Student or educator? Sign up with your school email and get 6 months of Pro free.
CoChat
Cited by 186

The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.

Improving Employees’ Work-Life Balance in the Construction Industry: Project Alliance Case Study

Lingard, Helen, Brown, Kerry, Bradley, Lisa, Bailey, Caroline, Townsend, Keith · 2007 · Journal of Construction Engineering and Management
DOI 10.1061/(asce)0733-9364(2007)133:10(807

Abstract

Work-life conflict has a damaging effect on job satisfaction, organizational commitment, productivity turnover, and absenteeism. On an individual level, work-life conflict is associated with employee burnout, mental health issues, substance abuse, and diminished family functioning. Thus, work-life balance is an important issue to the construction industry, in terms of both organizational effectiveness and occupational health. Long and inflexible work hours are the most consistent predictor of work-life conflict among construction employees, particularly those working on-site or in a project office. There is considerable resistance to the adoption of new ways of scheduling work within the industry. This paper describes the post hoc evaluation of a compressed work week (reducing the length of the working week, but increasing the length of the working day) in a case study project alliance in Queensland, Australia. Quantitative and qualitative data are presented to demonstrate the beneficial impact of the initiative on employees’ work-life balance. The evaluation provides prima facie evidence that alternative work schedules can improve construction employees’ work-life balance, creating benefits for construction employees and organizations. The paper concludes that project alliances provide an ideal environment in which work-life balance initiatives can help to create high-performance work systems in the construction sector.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1061/(asce)0733-9364(2007)133:10(807)

Cites

2 of 2 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 2 references

Cited by

See all 186

Metadata

Authors
Lingard, H., Brown, K., Bradley, L., Bailey, C., & Townsend, K.
Venue
Journal of Construction Engineering and Management
Published
2007-10
Volume
133
Issue
10
Pages
807-815
ISSN
  • 0733-9364 (ISSN-L)
  • 1943-7862
DOI
10.1061/(asce)0733-9364(2007)133:10(807
OpenAlex
W2017308467
Cited by
186
References
2
FWCI
22.58
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Improving Employees’ Work-Life Balance in the Construction Industry: Project Alliance Case Study. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2007)133:10(807
The paper
Lingard, H., Brown, K., Bradley, L., Bailey, C., & Townsend, K. (2007). Improving Employees’ Work-Life Balance in the Construction Industry: Project Alliance Case Study. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2007)133%3A10(807

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.