Safety Hazard Identification on Construction Projects
The DOI matches its Crossref record; 6 of the 6 references it cites were found in a registry or an index.
Abstract
Hazard identification is fundamental to construction safety management; unidentified hazards present the most unmanageable risks. This paper presents an investigation indicating the current levels of hazard identification on three U.K. construction projects. A maximum of only 6.7% of the method statements analyzed on these projects managed to identify all of the hazards that should have been identified, based upon current knowledge. Maximum hazard identification levels were found to be 0.899 (89.9%) for a construction project within the nuclear industry, 0.728 (72.8%) for a project within the railway industry, and 0.665 (66.5%) for a project within both the railway and general construction industry sector. The results indicate that hazard identification levels are far from ideal. A discussion on the reasons for low hazard identification levels indicates key barriers. This leads to the presentation of an Information Technology (IT) tool for construction project safety management (Total-Safety) and, in particular, a module within Total-Safety designed to help construction personnel develop method statements with improved levels of hazard identification.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1976) · Cited by 10,423
Simulation modelling and analysis
(1983) · Information Processing & Management · doi:10.1016/0306-4573(83)90077-8 · Cited by 751
Verification of Computer Simulation Models
Naylor, T. H., & Finger, J. M. (1967) · Management Science · doi:10.1287/mnsc.14.2.b92 · Cited by 421
Identifying Root Causes of Construction Injuries
Hinze, J., Pedersen, C., & Fredley, J. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:1(67 · Cited by 193
Behavior-based safety management in Hong Kong's construction industry
Lingard, H., & Rowlinson, S. (1997) · Journal of Safety Research · doi:10.1016/s0022-4375(97)00010-8 · Cited by 188
The Nature of Struck-by Accidents
Hinze, J., Huang, X., & Terry, L. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:2(262 · Cited by 158
Cited by
Hazard recognition and risk perception in construction
Perlman, A., Sacks, R., & Barak, R. (2014) · Safety Science · doi:10.1016/j.ssci.2013.11.019 · Cited by 410
A review of risk management through BIM and BIM-related technologies
Zou, Y., Kiviniemi, A., & Jones, S. W. (2017) · Safety Science · doi:10.1016/j.ssci.2015.12.027 · Cited by 373
Visualization technology-based construction safety management: A review
Guo, H., Yu, Y., & Skitmore, M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2016.10.004 · Cited by 363
Application of machine learning to construction injury prediction
Tixier, A. J.-P., Hallowell, M. R., Rajagopalan, B., & Bowman, D. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.05.016 · Cited by 350
Construction safety and digital design: A review
Zhou, W., Whyte, J., & Sacks, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.07.005 · Cited by 303
Metadata
- Authors
- Carter, G., & Smith, S. D.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2006-02
- Volume
- 132
- Issue
- 2
- Pages
- 197-205
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2006)132:2(197
- OpenAlex
- W2120197519
- Cited by
- 477
- References
- 6
- FWCI
- 14.97
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.