Deterministic job-shop scheduling: Past, present and future
The DOI matches its Crossref record; 73 of the 73 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The complexity of theorem-proving procedures
Cook, S. A. (1971) · Proceedings of the third annual ACM symposium on Theory of computing - STOC '71 · doi:10.1145/800157.805047 · Cited by 6,385 · cited 2×
“Whereas if the problem complexity is of order Ο(y x ) then it is considered to be NP-Hard (if P ≠ NP) (Cook 1971; Garey et al. 1976).”
BackgroundOptimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Glover, F., & Laguna, M. (1997) · Cited by 5,679
Glover, F. (1990) · ORSA Journal on Computing · doi:10.1287/ijoc.2.1.4 · Cited by 5,647
Glover, F. (1989) · ORSA Journal on Computing · doi:10.1287/ijoc.1.3.190 · Cited by 5,106
Future paths for integer programming and links to artificial intelligence
Glover, F. (1986) · Computers & Operations Research · doi:10.1016/0305-0548(86)90048-1 · Cited by 4,181
Optimal two‐ and three‐stage production schedules with setup times included
Johnson, S. M. (1954) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800010110 · Cited by 3,252
Glover, F., & Laguna, M. (1997) · doi:10.1007/978-1-4615-6089-0 · Cited by 3,001 · cited 1×
“Such an approach is similar to the fan candidate list strategy in tabu search (Glover and Laguna 1997) which also allows a limited number of solutions to be searched in parallel.”
MethodSimulated annealing: theory and applications.
(1988) · Mathematics and Computers in Simulation · doi:10.1016/0378-4754(88)90023-7 · Cited by 2,966
Benchmarks for basic scheduling problems
Taillard, É. D. (1993) · European Journal of Operational Research · doi:10.1016/0377-2217(93)90182-m · Cited by 2,813
Cited by
Tay, J. C., & Ho, N. B. (2008) · Computers & Industrial Engineering · doi:10.1016/j.cie.2007.08.008 · Cited by 471
Surgical case scheduling as a generalized job shop scheduling problem
Pham, D.-N., & Klinkert, A. (2008) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.03.059 · Cited by 357
Zhang, R., & Chiong, R. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.09.097 · Cited by 344
Quantum annealing for industry applications: introduction and review
Yarkoni, S., Raponi, E., Bäck, T., & Schmitt, S. (2022) · Reports on Progress in Physics · doi:10.1088/1361-6633/ac8c54 · Cited by 341
Flexible Job-Shop Rescheduling for New Job Insertion by Using Discrete Jaya Algorithm
Gao, K., Yang, F., Zhou, M., Pan, Q., & Suganthan, P. N. (2019) · IEEE Transactions on Cybernetics · doi:10.1109/tcyb.2018.2817240 · Cited by 302
Ant colony optimization combined with taboo search for the job shop scheduling problem
Huang, K.-L., & Liao, C.-J. (2008) · Computers & Operations Research · doi:10.1016/j.cor.2006.07.003 · Cited by 278
An effective hybrid optimization strategy for job-shop scheduling problems
Wang, L., & Zheng, D.-Z. (2001) · Computers & Operations Research · doi:10.1016/s0305-0548(99)00137-9 · Cited by 277
An effective architecture for learning and evolving flexible job-shop schedules
Ho, N. B., Tay, J. C., & Lai, E. M.-K. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.04.007 · Cited by 216
Metadata
- Authors
- Jain, A. S., & Meeran, S.
- Venue
- European Journal of Operational Research
- Publisher
- Elsevier BV
- Published
- 1999-03
- Volume
- 113
- Issue
- 2
- Pages
- 390-434
- ISSN
- 0377-2217 (ISSN-L)
- OpenAlex
- W2076785727
- Cited by
- 782
- References
- 73
- FWCI
- 51.41
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.