A comparative study of neural network and Box-Jenkins ARIMA modeling in time series prediction
The DOI matches its Crossref record; 8 of the 8 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Elman, J. L. (1990) · Cognitive Science · doi:10.1207/s15516709cog1402_1 · Cited by 11,212
Learning in Artificial Neural Networks: A Statistical Perspective
White, H. (1989) · Neural Computation · doi:10.1162/neco.1989.1.4.425 · Cited by 922
The use of ARIMA models for reliability forecasting and analysis
Ho, S. L., & Xie, M. (1998) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(98)00066-7 · Cited by 580
Self-citationSystem Reliability Theory: Models and Statistical Methods
Vangel, M. G., Høyland, A., Rausand, M., & Høyland, A. (1996) · Technometrics · doi:10.1080/00401706.1996.10484423 · Cited by 477
Neural Network Time Series: Forecasting of Financial Markets
Azoff, E. M. (1994) · Cited by 436
A comparison of artificial neural network and time series models for forecasting commodity prices
Kohzadi, N., Boyd, M. S., Kermanshahi, B., & Kaastra, I. (1996) · Neurocomputing · doi:10.1016/0925-2312(95)00020-8 · Cited by 293
Neural network time series forecasting of financial markets
Meade, N. (1995) · International Journal of Forecasting · doi:10.1016/s0169-2070(95)90005-5 · Cited by 278
System Reliability Theory-Models and Statistical Methods.
Sherwin, D. J., Høyland, A., & Rausand, M. (1995) · Journal of the Royal Statistical Society Series D (The Statistician) · doi:10.2307/2348906 · Cited by 259
Cited by
Anomaly Detection for IoT Time-Series Data: A Survey
Cook, A. A., Misirli, G., & Fan, Z. (2020) · IEEE Internet of Things Journal · doi:10.1109/jiot.2019.2958185 · Cited by 790
ARIMA forecasting of primary energy demand by fuel in Turkey
Ediger, V. Ş., & Akar, S. (2007) · Energy Policy · doi:10.1016/j.enpol.2006.05.009 · Cited by 622
Ayvaz, S., & Alpay, K. (2021) · Expert Systems with Applications · doi:10.1016/j.eswa.2021.114598 · Cited by 550
Electrical load forecasting models: A critical systematic review
Kuster, C., Rezgui, Y., & Mourshed, M. (2017) · Sustainable Cities and Society · doi:10.1016/j.scs.2017.08.009 · Cited by 536
Forecasting of demand using ARIMA model
Fattah, J., Ezzine, L., Aman, Z., El Moussami, H., & Lachhab, A. (2018) · International Journal of Engineering Business Management · doi:10.1177/1847979018808673 · Cited by 465
Autoregressive models in environmental forecasting time series: a theoretical and application review
Kaur, J., Parmar, K. S., & Singh, S. (2023) · Environmental Science and Pollution Research · doi:10.1007/s11356-023-25148-9 · Cited by 237
Computational Segmentation and Classification of Diabetic Glomerulosclerosis
Ginley, B., Lutnick, B., Jen, K.-Y., Fogo, A. B., Jain, S., Rosenberg, A., Walavalkar, V., Wilding, G., Tomaszewski, J. E., Yacoub, R., et al. (2019) · Journal of the American Society of Nephrology · doi:10.1681/asn.2018121259 · Cited by 204
Zou, H. F., Xia, G. P., Yang, F. T., & Wang, H. Y. (2007) · Neurocomputing · doi:10.1016/j.neucom.2007.01.009 · Cited by 197
Forecasting electricity load by a novel recurrent extreme learning machines approach
Ertugrul, Ö. F. (2016) · International Journal of Electrical Power & Energy Systems · doi:10.1016/j.ijepes.2015.12.006 · Cited by 196
Forecasting electricity consumption in Pakistan: the way forward
Hussain, A., Rahman, M., & Memon, J. A. (2016) · Energy Policy · doi:10.1016/j.enpol.2015.11.028 · Cited by 191
Software reliability forecasting by support vector machines with simulated annealing algorithms
Pai, P.-F., & Hong, W.-C. (2006) · Journal of Systems and Software · doi:10.1016/j.jss.2005.02.025 · Cited by 186
Forecasting systems reliability based on support vector regression with genetic algorithms
Chen, K.-Y. (2007) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2005.12.014 · Cited by 183
“[5] conducted a comparative analysis of neural networks and ARIMA techniques in terms of their ability to forecast repairable systems.”
BackgroundKhedr, A. M., Arif, I., P V, P. R., El‐Bannany, M., Alhashmi, S. M., & Sreedharan, M. (2021) · Intelligent Systems in Accounting, Finance and Management · doi:10.1002/isaf.1488 · Cited by 179
An ARIMA‐ANN Hybrid Model for Time Series Forecasting
Wang, L., Zou, H., Su, J., Li, L., & Chaudhry, S. (2013) · Systems Research and Behavioral Science · doi:10.1002/sres.2179 · Cited by 170
Short-Term Electric Load Forecasting Using Echo State Networks and PCA Decomposition
Bianchi, F. M., De Santis, E., Rizzi, A., & Sadeghian, A. (2015) · IEEE Access · doi:10.1109/access.2015.2485943 · Cited by 166
“to an ARIMA model using the standard notation ARIMA(p,d,q)× (P,D,Q)s, where the term (p,d,q) gives the order of the nonseasonal part, (P,D,Q) the order of the seasonal part, being s the value of the seasonality [23].”
MethodApplications and Comparisons of Four Time Series Models in Epidemiological Surveillance Data
Zhang, X., Zhang, T., Young, A. A., & Li, X. (2014) · PLoS ONE · doi:10.1371/journal.pone.0088075 · Cited by 159
Applications of Metaheuristics in Reservoir Computing Techniques: A Review
Bala, A., Ismail, I., Ibrahim, R., & Sait, S. M. (2018) · IEEE Access · doi:10.1109/access.2018.2873770 · Cited by 53
“[81] S. L. Ho, M. Xie, and T. N. Goh, ‘‘A comparative study of neural network and Box-Jenkins ARIMA modeling in time series prediction,’’ Comput.”
MethodInfluentialInter-data-center network traffic prediction with elephant flows
Li, Y., Liu, H., Yang, W., Hu, D., & Xu, W. (2016) · NOMS 2016 - 2016 IEEE/IFIP Network Operations and Management Symposium · doi:10.1109/noms.2016.7502814 · Cited by 34
Metadata
- Authors
- Ho, S. L., Xie, M., & Goh, T. N.
- Venue
- Computers & Industrial Engineering
- Publisher
- Elsevier BV
- Published
- 2002-04
- Volume
- 42
- Issue
- 2-4
- Pages
- 371-375
- ISSN
- 0360-8352 (ISSN-L)
- OpenAlex
- W1980462675
- Cited by
- 326
- References
- 8
- FWCI
- 22.24
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.