The DOI matches its Crossref record.
Process of Innovation in Construction Firm
Abstract
Changing needs of owners, changing designs of constructed facilities, and increased foreign competition for domestic construction markets provide new incentives for advanced construction technology. This paper describes a process for innovation in the construction firm, based on an investigation of several new construction methods. This process includes recognizing forces and opportunities for innovation, creating a climate for innovation, developing the necessary capabilities, providing new construction technologies, experimenting and refining, and implementing. The paper also develops practical applications to assist industry professionals attempting to increase innovation within their firms and implications to structure further investigations of construction innovation.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Models of Construction Innovation
Slaughter, E. S. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:3(226 · Cited by 549
The drivers for contractors’ green innovation: an industry perspective
Qi, G. Y., Shen, L. Y., Zeng, S. X., & Jorge, O. J. (2010) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2010.04.017 · Cited by 468
Egbu, C. O. (2004) · Engineering, Construction and Architectural Management · doi:10.1108/09699980410558494 · Cited by 331
Matinaro, V., & Liu, Y. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.10.151 · Cited by 96
Metadata
- Authors
- Tatum, C. B.
- Venue
- Journal of Construction Engineering and Management
- Published
- 1987-12
- Volume
- 113
- Issue
- 4
- Pages
- 648-663
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(1987)113:4(648
- OpenAlex
- W2072241896
- Cited by
- 174
- References
- 0
- FWCI
- 4.75
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Process of Innovation in Construction Firm. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(1987)113:4(648
- The paper
- Tatum, C. B. (1987). Process of Innovation in Construction Firm. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(1987)113%3A4(648
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.