Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 172

The DOI matches its Crossref record.

Optimisation of embedded generation sizing and siting by using a double trade-off method

Carpinelli, G., Celli, G., Mocci, S., Pilo, F., Russo, A. · 2005 · IEE Proceedings - Generation, Transmission and Distribution

Abstract

Distribution System Operators have the duty of managing the distribution system safely and efficiently. Distribution revenues are generally based on asset value but revenue systems based to some extent on network performance (e.g. on the level of losses or reliability) are becoming common in many countries. Thus the distribution planner has to maximise the profit of the investments for the system development and to improve the performance of the system as well. In many case the goals are conflicting and multiobjective planning criteria may be adopted to reduce network costs and investments and to maximise some specific performance (e.g. network reliability). Furthermore, with multiobjective programming the distribution planner has the possibility of choosing a trade-off solution in a set of acceptable solutions by applying criteria to minimise risks in uncertain scenarios. These features are particularly useful whether, according to the EU directive EU/2003/54, Embedded Generation (EG) and DSM are considered as possible planning alternatives to be compared with more traditional development actions in the search for the best solution to planning problems. In this context, a methodology is presented based on multiobjective programming and decision theory which helps the decision maker to find the best development plan for the system by using the EG as a development option and by explicitly managing risks and uncertainties. In particular, the proposed methodology solves the problem of maximising the network performance by optimising some power quality indicators, like voltage quality and harmonic distortion, and by minimising the network costs (e.g. energy losses or upgrade investments) with an optimised use of EG. For this reason, the problem of the optimal sizing and siting of EG has been reformulated as a constrained, multiobjective, and nondifferentiable optimisation problem. The main idea is to apply a double trade-off procedure: the first trade-off, by means of a multiobjective ɛ-constrained technique, allows a wide family of good EG siting and sizing solutions for all the scenarios considered (e.g. associated to a different set of wind speed at all the possible locations); the second one allows isolating the most robust solutions. In this way the planner is completely free to drive the optimisation in a certain direction without loosing objectivity and generality. Simulation results obtained by using the proposed procedure on a test system demonstrate that alternatives disregarded by the decision theory application can result the most interesting ones.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1049/ip-gtd:20045129

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 172

Metadata

Authors
Carpinelli, G., Celli, G., Mocci, S., Pilo, F., & Russo, A.
Venue
IEE Proceedings - Generation, Transmission and Distribution
Published
2005
Volume
152
Issue
4
Pages
503
ISSN
1350-2360 (ISSN-L)
OpenAlex
W2131901678
Cited by
172
References
0
FWCI
3.81
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Optimisation of embedded generation sizing and siting by using a double trade-off method. https://app.cochat.ai/papers/10.1049/ip-gtd:20045129
The paper
Carpinelli, G., Celli, G., Mocci, S., Pilo, F., & Russo, A. (2005). Optimisation of embedded generation sizing and siting by using a double trade-off method. IEE Proceedings - Generation, Transmission and Distribution. https://doi.org/10.1049/ip-gtd%3A20045129

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.