Spatial and Temporal Exposure to Safety Hazards in Construction
The DOI matches its Crossref record; 11 of the 11 references it cites were found in a registry or an index.
Abstract
Given the dynamic nature of construction sites, analysis of construction activities and their related hazards is inadequate for reliable risk assessment if it does not explicitly account for the likelihood of exposure of potential victims to hazardous situations. In traditional risk level calculations for manufacturing industries, the number of victims is factored with the likelihood of an accident and the potential severity, but the victims are simply assumed to be those typically present at the accident location. In construction, exposure cannot be accounted for at a generic metaproject level: it must be assessed at the level of the activities and the physical context in which they are performed. Conceptually, accidents are “loss-of-control events” to which victims are exposed; without exposure, no accident is assumed to occur. A set of algorithms has been developed to demonstrate estimation of the likelihood of exposure of construction workers to loss-of-control events. The algorithms have been implemented in a prototype software application designed to predict fluctuating risk levels in construction projects. The software implements the “construction hazard assessment with spatial and temporal exposure” model for managing safety in construction, which empowers planners at all levels to adjust construction plans to mitigate high levels of risk or to undertake appropriate proactive measures to ensure safety when high risk levels are unavoidable.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL
Ballard, H. G. (2000) · University of Birmingham Institutional Research Archive (University of Birmingham) · Cited by 2,057
A Guide To Task Analysis: The Task Analysis Working Group
Kirwan, B., & Ainsworth, L. (1992) · Medical Entomology and Zoology · Cited by 919
Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008) · Wiley eBooks · doi:10.1002/9780470261309 · Cited by 889
Self-citationA Guide To Task Analysis: The Task Analysis Working Group
(1992) · CRC Press eBooks · doi:10.1201/b16826 · Cited by 677
Identifying elements of poor construction safety management in China
Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004) · Safety Science · doi:10.1016/j.ssci.2003.09.001 · Cited by 590
Analysis of Construction Worker Fall Accidents
Huang, X., & Hinze, J. (2003) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2003)129:3(262 · Cited by 405
Systems Model of Construction Accident Causation
Mitropoulos, P., Abdelhamid, T. S., & Howell, G. A. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:7(816 · Cited by 336
ILO Encyclopaedia of Occupational Health and Safety
James, P. (2005) · Occupational Medicine · doi:10.1093/occmed/kqi077 · Cited by 69
Gyi, D. E., Gibb, A., & Haslam, R. A. (1999) · Construction Management and Economics · doi:10.1080/014461999371691 · Cited by 58
Fatalities and injuries in the Kuwaiti construction industry
Kartam, N. A., & Bouz, R. G. (1998) · Accident Analysis & Prevention · doi:10.1016/s0001-4575(98)00033-5 · Cited by 55
(2003) · doi:10.1061/(asce)0733-9364(2003)129:5(492
Cited by
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
A critical review of virtual and augmented reality (VR/AR) applications in construction safety
Li, X., Yi, W., Chi, H.-L., Wang, X., & Chan, A. P. C. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.11.003 · Cited by 1,055
Teizer, J., Allread, B. S., Fullerton, C. E., & Hinze, J. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.02.009 · Cited by 456
Hazard recognition and risk perception in construction
Perlman, A., Sacks, R., & Barak, R. (2014) · Safety Science · doi:10.1016/j.ssci.2013.11.019 · Cited by 410
Self-citationZhang, S., Boukamp, F., & Teizer, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.02.005 · Cited by 392
Metadata
- Authors
- Sacks, R., Rozenfeld, O., & Rosenfeld, Y.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2009-08
- Volume
- 135
- Issue
- 8
- Pages
- 726-736
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- DOI
- 10.1061/(asce)0733-9364(2009)135:8(726
- OpenAlex
- W2043425450
- Cited by
- 167
- References
- 11
- FWCI
- 15.31
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.