Interweaving Trust and Communication with Project Performance
The DOI matches its Crossref record; 6 of the 6 references it cites were found in a registry or an index.
Abstract
Project performance is always one of the key concerns of construction project managers. It is often regarded as the critical indicator to measure the success of construction organization. This paper further advances existing knowledge on the achievement of project performance by investigating its relationship with trust and communication. Specifically, the mediating role of communication is studied to detect any direct and/or indirect effect of communication on this relationship. An analytical approach of mediation analysis was performed to achieve this objective. Five significant mediation models were identified. These models demonstrate that trust affects communication and in so doing influences project performance. Specifically, effective information flow is the versatile mediator to the trust-project performance relationships among all of these significant models. This implies that the improvement of information flow would likely improve project performance (i.e., achieve satisfactory and worthwhile quality, maximize project time, cost, and quality). In this context, the findings point to the need for managers to direct efforts or resources to effectively manage information flow as part of the project management system. This paper contributes to research in communication in construction with respect to articulating its mediator role in the trust-performance relationship. The linking of communication with trust and performance extends the study of communication beyond the conventional premises of pattern and means.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Baron, R. M., & Kenny, D. A. (1986) · Journal of Personality and Social Psychology · doi:10.1037/0022-3514.51.6.1173 · Cited by 91,532
Organizational Information Requirements, Media Richness and Structural Design
Daft, R. L., & Lengel, R. H. (1986) · Management Science · doi:10.1287/mnsc.32.5.554 · Cited by 9,868 · cited 1×
“It helps the project team gather resources synergistically to execute informed decisions through analyzing the collated information from various sources (Daft and Lengel 1986).”
BackgroundAffect and Cognition Based Trust as Foundations for Interpersonal Cooperation in Organizations
McAllister, D. J. (1995) · Academy of Management Journal · doi:10.2307/256727 · Cited by 7,346 · cited 1×
“000 (McAllister 1995; Cummings and Bromiley 1996; Havila et al. 2004).”
BackgroundLewis, J. D., & Weigert, A. (1985) · Social Forces · doi:10.2307/2578601 · Cited by 4,163
Communication and Trust in Global Virtual Teams
Jarvenpaa, S. L., & Leidner, D. E. (1999) · Organization Science · doi:10.1287/orsc.10.6.791 · Cited by 2,903
The Organizational Trust Inventory (OTI): Development and Validation
Cummings, L. L., & Bromiley, P. (1996) · Trust in Organizations: Frontiers of Theory and Research · doi:10.4135/9781452243610.n15 · Cited by 1,012
Cited by
Wu, G., Liu, C., Zhao, X., & Zuo, J. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.08.006 · Cited by 289
Metadata
- Authors
- Cheung, S. O., Yiu, T. W., & Lam, M. C.
- Venue
- Journal of Construction Engineering and Management
- Published
- 2013-08
- Volume
- 139
- Issue
- 8
- Pages
- 941-950
- ISSN
- 0733-9364 (ISSN-L)
- 1943-7862
- OpenAlex
- W4249347082
- Cited by
- 158
- References
- 6
- FWCI
- 5.89
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Interweaving Trust and Communication with Project Performance. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0000681
- The paper
- Cheung, S. O., Yiu, T. W., & Lam, M. C. (2013). Interweaving Trust and Communication with Project Performance. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0000681
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.