An EOQ model for deteriorating items under supplier credits linked to ordering quantity
Open accessThe DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A model for an exponentially decaying inventory
Ghare, P. M. (1963) · Medical Entomology and Zoology · Cited by 1,399
Recent trends in modeling of deteriorating inventory
Goyal, S. K., & Giri, B. C. (2001) · European Journal of Operational Research · doi:10.1016/s0377-2217(00)00248-4 · Cited by 1,323
An EOQ Model for Items with Weibull Distribution Deterioration
Covert, R. P., & Philip, G. C. (1973) · A I I E Transactions · doi:10.1080/05695557308974918 · Cited by 908
Ordering Policies of Deteriorating Items Under Permissible Delay in Payments
Aggarwal, S. P., & Jaggi, C. K. (1995) · Journal of the Operational Research Society · doi:10.1057/jors.1995.90 · Cited by 867
An ordering policy for deteriorating items with allowable shortage and permissible delay in payment
Jamal, A. M. M., Sarker, B. R., & Wang, S. (1997) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600428 · Cited by 589
(T, S i ) Policy Inventory Model for Deteriorating Items with Time Proportional Demand
Dave, U., & Patel, L. K. (1981) · Journal of the Operational Research Society · doi:10.1057/jors.1981.27 · Cited by 473
Hwang, H., & Shinn, S. W. (1997) · Computers & Operations Research · doi:10.1016/s0305-0548(96)00069-x · Cited by 382
An inventory model with deteriorating items under inflation when a delay in payment is permissible
Liao, H., Tsai, C., & Su, C. (2000) · International Journal of Production Economics · doi:10.1016/s0925-5273(99)00015-8 · Cited by 328
Optimal EOQ Models for Deteriorating Items with Time-Varying Demand
Hariga, M. (1996) · Journal of the Operational Research Society · doi:10.1057/jors.1996.151 · Cited by 257
On (T, S i ) Policy Inventory Model for Deteriorating Items with Time Proportional Demand
Sachan, R. (1984) · Journal of the Operational Research Society · doi:10.1057/jors.1984.197 · Cited by 224
Economic order quantity of deteriorating items under permissible delay in payments
Chu, P., Chung, K., & Lan, S.-P. (1998) · Computers & Operations Research · doi:10.1016/s0305-0548(98)00006-9 · Cited by 217
Chang, H.-J., & Dye, C.-Y. (2001) · International Journal of Systems Science · doi:10.1080/002077201300029700 · Cited by 217
Chang, H., Hung, C.-H., & Dye, C.-Y. (2001) · Production Planning & Control · doi:10.1080/095372801300107806 · Cited by 164
Yang, H., Teng, J., & Chern, M. (2001) · Naval Research Logistics (NRL) · doi:10.1002/1520-6750(200103)48:2<144::aid-nav3>3.0.co;2-8 · Cited by 120
Self-citationDeterministic lot-size inventory models with shortages and deterioration for fluctuating demand
Teng, J., Chern, M., Yang, H., & Wang, Y. J. (1999) · Operations Research Letters · doi:10.1016/s0167-6377(98)00042-x · Cited by 102
Self-citationShah, N. H. (1993) · International Journal of Production Economics · doi:10.1016/0925-5273(93)90009-a · Cited by 101
Cited by
Review of inventory systems with deterioration since 2001
Bakker, M., Riezebos, J., & Teunter, R. H. (2012) · European Journal of Operational Research · doi:10.1016/j.ejor.2012.03.004 · Cited by 637
Ouyang, L.-Y., Wu, K.-S., & Yang, C.-T. (2006) · Computers & Industrial Engineering · doi:10.1016/j.cie.2006.07.012 · Cited by 236
“…(1995), Khouja and Mehrez (1996), Hwang and Shinn (1997), Liao, Tsai, and Su (2000), Chang and Dye (2001), Ouyang, Chen, and Chuang (2002), Chang, Ouyang, and Teng (2003), Huang and Chung (2003), Shinn and Hwang (2003), Chang (2004), Shah (2004), Ouyang, Teng, and Chen (2005), and so…”
BackgroundSelf-citationCoordinating a two-level supply chain with delay in payments and profit sharing
Jaber, M. Y., & Osman, I. H. (2006) · Computers & Industrial Engineering · doi:10.1016/j.cie.2005.08.004 · Cited by 233
Tsao, Y.-C., & Sheen, G.-J. (2008) · Computers & Operations Research · doi:10.1016/j.cor.2007.01.024 · Cited by 201
“[29] and Chung and Liao [30] considered the deteriorating model under the condition of an order-size-dependent trade credit.”
BackgroundA century of evolution from Harris׳s basic lot size model: Survey and research agenda
Andriolo, A., Battini, D., Grubbström, R. W., Persona, A., & Sgarbossa, F. (2014) · International Journal of Production Economics · doi:10.1016/j.ijpe.2014.01.013 · Cited by 198
“If the order is less than this quantity, the purchaser must pay for the items received immediately (see Chang, Ouyang, and Teng (2003) or Chang (2004), Chung and Liao (2009), Mahata (2011, 2012)).”
Background
Metadata
- Authors
- Chang, C.-T., Ouyang, L.-Y., & Teng, J.-T.
- Venue
- Applied Mathematical Modelling
- Publisher
- Elsevier BV
- Published
- 2003-12
- Volume
- 27
- Issue
- 12
- Pages
- 983-996
- ISSN
- 0307-904X (ISSN-L)
- OpenAlex
- W2037411934
- Cited by
- 285
- References
- 16
- FWCI
- 11.90
- Type
- journal article
- Language
- en
- Open access
- bronze
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.