of planned behavior
Ajzen, I. (1991) · Organizational Behavior and Human Decision Processes · doi:10.1016/0749-5978(91)90020-t · Cited by 90,587
Flagged first, then by citations
Research works printed but not linked: 30
- Ajzen, 1970, The prediction of behavior from attitudinal and normative variables, J. Exp. Soc. Psychol., 6, 466, 10.1016/0022-1031(70)90057-0 · DOI
- Begum, 2009, Attitude and behavioral factors in waste management in the construction industry in Malaysia, Resour. Conserv. Recycl., 53, 321, 10.1016/j.resconrec.2009.01.005 · DOI
- Ding, 2014, Estimating of building-related construction and demolition waste in Shanghai, Waste Manage., 34, 2327, 10.1016/j.wasman.2014.07.029 · DOI
- Esin, 2007, A study conducted to reduce construction waste generation in Turkey, Build. Environ., 42, 1667, 10.1016/j.buildenv.2006.02.008 · DOI
- Faniran, 1998, Minimizing waste on construction project sites, Eng. Constr. Archit. Manage., 5, 182, 10.1108/eb021073 · DOI
- Forrester, 1994, System dynamics, systems thinking, and soft OR, Syst. Dynam. Rev., 10, 245, 10.1002/sdr.4260100211 · DOI
- Forrester, 1980, Test for building confidence in system dynamics models, vol. 14
- Hao, 2007, A simulation model using system dynamic method for construction and demolition waste management in Hong Kong, Constr. Innov., 7, 7, 10.1108/14714170710721269 · DOI
- Hao, 2008, The effectiveness of Hong Kong’s construction waste disposal charging scheme, Waste Manage. Res., 26, 553, 10.1177/0734242X07085345 · DOI
- Hao, 2010, Dynamic modeling of construction and demolition waste management processes: an empirical study in Shenzhen, China, Eng., Constr. Archit. Manage., 17, 476, 10.1108/09699981011074574 · DOI
- Herremans, 2000, Environmental management systems at North American universities, Int. J. Sustain. High. Educ., 1, 168
- Jaillon, 2009, Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong, Waste Manage., 29, 309, 10.1016/j.wasman.2008.02.015 · DOI
- Li, 2010, Investigation on the on-site construction waste reduction measures, J. Eng. Manage., 24, 4
- Lu, 2010, Exploring critical success factors for waste management in construction projects of China, Resour. Conserv. Recycl., 55, 201, 10.1016/j.resconrec.2010.09.010 · DOI
- Marzouk, 2014, Environmental and economic impact assessment of construction and demolition waste disposal using system dynamics, Resour. Conserv. Recycl., 82, 41, 10.1016/j.resconrec.2013.10.015 · DOI
- Ortiz, 2010, The environmental impact of the construction phase: an application to composite walls from a life cycle perspective, Resour. Conserv. Recycl., 54, 832, 10.1016/j.resconrec.2010.01.002 · DOI
- Osmani, 2008, Architects’ perspectives on construction waste reduction by design, Waste Manage., 28, 1147, 10.1016/j.wasman.2007.05.011 · DOI
- Poon, 2001, On-site sorting of construction and demolition waste in Hong Kong, Resour. Conserv. Recycl., 32, 157, 10.1016/S0921-3449(01)00052-0 · DOI · Paper page
- Poon, 2001, On-site sorting of construction and demolition waste in Hong Kong, Resour. Conserv. Recycl., 32, 157, 10.1016/S0921-3449(01)00052-0 · DOI · Paper page
- Qudrat-Ullah, 2010, How to do structural validity of a system dynamics type simulation model: the case of an energy policy model, Energy Policy, 38, 2216, 10.1016/j.enpol.2009.12.009 · DOI
- Richardson, 2008, Applications of system dynamics in marketing: editorial, J. Bus. Res., 61, 1099, 10.1016/j.jbusres.2007.11.003 · DOI
- Seror, 2014, Evaluating the effect of vehicle impoundment policy on illegal construction and demolition waste dumping: Israel as a case study, Waste Manage., 34, 1436, 10.1016/j.wasman.2014.03.026 · DOI
- Tam, 2014, System dynamic modeling on construction waste management in Shenzhen, China, Waste Manage. Res., 32, 441, 10.1177/0734242X14527636 · DOI
- Tam, 2006, A review on the viable technology for construction waste recycling, Resour. Conserv. Recycl., 47, 209, 10.1016/j.resconrec.2005.12.002 · DOI
- Teo, 2001, A theory of waste behavior in the construction industry, Constr. Manage. Econom., 19, 10.1080/01446190110067037 · DOI
- Wang, 2012, An economic assessment of construction waste based on system dynamics, Constr. Econ., 95
- Wang, 2010, Critical success factors for on-site sorting of construction waste: a China study, Resour. Conserv. Recycl., 54, 931, 10.1016/j.resconrec.2010.01.012 · DOI
- Yuan, 2012, A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste, Waste Manage., 32, 521, 10.1016/j.wasman.2011.11.006 · DOI · Paper page
- Yuan, 2014, A system dynamics model for determining the waste disposal charging fee in construction, Eur. J. Oper. Res., 237, 988, 10.1016/j.ejor.2014.02.034 · DOI
- Zhu, 2012, Construction personnel attitude and behavior on construction waste minimization, J. Civ. Eng. Manage., 39
Cited by
Sorted by citations
Components reuse in the building sector – A systematic review
Rakhshan, K., Morel, J.-C., Alaka, H., & Charef, R. (2020) · Waste Management & Research: The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x20910463 · Cited by 167
Alhawamdeh, M., Ferriz-Papi, J. A., & Lee, A. (2024) · Sustainability · doi:10.3390/su16146014 · Cited by 33
Metadata
- Authors
- Ding, Z., Yi, G., Tam, V. W. Y., & Huang, T.
- Affiliations
- Shenzhen University (CN)
- Western Sydney University (AU)
- Corresponding author
- Tam, Vivian W.Y.
- Venue
- Waste Management
- Publisher
- Elsevier BV
- Published
- 2016-05
- Volume
- 51
- Pages
- 130-141
- ISSN
- 0956-053X (ISSN-L)
- OpenAlex
- W2302149836
- Cited by
- 268
- References
- 1
- Citations by year
- 2026: 14 · 2025: 27 · 2024: 26 · 2023: 33 · 2022: 44 · 2021: 40 · 2020: 26 · 2019: 18 · 2018: 27 · 2017: 8 · 2016: 5
- FWCI
- 21.25
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Waste Management (publishedVersion)
- PubMed (publishedVersion)
- Funders
- National Nature Science Foundation for Young Scholars of China (71202101)
- Scientific Planning Research (2009-K4-17, 2011-K6-24)
- Ministry of Housing and Urban-Rural Development of P.R.C
- Topics
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Environmental Science › Waste Management and Disposal › Municipal Solid Waste Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Sustainable Supply Chain Management
- Keywords
- construction waste, pollution prevention, waste sorting behavior, waste recycling in construction, theory of planned behavior, environmental performance, system dynamics modeling, low-waste technologies, waste awareness, illegal dumping, Shenzhen
- MeSH terms
- China, Computer Simulation, Construction Materials, Industrial Waste, Models, Theoretical, Waste Management, Recycling
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review