Student or educator? Sign up with your school email and get 6 months of Pro free.
CoChat
Cited by 164

The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.

Triangulation in construction management research*

Love, Peter E. D., Holt, Gary D., Li, Heng · 2002 · Engineering Construction and Architectural Management

Abstract

There has been considerable debate in the construction management (CM) literature as to which research methodology is the most appropriate to CM research problems. This paper contributes to that debate by suggesting that postmodernity and multi‐level research can extend the scope of CM theory. It is argued that if CM researchers are to effectively solve the problems that the construction industry faces, then they need to adopt a robust methodological approach that takes account of both ontological and epistemological viewpoints. It is proffered that only then will we fully understand phenomena that influence organizational and project performance in construction.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1046/j.1365-232x.2002.00226.x

Cites

3 of 3 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 3 references

Metadata

Authors
Love, P. E. D., Holt, G. D., & Li, H.
Venue
Engineering Construction and Architectural Management
Publisher
Emerald
Published
2002-08
Volume
9
Issue
4
Pages
294-303
ISSN
  • 0969-9988 (ISSN-L)
  • 1365-232X
OpenAlex
W2088798150
Cited by
164
References
3
FWCI
1.62
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Triangulation in construction management research*. https://app.cochat.ai/papers/10.1046/j.1365-232x.2002.00226.x
The paper
Love, P. E. D., Holt, G. D., & Li, H. (2002). Triangulation in construction management research*. Engineering Construction and Architectural Management. https://doi.org/10.1046/j.1365-232x.2002.00226.x

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.