Areas of Application for 3D and 4D Models on Construction Projects
Abstract
In recent years more and more construction projects used three-dimensional/four-dimensional (3D/4D) models to support management tasks. However, project managers still struggle with evaluating how the 3D/4D model technology can be most efficiently applied on their specific project. One main reason for this struggle is that an account about how 3D/4D models have been used in the past is missing. This paper offers practitioners and researchers such an account of the application areas of 3D/4D model technologies including the purposes for which these technologies have been applied. The paper qualitatively aggregates the results of 26 case studies of 3D/4D model applications on construction projects to show researchers and practitioners how 3D/4D models have been applied to address project challenges. Using a “project challenge—3D/4D model application” matrix the paper explains each application area and describes why the application has been beneficial to the case study projects. The paper then analyzes the challenges that practitioners have faced with 3D/4D models on the test case projects. The main findings of this analysis are that practitioners on most of the test case projects have used the models for only one application area. The paper suggests that further research on the integration of 3D/4D model technologies into work and business processes of project teams is needed to address this opportunity for a more widespread use of 3D/4D models throughout the lifecycle of a project.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
Case study research: design and methods
Phelan, S. (2011) · Evaluation & Research in Education · doi:10.1080/09500790.2011.582317 · Cited by 21,763
Building Theories from Case Study Research
Eisenhardt, K. M. (1989) · The Academy of Management Review · doi:10.2307/258557 · Cited by 17,455
Organizations in Action: Social Science Bases of Administrative Theory.
Udy, S. H., & Thompson, J. D. (1968) · American Sociological Review · doi:10.2307/2092248 · Cited by 4,134
The construction industry as a loosely coupled system: implications for productivity and innovation
Dubois, A., & Gadde, L.-E. (2002) · Construction Management and Economics · doi:10.1080/01446190210163543 · Cited by 1,041
Feasibility Study of 4D CAD in Commercial Construction
Koo, B., & Fischer, M. A. (2000) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2000)126:4(251 · Cited by 485
Self-citationThe Strategic Management of Large Engineering Projects: Shaping Institutions, Risks, and Governance
Miller, R. L., & Lessard, D. R. (2001) · Cited by 459
Building simulation: an overview of developments and information sources
Hong, T., Chou, S. K., & Bong, T. Y. (2000) · Building and Environment · doi:10.1016/s0360-1323(99)00023-2 · Cited by 303
Parametric 3D modeling in building construction with examples from precast concrete
Sacks, R., Eastman, C. M., & Lee, G. (2004) · Automation in Construction · doi:10.1016/s0926-5805(03)00043-8 · Cited by 241
Formalization and Automation of Time-Space Conflict Analysis
Akinci, B., Fischen, M., Levitt, R. E., & Carlson, R. (2002) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2002)16:2(124 · Cited by 194
Cited by
Understanding effects of BIM on collaborative design and construction: An empirical study in China
Liu, Y., van Nederveen, S., & Hertogh, M. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.06.007 · Cited by 411
Shen, W., Hao, Q., Mak, H., Neelamkavil, J., Xie, H., Dickinson, J., Thomas, R., Pardasani, A., & Xue, H. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2009.09.001 · Cited by 380
A review of risk management through BIM and BIM-related technologies
Zou, Y., Kiviniemi, A., & Jones, S. W. (2017) · Safety Science · doi:10.1016/j.ssci.2015.12.027 · Cited by 373
Ding, L., Zhou, Y., & Akinci, B. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.009 · Cited by 330
Practices and effectiveness of building information modelling in construction projects in China
Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T., & Zhang, W. (2015) · Automation in Construction · doi:10.1016/j.autcon.2014.10.014 · Cited by 266
Metadata
- Authors
- Hartmann, T., Gao, J., & Fischer, M.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2008-10
- Volume
- 134
- Issue
- 10
- Pages
- 776-785
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2008)134:10(776
- OpenAlex
- W2031336686
- Cited by
- 300
- References
- 26
- FWCI
- 30.52
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Areas of Application for 3D and 4D Models on Construction Projects. https://app.cochat.ai/papers/10.1061/(asce)0733-9364(2008)134:10(776
- The paper
- Hartmann, T., Gao, J., & Fischer, M. (2008). Areas of Application for 3D and 4D Models on Construction Projects. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)0733-9364(2008)134%3A10(776
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.