Disassembly of multiple product structures
The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Operations Planning Issues in an Assembly/Disassembly Environment
Brennan, L., Gupta, S. M., & Taleb, K. N. (1994) · International Journal of Operations & Production Management · doi:10.1108/01443579410066767 · Cited by 252
Self-citationGUPTA, S. M., & TALEB, K. N. (1994) · International Journal of Production Research · doi:10.1080/00207549408957046 · Cited by 227
Self-citationGupta, S. M., & McLean, C. R. (1996) · Computers & Industrial Engineering · doi:10.1016/0360-8352(96)00146-5 · Cited by 114
Self-citation
Cited by
Green supply-chain management: a state-of-the-art literature review
Srivastava, S. K. (2007) · International Journal of Management Reviews · doi:10.1111/j.1468-2370.2007.00202.x · Cited by 3,984
“…et al. (1996), Laperiere and ElMaraghy (1992), Lee et al. (1995), Moore et al. (1998, 2001), Scheuring et al. (1994), Seliger et al. (1994) and Taleb and Gupta (1997) discuss design for disassembly, whereas Gupta and Sharma (1995), He et al. (2004), Jahre (1995), Jayaraman et al. (1999),…”
BackgroundMethodInfluentialQuantitative models for reverse logistics: A review
Fleischmann, M., Bloemhof-Ruwaard, J. M., Dekker, R., van der Laan, E., van Nunen, J. A. E. E., & Van Wassenhove, L. N. (1997) · European Journal of Operational Research · doi:10.1016/s0377-2217(97)00230-0 · Cited by 1,902
Issues in environmentally conscious manufacturing and product recovery: a survey
Gungor, A., & Gupta, S. M. (1999) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(99)00167-9 · Cited by 1,107
Self-citationIlgin, M. A., & Gupta, S. M. (2010) · Journal of Environmental Management · doi:10.1016/j.jenvman.2009.09.037 · Cited by 1,015
Self-citationIntegrated Sustainable Life Cycle Design: A Review
Ramani, K., Ramanujan, D., Bernstein, W. Z., Zhao, F., Sutherland, J., Handwerker, C., Choi, J.-K., Kim, H., & Thurston, D. (2010) · Journal of Mechanical Design · doi:10.1115/1.4002308 · Cited by 469
Disassembly sequencing: A survey
Lambert, A. J. D. (2003) · International Journal of Production Research · doi:10.1080/0020754031000120078 · Cited by 382
A critical assessment of motives for product recovery: the case of engine remanufacturing
Seitz, M. A. (2007) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2006.05.029 · Cited by 320
Research challenges in municipal solid waste logistics management
Bing, X., Bloemhof, J. M., Ramos, T. R. P., Barbosa-Povoa, A. P., Wong, C. Y., & van der Vorst, J. G. A. J. (2016) · Waste Management · doi:10.1016/j.wasman.2015.11.025 · Cited by 227
“21 Disassembly is a systematic method of separating a product into its constituent parts, 22 components, subassemblies or other groupings (Taleb and Gupta 1997).”
MethodEvaluation of disassemblability to enable design for disassembly in mass production
Desai, A., & Mital, A. (2003) · International Journal of Industrial Ergonomics · doi:10.1016/s0169-8141(03)00067-2 · Cited by 224
Disassembly sequence planning for products with defective parts in product recovery
Gungor, A., & Gupta, S. M. (1998) · Computers & Industrial Engineering · doi:10.1016/s0360-8352(98)00047-3 · Cited by 176
“Further complicating matters is the presence of a high degree of uncertainty due to upgrading/downgrading of the product during its use by the customers and defects occurring either when in use or during disassembly.”
BackgroundSelf-citationTowards circular economy in production planning: Challenges and opportunities
Suzanne, E., Absi, N., & Borodin, V. (2020) · European Journal of Operational Research · doi:10.1016/j.ejor.2020.04.043 · Cited by 166
Metadata
- Authors
- Taleb, K. N., & Gupta, S. M.
- Venue
- Computers & Industrial Engineering
- Publisher
- Elsevier BV
- Published
- 1997-09
- Volume
- 32
- Issue
- 4
- Pages
- 949-961
- ISSN
- 0360-8352 (ISSN-L)
- OpenAlex
- W2060761960
- Cited by
- 158
- References
- 3
- FWCI
- 16.23
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.