Valuing Simple Multiple-Exercise Real Options in Infrastructure Projects
The DOI matches its Crossref record; 22 of the 22 references it cites were found in a registry or an index.
Abstract
The revenue risk is considerable in infrastructure project financing arrangements such as build–operate–transfer (BOT). A potential mitigation strategy for the revenue risk is a governmental revenue guarantee, where the government secures a minimum amount of revenue for a project. Such a guarantee is: (1) only redeemable at distinct points in time; and (2) more economical if the government limits the guarantee’s availability to the early portions of a BOT’s concession period. Hence, a guarantee characterized by this type of structure takes the form of either a Bermudan or a simple multiple-exercise real option, depending upon the number of exercise opportunities afforded. The multi-least-squares Monte Carlo technique is presented and illustrated as a promising approach to determine the fair value of this variety of real option. This method is far more flexible than prevailing approaches, so it represents an important step toward improving risk mitigation and facilitating contractual and financial negotiations in BOT projects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The pricing of options and corporate liabilities
Black, F., & Scholes, M. (1973) · Journal of Political Economy · doi:10.1086/260062 · Cited by 29,074 · cited 1×
“The foundation for financial option theory was established in 1900 by the French mathematician Louis Bachelier, and this field matured in the 1970s thanks to the seminal Nobel Prize research by Merton, Black, and Scholes Merton 1973; Black and Scholes 1973 .”
MethodDeterminants of corporate borrowing
Myers, S. C. (1977) · Journal of Financial Economics · doi:10.1016/0304-405x(77)90015-0 · Cited by 13,169 · cited 1×
“Alternatively, real option theory is a relatively recent development and Myers 1977, who first coined the term “real option,” is credited for its initiation.”
BackgroundSchwartz, E. S., Dixit, A. K., & Pindyck, R. S. (1994) · The Journal of Finance · doi:10.2307/2329279 · Cited by 9,498 · cited 1×
“Over the years, other researchers have significantly contributed to expand real option theory Dixit and Pindyck 1994; Trigeorgis 1996; Amram and Kulatilaka 1999; Copeland and Antikarov 2001 .”
BackgroundDixit, R. K., & Pindyck, R. S. (1994) · doi:10.1515/9781400830176 · Cited by 9,029
Theory of Rational Option Pricing
Merton, R. C. (2019) · World Scientific Reference on Contingent Claims Analysis in Corporate Finance · doi:10.1142/9789814759588_0002 · Cited by 7,948
Theory of rational option pricing
Merton, R. C. (2005) · Theory of Valuation · doi:10.1142/9789812701022_0008 · Cited by 7,161
Valuing American Options by Simulation: A Simple Least-Squares Approach
Longstaff, F. A., & Schwartz, E. S. (2001) · Review of Financial Studies · doi:10.1093/rfs/14.1.113 · Cited by 3,216 · cited 4×
“Xjknown underlying variable at time t= tj. The continuation value in Eq. 9 can be approximated by adopting the leastsquares regression approach of Longstaff and Schwartz 2001 .”
BackgroundMethodInfluentialReal Options: Managerial Flexibility and Strategy in Resource Allocation
Trigeorgis, L. G. (1996) · Cited by 2,224
Real Options: A Practitioner's Guide
Copeland, T. E., & Antikarov, V. (2001) · Cited by 1,393
Real options: Managerial flexibility and strategy in resource allocation
Davis, G. A. (1996) · Resources Policy · doi:10.1016/s0301-4207(97)84900-8 · Cited by 1,241
Real options: managing strategic investment in an uncertain world
(1999) · Choice Reviews Online · doi:10.5860/choice.36-5767 · Cited by 1,102
Pricing American-style securities using simulation
Broadie, M. N., & Glasserman, P. (1997) · Journal of Economic Dynamics and Control · doi:10.1016/s0165-1889(97)00029-8 · Cited by 638 · cited 1×
“In the last 10 years, several researchers have successfully combined different dynamic programming techniques with Monte Carlo simulation to value financial Bermudan options: Broadie and Glasserman 1997, Andersen 2000, and Longstaff and Schwartz 2001.”
BackgroundFriedl, G. (2002) · Schmalenbach Business Review · doi:10.1007/bf03396652 · Cited by 376
Valuation of Commodity-Based Swing Options
Jaillet, P., Ronn, E. I., & Tompaidis, S. (2004) · Management Science · doi:10.1287/mnsc.1040.0240 · Cited by 323
Real Options by Spreadsheet: Parking Garage Case Example
de Neufville, R., Scholtes, S., & Wang, T. (2006) · Journal of Infrastructure Systems · doi:10.1061/(asce)1076-0342(2006)12:2(107 · Cited by 240
Ho, S. P., & Liu, L. Y. (2002) · Construction Management and Economics · doi:10.1080/01446190110110533 · Cited by 176
A real options approach to valuing strategic flexibility in uncertain construction projects
Ford, D. N., Lander, D. M., & Voyer, J. J. (2002) · Construction Management and Economics · doi:10.1080/01446190210125572 · Cited by 147 · cited 1×
“Several authors have investigated the use of real option analysis in infrastructure problems: Ford et al. 2002 in strategic planning of a toll road project; Ho and Liu 2002 in evaluating A/E/C technology investments; Garvin and Cheah 2004 in infrastructure investment decisions; Zhao et al. 2004 in highway development;…”
BackgroundValuing Flexibility in Infrastructure Expansion
Zhao, T., & Tseng, C. (2003) · Journal of Infrastructure Systems · doi:10.1061/(asce)1076-0342(2003)9:3(89 · Cited by 130
Real Options Valuation: A Monte Carlo ApproachPreprint
Gamba, A. (2002) · SSRN Electronic Journal · doi:10.2139/ssrn.302613 · Cited by 107
Dailami, M. A., Lipkovich, I. A., & Dyck, V. J. (1999) · World Bank policy research working paper · doi:10.1596/1813-9450-2083 · Cited by 81 · cited 2×
“In this type of setting, the modeler may use either a discrete-time one-factor model Irwin 2003 or a discrete-time multifactor model Dailami et al. 1999 .”
MethodImproved Techniques for Valuing Large-Scale Projects
Esty, B. C. (1999) · The Journal of Structured Finance · doi:10.3905/jsf.1999.320177 · Cited by 71 · cited 1×
“A simplified cash flow model Esty 1999 to determine the project’s annual net revenue available to the sponsors, i.e., annual equity cash flow ECF ,i s given by”
MethodPublic Money for Private Infrastructure
Irwin, T. (2003) · World Bank working paper · doi:10.1596/0-8213-5556-2 · Cited by 58
Cited by
A review of emerging trends in global PPP research: analysis and visualization
Song, J., Zhang, H., & Dong, W. (2016) · Scientometrics · doi:10.1007/s11192-016-1918-1 · Cited by 323
Flexible contracts to cope with uncertainty in public–private partnerships
Cruz, C. O., & Marques, R. C. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.09.006 · Cited by 242
“Nevertheless, this has also been seen regarding the risk sharing between the two agents, and not so much concerning the value maximisation of the project (Chiara et al., 2007; Grimsey and Lewis, 2002; Lonsdale, 2005; Meda, 2007).”
Background
Metadata
- Authors
- Chiara, N., Garvin, M. J., & Vecer, J.
- Venue
- Journal of Infrastructure Systems
- Published
- 2007-06
- Volume
- 13
- Issue
- 2
- Pages
- 97-104
- ISSN
- 1076-0342 (ISSN-L)
- 1943-555X
- DOI
- 10.1061/(asce)1076-0342(2007)13:2(97
- OpenAlex
- W2167566239
- Cited by
- 168
- References
- 22
- FWCI
- 8.86
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.