Bridging the gap between planning and scheduling
The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Abstract
Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast, scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of AI planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Markov decision processes: Discrete stochastic dynamic programming
Hazeghi, K., & Puterman, M. L. (1995) · Journal of the American Statistical Association · doi:10.2307/2291177 · Cited by 8,037
Cited by
Handbook of Constraint Programming
(2006) · Foundations of Artificial Intelligence · doi:10.1016/s1574-6526(06)x8001-x · Cited by 1,483
A Concise Introduction to Models and Methods for Automated Planning
Geffner, H., & Bonet, B. (2013) · Synthesis lectures on artificial intelligence and machine learning · doi:10.2200/s00513ed1v01y201306aim022 · Cited by 225
VHPOP: Versatile Heuristic Partial Order Planner
Younes, H. L. S., & Simmons, R. G. (2003) · Journal of Artificial Intelligence Research · doi:10.1613/jair.1136 · Cited by 187
“We use the constraint-based interval approach to temporal POCL planning described by Smith et al. (2000), which in essence is the same approach as used by earlier temporal POCL planners such as DEVISER (Vere, 1983), ZENO (Penberthy & Weld, 1994), and IxTeT (Ghallab & Laruelle, 1994).”
MethodInteractive activity recognition and prompting to assist people with cognitive disabilities
Chu, Y., Chol Song, Y., Levinson, R., & Kautz, H. (2012) · Journal of Ambient Intelligence and Smart Environments · doi:10.3233/ais-2012-0168 · Cited by 47
“Following [31,34], the schedule is constructed and revised as necessary by an interactive constraint-based interval [35] planning system.”
Method
Metadata
- Authors
- SMITH, D. E., FRANK, J., & JÓNSSON, A. K.
- Venue
- The Knowledge Engineering Review
- Publisher
- Maximum Academic Press
- Published
- 2000-03
- Volume
- 15
- Issue
- 1
- Pages
- 47-83
- ISSN
- 0269-8889 (ISSN-L)
- 1469-8005
- OpenAlex
- W2130660558
- Cited by
- 248
- References
- 1
- FWCI
- 20.41
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Bridging the gap between planning and scheduling. https://app.cochat.ai/papers/10.1017/s0269888900001089
- The paper
- SMITH, D. E., FRANK, J., & JÓNSSON, A. K. (2000). Bridging the gap between planning and scheduling. The Knowledge Engineering Review. https://doi.org/10.1017/s0269888900001089
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.