CoChat

Case-Based Reasoning Approach in Bid Decision Making

Chua, D. K. H., Li, D. Z., Chan, W. T. · 2001 · Journal of Construction Engineering and Management
DOI 10.1061/(asce)0733-9364(2001)127:1(35
Cited by 166

The DOI matches its Crossref record; 11 of the 11 references it cites were found in a registry or an index.

Abstract

Since contractors' bidding behaviors are affected by numerous factors related both to the specific features of the project and dynamically changed situations, bidding decision problems are highly unstructured. No clear rules can be found in delivering a bidding decision. In this problem domain, decisions are commonly made based upon intuition and past experience. Case-based reasoning (CBR) is a subbranch of artificial intelligence. It solves new problems by matching against similar problems that have been encountered and resolved in the past. It is a useful tool in dealing with complex and unstructured problems, which are difficult if not impossible to be theoretically modeled. This paper presents a case-based reasoning bidding system that helps contractors with the dynamic information varying with the specific features of the job and the new situation. In this system, bid cases are represented by sets of attributes derived from a preliminary survey of several experienced bidders, focusing, respectively, on two reasoning subgoals: (1) Risk; and (2) competition. Through the system, similar cases can be retrieved to assess the possible level of competition and risk margin. A hypothetical example is explained and evaluated to demonstrate the feasibility of the method. The effectiveness of this system is tested by a Monte Carlo simulation in comparison to the conventional statistical method.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)0733-9364(2001)127:1(35)

Cites

11 of 11 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 11 references

Cited by

See all 166

Metadata

Authors
Chua, D. K. H., Li, D. Z., & Chan, W. T.
Venue
Journal of Construction Engineering and Management
Published
2001-02
Volume
127
Issue
1
Pages
35-45
ISSN
  • 0733-9364 (ISSN-L)
  • 1943-7862
DOI
10.1061/(asce)0733-9364(2001)127:1(35
OpenAlex
W2056704258
Cited by
166
References
11
FWCI
3.38
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Case-Based Reasoning Approach in Bid Decision Making. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2001)127:1(35
The paper
Chua, D. K. H., Li, D. Z., & Chan, W. T. (2001). Case-Based Reasoning Approach in Bid Decision Making. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2001)127%3A1(35

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.