The DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Time-Cost-Quality Trade-Off Analysis for Highway Construction
Abstract
Many departments of transportation have recently started to utilize innovative contracting methods that provide new incentives for improving construction quality. These emerging contracts place an increasing pressure on decision makers in the construction industry to search for an optimal resource utilization plan that minimizes construction cost and time while maximizing its quality. This paper presents a multiobjective optimization model that supports decision makers in performing this challenging task. The model is designed to transform the traditional two-dimensional time-cost tradeoff analysis to an advanced three-dimensional time-cost-quality trade-off analysis. The model is developed as a multiobjective genetic algorithm to provide the capability of quantifying and considering quality in construction optimization. An application example is analyzed to illustrate the use of the model and demonstrate its capabilities in generating and visualizing optimal tradeoffs among construction time, cost, and quality.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A fast and elitist multiobjective genetic algorithm: NSGA-II
Deb, K., Pratap, A., Agarwal, S., & Meyarivan, T. (2002) · IEEE Transactions on Evolutionary Computation · doi:10.1109/4235.996017 · Cited by 50,053
Genetic algorithms in search, optimization, and machine learning
(1989) · Choice Reviews Online · doi:10.5860/choice.27-0936 · Cited by 49,010
Genetic Algorithms in Search, Optimization and Machine Learning
Goldberg, D. E., & Robson, D. (1988) · Cited by 18,391
Multi-Objective Optimization Using Evolutionary Algorithms
Deb, K., & Kalyanmoy, D. (2001) · Andalas University Repository (Andalas University) · Cited by 17,324
A Fast Elitist Non-dominated Sorting Genetic Algorithm for Multi-objective Optimization: NSGA-II
Deb, K., Agrawal, S., Pratap, A., & Meyarivan, T. (2000) · Lecture Notes in Computer Science · doi:10.1007/3-540-45356-3_83 · Cited by 5,289
SPEA2: Improving the strength pareto evolutionary algorithm
Zitzler, E., Laumanns, M., & Thiele, L. (2001) · doi:10.3929/ethz-a-004284029 · Cited by 5,008
Multiobjective optimization using evolutionary algorithms
Sbalzarini, I. F., Mullery, S., & Koumoutsakosyz, P. (2000) · Cited by 920
Metadata
- Authors
- El-Rayes, K., & Kandil, A.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2005-04
- Volume
- 131
- Issue
- 4
- Pages
- 477-486
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2005)131:4(477
- OpenAlex
- W2104262644
- Cited by
- 361
- References
- 7
- FWCI
- 10.99
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Time-Cost-Quality Trade-Off Analysis for Highway Construction. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2005)131:4(477
- The paper
- El-Rayes, K., & Kandil, A. (2005). Time-Cost-Quality Trade-Off Analysis for Highway Construction. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2005)131%3A4(477
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.