Data Mining Framework to Optimize the Bid Selection Policy for Competitively Bid Highway Construction Projects
The DOI matches its Crossref record.
Abstract
In competitive bidding in the United States, the lowest bid is frequently selected to perform the project. However, the lowest bidder may incur significant cost increases through change orders. For project owners to accurately estimate the actual project cost and to predict the bid that is close to the actual project cost, there is a need for new decision aids to analyze the bid patterns. In this paper, two neural network models, a classification model and a general regression model, were used as a method of selecting the bidder that submits the bid closest to the actual project cost. The empirical results suggest that for selected projects these models selected the bids that are closer to the actual project costs than the lowest bid. The outcome of this study addresses the issue of cost overrun, which is a very common problem in the construction industry.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Safety leading indicators for construction sites: A machine learning approach
Poh, C. Q. X., Ubeynarayana, C. U., & Goh, Y. M. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.022 · Cited by 290
Data mining in the construction industry: Present status, opportunities, and future trends
Yan, H., Yang, N., Peng, Y., & Ren, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103331 · Cited by 161
Ashtari, M. A., Ansari, R., Hassannayebi, E., & Jeong, J. (2022) · Buildings · doi:10.3390/buildings12101660 · Cited by 65
Ghazal, M. M., & Hammad, A. (2022) · International Journal of Construction Management · doi:10.1080/15623599.2020.1738205 · Cited by 52
“For instance, the model from Art Chaovalitwongse et al. (2012) included bid selection policy, while the prediction model of Lee et al. (2011) included Project Definition Rating Index (PDRI).”
MethodInfluential
Metadata
- Authors
- Art Chaovalitwongse, W., Wang, W., Williams, T. P., & Chaovalitwongse, P.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2012-02
- Volume
- 138
- Issue
- 2
- Pages
- 277-286
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W1995713532
- Cited by
- 38
- References
- 0
- FWCI
- 1.30
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Data Mining Framework to Optimize the Bid Selection Policy for Competitively Bid Highway Construction Projects. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000386
- The paper
- Art Chaovalitwongse, W., Wang, W., Williams, T. P., & Chaovalitwongse, P. (2012). Data Mining Framework to Optimize the Bid Selection Policy for Competitively Bid Highway Construction Projects. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000386
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.