Developing a Fuzzy Risk Allocation Model for PPP Projects in China
Abstract
Equitable allocation of risks between the government and the private sector in concession agreement is essential to the success of public-private partnership (PPP) projects. The decision-making process, based on the established risk allocation principles expressed in linguistic terms, requires qualitative judgment and experiential knowledge of construction experts. However, it is subjective, partial, and implicit in actual application. This paper aims to develop a fuzzy synthetic evaluation model for determining an equitable risk allocation between the government and the private sector. By doing so, it assists the PPP project practitioners to transform the risk allocation principles in linguistic terms into a more usable and systematic quantitative-based analysis using fuzzy set. Twenty-three principles and influencing factors for risk allocation were identified through a comprehensive literature review. Nine critical risk allocation criteria (RACs) that evaluate the risk carrying capability of project participants were further identified, validated, and compiled based on the experts’ knowledge via face-to-face interviews. On the other hand, the weighting for each critical risk allocation criterion was determined through a two-round Delphi questionnaire survey. A set of knowledge-based fuzzy inference rules was then established to set up the membership function for the nine RACs. Based on the research findings, a fuzzy synthetic evaluation model was finally established to determine an equitable risk allocation between the government and the private sector.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach
Xu, Y., Yeung, J. F. Y., Chan, A. P. C., Chan, D. W. M., Wang, S. Q., & Ke, Y. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.06.006 · Cited by 428
Self-citationA review of emerging trends in global PPP research: analysis and visualization
Song, J., Zhang, H., & Dong, W. (2016) · Scientometrics · doi:10.1007/s11192-016-1918-1 · Cited by 323
AMEYAW, E. E., HU, Y., SHAN, M., CHAN, A. P. C., & LE, Y. (2016) · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT · doi:10.3846/13923730.2014.945953 · Cited by 307
Self-citationA fuzzy synthetic evaluation approach for risk assessment: a case of Singapore's green projects
Zhao, X., Hwang, B.-G., & Gao, Y. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.11.042 · Cited by 279
Ameyaw, E. E., & Chan, A. P. C. (2015) · Expert Systems with Applications · doi:10.1016/j.eswa.2015.02.041 · Cited by 265
Self-citation
Metadata
- Authors
- Xu, Y., Chan, A. P. C., & Yeung, J. F. Y.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2010-08
- Volume
- 136
- Issue
- 8
- Pages
- 894-903
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W1976723257
- Cited by
- 195
- References
- 0
- FWCI
- 19.67
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Developing a Fuzzy Risk Allocation Model for PPP Projects in China. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000189
- The paper
- Xu, Y., Chan, A. P. C., & Yeung, J. F. Y. (2010). Developing a Fuzzy Risk Allocation Model for PPP Projects in China. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000189
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.