A GA-based fuzzy optimal model for construction time–cost trade-off
The DOI matches its Crossref record; 10 of the 10 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Genetic algorithms in search, optimization, and machine learning
(1989) · Choice Reviews Online · doi:10.5860/choice.27-0936 · Cited by 49,010
Zadeh, L. A. (1996) · Cited by 46,857
Fuzzy Sets and Fuzzy Logic: Theory and Applications
Klir, G. J., & Yuan, B. (1995) · Medical Entomology and Zoology · Cited by 6,240
Fuzzy sets and fuzzy logic: theory and applications
(1996) · Choice Reviews Online · doi:10.5860/choice.33-2786 · Cited by 1,871
Critical-Path Planning and Scheduling: Mathematical Basis
Kelley, J. E. (1961) · Operations Research · doi:10.1287/opre.9.3.296 · Cited by 910
Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems
Feng, C.-W., Liu, L., & Burns, S. A. (1997) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(1997)11:3(184 · Cited by 549
Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
Talbot, F. B. (1982) · Management Science · doi:10.1287/mnsc.28.10.1197 · Cited by 456
The use of fuzzy variables in pert
Chanas, S., & Kamburowski, J. (1981) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(81)90030-0 · Cited by 238
Using PERT as an approximation of fuzzy project-network analysis
McCahon, C. S. (1993) · IEEE Transactions on Engineering Management · doi:10.1109/17.277406 · Cited by 73
Cited by
Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects
Creedy, G. D., Skitmore, M., & Wong, J. K. W. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000160 · Cited by 242
“Construction is particularly prone to this for, as Leu et al. (2001) note, there are many uncertain variables during project implementation that dynamically affect project duration and cost (del Cano and de la Cruz 2002).”
BackgroundBid/no-bid decision-making – a fuzzy linguistic approach
Lin, C.-T., & Chen, Y.-T. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.01.005 · Cited by 182
Six decades of project management research: Thematic trends and future opportunities
Padalkar, M., & Gopinath, S. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.006 · Cited by 182
“Project methods are also viewed through the non-deterministic lens employing fuzzy logic (Leu et al., 2001; Lin and Chen, 2004; Hsieh et al., 2004) or statistical methods (Lipke et al., 2009).”
Method
Metadata
- Authors
- Leu, S.-S., Chen, A.-T., & Yang, C.-H.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2001-01
- Volume
- 19
- Issue
- 1
- Pages
- 47-58
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2092810729
- Cited by
- 181
- References
- 10
- FWCI
- 6.09
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: A GA-based fuzzy optimal model for construction time–cost trade-off. https://app.cochat.ai/papers/10.1016/s0263-7863(99)00035-6
- The paper
- Leu, S.-S., Chen, A.-T., & Yang, C.-H. (2001). A GA-based fuzzy optimal model for construction time–cost trade-off. International Journal of Project Management. https://doi.org/10.1016/s0263-7863(99)00035-6
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.