Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 484

The DOI matches its Crossref record.

Economic Analysis of Integrated Continuous and Batch Pharmaceutical Manufacturing: A Case Study

Open access
Schaber, Spencer D., Gerogiorgis, Dimitrios I., Ramachandran, Rohit, Evans, James M. B., Barton, Paul I., Trout, Bernhardt L.·2011·Industrial & Engineering Chemistry Research

Abstract

The capital, operating, and overall costs of a dedicated continuous manufacturing process to synthesize an active pharmaceutical ingredient (API) and formulate it into tablets are estimated for a production scale of 2000 t of tablets per year, with raw material cost, production yield, and API loading varied over broad ranges. Costs are compared to batch production in a dedicated facility. Synthesis begins with a key organic intermediate three synthetic steps before the final API; results are given for key intermediate (KI) costs of $100 to $3000/kg, with drug loadings in the tablet of 10 and 50 wt %. The novel continuous process described here is being developed by an interdisciplinary team of 20 researchers. Since yields are not yet well-known, and continuous processes typically have better yields than batch ones, the overall yields of the continuous processes with recycling were set equal to that of the batch process. Without recycling, yields are 10% lower, but less equipment is required. The continuous process has not been built at large scale, so Wroth factors and other assumptions were used to estimate costs. Capital expenditures for continuous production were estimated to be 20 to 76% lower, depending on the drug loading, KI cost, and process chosen; operating expenditures were estimated to be between 40% lower and 9% higher. The novel continuous process with recycling coupled to a novel direct tablet formation process yields the best overall cost savings in each drug loading/KI price scenario: estimated savings range from 9 to 40%. Overall cost savings are also given assuming the yield in the continuous case is 10% above and 10% below that of the batch process. Even when yields in the continuous case are lower than in the batch case, savings can still be achieved because the labor, materials handling, CapEx, and other savings compensate.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1021/ie2006752

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 484

Metadata

Authors
Schaber, S. D., Gerogiorgis, D. I., Ramachandran, R., Evans, J. M. B., Barton, P. I., & Trout, B. L.
Venue
Industrial & Engineering Chemistry Research
Published
2011-08-02
Volume
50
Issue
17
Pages
10083-10092
ISSN
  • 0888-5885 (ISSN-L)
  • 1520-5045
OpenAlex
W1770883461
Cited by
484
References
0
FWCI
22.91
Type
journal article
Language
en
Open access
green

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Economic Analysis of Integrated Continuous and Batch Pharmaceutical Manufacturing: A Case Study. https://app.cochat.ai/papers/10.1021/ie2006752
The paper
Schaber, S. D., Gerogiorgis, D. I., Ramachandran, R., Evans, J. M. B., Barton, P. I., & Trout, B. L. (2011). Economic Analysis of Integrated Continuous and Batch Pharmaceutical Manufacturing: A Case Study. Industrial & Engineering Chemistry Research. https://doi.org/10.1021/ie2006752

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.