Critical path analysis in the network with fuzzy activity times
The DOI matches its Crossref record; 10 of the 10 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
DUBOIS, D., & PRADE, H. (1978) · International Journal of Systems Science · doi:10.1080/00207727808941724 · Cited by 2,696 · cited 3×
“We will use the following notation, introduced in [7], for a fuzzy number à of L–R type:”
BackgroundMethodInfluentialApplication of a Technique for Research and Development Program Evaluation
Malcolm, D. G., Roseboom, J. H., Clark, C. E., & Fazar, W. (1959) · Operations Research · doi:10.1287/opre.7.5.646 · Cited by 930 · cited 1×
“Therefore, as early as the paper [ 12 ] the method called in literature the PERT method has been suggested with the formulation of the not unique estimations of the activity times, and the conception of the random variable with the beta distribution has been used to model the activity times.”
MethodCritical-Path Planning and Scheduling: Mathematical Basis
Kelley, J. E. (1961) · Operations Research · doi:10.1287/opre.9.3.296 · Cited by 910 · cited 1×
“The critical path method (CPM), worked out at the beginning of the 1960s (see [10]), has become one of the tools that are most useful in practice and are applied in the planning and control of the realization of complex projects.”
MethodThe use of fuzzy variables in pert
Chanas, S., & Kamburowski, J. (1981) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(81)90030-0 · Cited by 238
Self-citationAn efficient approach for large scale project planning based on fuzzy Delphi method
Chang, I. S., Tsujimura, Y., Gen, M., et al. (1995) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(94)00385-4 · Cited by 112
Lootsma, F. A. (1997) · Applied optimization · doi:10.1007/978-1-4757-2618-3_3 · Cited by 76 · cited 1×
“The papers ([1– 4,6,8,9,11,13–16,18–22]) set in references surely do not exhaust all the papers connected with the fuzzy PERT.”
BackgroundUsing PERT as an approximation of fuzzy project-network analysis
McCahon, C. S. (1993) · IEEE Transactions on Engineering Management · doi:10.1109/17.277406 · Cited by 73 · cited 1×
“The papers ([1– 4,6,8,9,11,13–16,18–22]) set in references surely do not exhaust all the papers connected with the fuzzy PERT.”
BackgroundLootsma, F. A. (1989) · European Journal of Operational Research · doi:10.1016/0377-2217(89)90211-7 · Cited by 67
The personalization of security selection: An application of fuzzy set theory
Hammerbacher, I. M., & Yager, R. R. (1981) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(81)90029-4 · Cited by 26
FUZZY SETS IN FEW CLASSICAL OPERATIONAL RESEARCH PROBLEMS
Chanas, S. (1993) · Elsevier eBooks · doi:10.1016/b978-1-4832-1450-4.50086-9 · Cited by 14
Self-citation
Cited by
Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
Dubois, D., Fargier, H., & Fortemps, P. (2003) · European Journal of Operational Research · doi:10.1016/s0377-2217(02)00558-1 · Cited by 291
Metadata
- Authors
- Chanas, S., & Zieliński, P.
- Venue
- Fuzzy Sets and Systems
- Publisher
- Elsevier BV
- Published
- 2001-09
- Volume
- 122
- Issue
- 2
- Pages
- 195-204
- ISSN
- 0165-0114 (ISSN-L)
- OpenAlex
- W2009479118
- Cited by
- 236
- References
- 10
- FWCI
- 13.84
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.